ML20008E598

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E598
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8103090254
Download: ML20008E598 (2)


Text

a o

k LM V

6>

FEB 2 01981 o

.x 7h

  1. p(([P 6

Ye; Docket No. 50-346 S 8[$

9D k,

8

-l ATTN:

Mr. Richard P. Crouse

--i

' e#g7( g.

Toledo Edison Company Vice President A

Nuclear

'//

Edison Plaza

'Ib s

300 Madison Avenue

/4 J8ll$

Toledo, OH 43652 Gentlemen:

It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective Feb:uary 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.

8!108090 M 4 P

Toledo Edison Company You will or. arve from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector offices, (2) engineering and other technical support functions including the reactor, fuel facilities and materials programs, and (3) emergency prepared-ness. Included on the charts are the management structure, investigative i

and enforcement staff, State liaison, public affairs and resident inspector program functions.

We look forward to your continued cooperation with this office, and, should you have questions regarding the subject of this letter please call me.

I Sincerely, i.

t

?

James G. Keppler Director

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart 4.

Division of Emergency Preparedness & Operational Support Chart cc w/encls:

T. D. Murray, Station Superintendent Central Files G

RIII RII-Dav /np K p er 2/13/81

~

U.S. NRC REGION III ORGANIZATION OFFICE OF Tile 1)IRECTOR J. G. Keppler, Director A. B.

Davis, Deputy Director i

G. W.

Roy, Asst. to the Director Special Projects Enforcement and f

Office of Public Aff.

Investigation, Staff R. Strasma w

R. Marabito J. F. Streeter Acting y

Q,,

Director

~

.Q

. - ~.

U

([

t c7' Division of Resident and.

Division of Engineering and Division of Emergency Technical Inspection Pr_eyaredness & Operat iona l Sup

\\'

Project inspection R.

F. lleishman, Acting C. E. Norelius, Acting J. A. Ilind, Acting Director

('u I_,,,

Director Director T

D

}Nj

{y Projects Branch 1 Engineering Inspection Emergency Preparedness b"i R. C. Knop, Acting Chief Branch 6 Prog. Support Branch

~

R.

1,. Spessard, Chief C. J. Paperiello, Chief 5

\\

Administrative Support Technical Inspection 11ojects Branch 2 Branch

_ Branch G.

Florelli, Chief W. l.. Fisher, Chief

11. Pappas, Chief

DIVISION OF RESIDENT &

PROJECT INSPECTION R.

F. Ile i sh man, Acting Director Projects Brarg 1 Projects Hranch 2 R. C. Knop, Acting Chief C. Fiorelli, Chief I

Reactor Projects Sec.

lA Reactor Projects Sec.

2A T

D. Boyd,. Chief J. Konklin, Acting Chief

(

Big Rock Point Callaway Midland Fermi Palisades Bailly b-Research Reactor, Fuel Kewaunee Facilities Point Beach A'

7 Reactor Projects Sec.

IB Reactor Projects Sec.

2B w

D. Ilayes, Chief R. Warnick, Chief O

C D. C. Cook Davis-Besse La Crosse Braidwood Byron Perry Zimmer C

Zion N

Reactor Projects Sec.

IC Reactor Projects Sec.

2C F.

Heimann, Acting Chief W. Little, Chief n

Clinton Duane Arnold Dresden Harble 11111 La Salle Monticello Prairie Island Quad-Cities

,.,_-.m_

,.,_,____.w

.w,.n-w..

y w

y-%

4 DIVISIOM OF ENGINEERING AND TECilNICAI, INSPECTION C.

E. Norelius, Acting Director I

Operator Licensing See Materials 1.icensing Section J. Cooper, Jr., Chief (Vacant)

Engineering Inspection Branch Technical inspectton Branch R. L. Spessard, Chief W.

L. Fisher, Chief Hanagement Programs Section Materials RAD Protection Section 1 K. Baker, Chief QA, Procedures D. Wiedeman, Acting Chief Maintenance Survei1 lance Testing

<c;b Training G

Materials RAD Protect ion Plant Systems Section x.

Section 2 r

C. Williams, Chief D. Sreniawski, Acting Chief V

Electrical /I6C Fire Protection Facilities RAD Protection

~

Materialc & Processes Sec.

R. Greger, Acting Chief D. Danielson, Chief Q;

C-

Welding, NDE, ISI Mechanical q

Safeguards Section

~

L'

.I. Creed, Ac t i ng Ch ie f

'A Test Procram Section

(

I. Jackiw, Acting Chief i

Preop Test, Refueling. I I.RT,

Startup Tests, and Physics

DIVISION OF EMERGENCY PREPAREDNESS AND OPERATIONAL S11PPORT J. A. liind, Acting Director Emergency Preparedness State Liaison Officer I.'icensing Branch W.

B. Menczer J. Paglfaro l

~. _

l

~

Administrative Support Br.

Emergency Preparedness 6 Performance Program Support Branch Appraisal C. J. Paperiello, Chief Branch II. Pappas, Chief I

l'N.-

Independent Measurements and

\\

Environmental Protection Sec.

x s.s,/

N' M. Schumacher, Acting Chief w,-

G Labs and Verification Program Environmental Inspection P,

Q Emergency Preparedness Section

~

, ~.,

W. Axelson, Acting Chief

\\. _

Emergency Preparedness incident Response Emergency Plans /Drf11s L

Operational Support Sectton

( n, T. Tambling, Acting Chief VN Management Informations Systema, N

sal.P. Event Review, Hulletins, Circulars, No t i c.:.9

.