ML20008E590
| ML20008E590 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point, Palisades File:Consumers Energy icon.png |
| Issue date: | 02/20/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8103090240 | |
| Download: ML20008E590 (2) | |
Text
($'.1-cS h b k FEB 2 0 W
,mIm Docket No.
-155
'c-
< ft
/[M, ' 1 Docket No. 50-NOl] d
~
Consumers Power Company
-l
" } !
ATTN:
Mr. R. B. DeWitt "4
-D Ns%*otir Vice President Nuclear Operations k
212 West Michigan Avenue 4
U Jackson, MI 49201 S ;;2 V Gentlemen:
It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.
We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.
A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee ma na g-aent.
Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.
These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.
The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.
I 8.1ososo $
f
i l
Consumers Power Company '
I You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector offices, (2) engineering and other technical support functions including the reactor, fuel facilities and materials programs, and (3) emergency prepared-ness. Included on the charts are the management structure, inve-Igative and enforcement staff, State liaison, public effairs and resident inspector program functions.
We look forward to your continued cooperation witr this office, and, should l
you have questions regarding the subject of this it*ter please call me.
6 i
Sincerely, l
James G. Keppler I
Director i
Enclosures:
j 1.
Overall 5egion III Organizatien Chart g
2.
Division of Resident 3
and Reactor Project
'j Inspection Chart 3.
Division of Engineering and Technical Inspection Chart 4.
Division of Emergency Preparedness & Operational Support Chart cc w/encls:
D. P. Hoffman, Nuclear Licensing Administrator C. J. Hartman, Plant Superintendent R. W. Montross, Manager Central Files b.
Davis /np Ke p er 2/13/81 n.,,
e y
y.
a
U.S. NRC REGION III ORGANIZATION OFFICE OF Tile DIRECTOR J. G. Keppler, Director A. B. Davis, Deputy Director G. W. Roy, Asst. to the Director Special Projects V
Enforcement and C[-
Office of Public Aff.
Investigation Staff i
R.
St ras ma
~31, R.
Harabito J. F. Streeter, Acting Director i
W ea
%Q 4T 1:.
- Division of Resident and Division of Engineering and
- Divisim,
't Emergency E
Technical inspection Preparedness & 3perational Su 2 ss f[
Project inspection sd R.
F. IIelshnun, Act ing C.
E. Norelius, Acting J. A. Ilind, Acting Director Director Director Projects Branch 1 Engineering Inspection Emergency Preparedness R. C. Knop, Acting Chief Branch
& Prog. Support Branch
~""
R.
1.. Spessard, Chief
. J. Paperiello, Chief Projects Branch 2 Technical Inspect ion Administrat ive Support Branch
__Hranch G.
Fiorelli, Chief W. l.. Fisher, Chief 11. Pappas, Chief
DIVISION OF RESIDENT &
PROJECT INSPECTION R. F. lleishman, Acting Director I
Projects Branch 2 Projects Branch 1 r.
R. C. Knop, Acting Chief C. Fiorelli, Chief Cr Cdv Reactor Projects Sec.
IA Reactor Projects Sec.
2A D. Boyd, Chief J. Konklin, Acting Chief y)
Big Rock Point Callaway Midland Fermi Palisades Bailly b
Research Reactor, Fuel Kewaunee d
Facilities Point Beach G-Reactor Projects Sec.
IB Reactor Projects Sec.
2B k
D. Ilayes, Chief R. warnick, Chief N
N Davis-Besse O
D. C. Cook La Crosse Braidwood Perry Byron Zimmer Zion Reactor Projects Sec.
IC Reactor Projects Sec.
2C
~
F.
Reimann, Acting Chief W. I,ittle, Chief Duane Arnold Clinton Dresden Marble 11111 I,a Salle Monticello Prairie Island Quad-Cities
DIVISION OF ENGINEERING AND TECilNICAl, INSPECTION C. E. Norelius, Acting Director Materials Licensing Operator Licensing Sec Section J. Cooper, Jr., Chief (Vacant)
I Engineering Inspection Branch Technical Inspection Branch W. L. Fisher, Chief R. L. Spessard, Chief Hanagement Programs Sect ion Materials RAD Protection Section 1 K. Baker, Chief QA, P rocedu res D. Wiedeman, Acting Chief
( p.
Maintenance Surveillance Testing 4-~
Training Materials RAD Protection Plant Systems Section Section 2 L__
C. Williams, Chief D. Sreniawski, Acting Chief
%s, Electrical /I6C s
Fire Protection qg Civil jf{
Facilities RAD Protection Section
}
Materials & Processes Sec.
R. Greger, Acting Chief rs D. Danielson, Chief h*N Welding, NDE, ISI
[d Mechanical Sa feguards Sect ion C
J. Creed, Acting Chief JY
! Test Procram Sect i on I. Jackiw, Acting Chief Preop Test, Refueling, II.RT, Startup Tests, and Physics
DIVISION OF EMERGENCY PREPAREDNESS AND OPERATIONAL SUPPORT J. A. Illnd, Acting Director State Liaison Officer Emergency Preparedness Licensing Branch W. B. Menczer J. Pagliaro i
i 1
Administrative Support Br.
Performance Program Sepport Branch Appraisal C. J. Paperiello, Chief Branch II. Pappas, Chief Ind ependen t Measurements anxi S'
Envi ronmental Protect ion Sec.
E M. Schumacher, Acting Chief bO, Labs and Verification Program Environmental Inspection 9O Emergency Preparedness Section s
b W. Axelson, Acting Chief Emergency Preparedness qqi Incident Response Emergency Plans / Drills Operational Support Section T. Tambling, Acting Chief Management Informations Systems, SAI.P. Event Review, Bulletins, Circulars, Notices
_