ML20008E560

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E560
Person / Time
Site: Marble Hill
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8103090208
Download: ML20008E560 (2)


Text

k&W h

, ~.

ns:o em Docket No. 50-546 A

Docket No. 50-547 S

Q>

Public Service of Indiana ATTN:

Mr. S. W. Shields A

gI Senior Vice President C

4 Nuclear Division p&

7 Post Office Box 190 D'

10 New Washington, IN 47162 i's

%\\ y

,'/

{/j' Gentlemen:

//,

s

'i It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the THI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. Thete will

~

be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.

g 8103090'206

i

Public Service of Indiana

  • You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector offices, (2) engineering and other technical support functions including the l

reactor, fuel facilities and materials programs, and (3) emergency prepared-Included on the charts are the management structure, investigative ness.

and enforcement staf f, State liaison, public affairs and resident inspector program functions.

l l

We look forward to your continued cooperation with this of fice, and, should l

you have questions regarding the subject of this letter please call me.

Sincerely, l

James G. Keppler Director

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart f

4.

Division of Emergency l

Preparedness & Operational Support Chart cc w/encls:

W. M. Petro, Project Director Steve J. Brewer, Nuclear Safety and Licensing Supervisor Central Files i

l l

RII RII C

Davis /np Kepp er 2/13/81

)

U.S. NRC REGION III ORGANIZATION OFFICE OF Tile DIRECTOR J. G. Keppler, Director A. B. Davis, Deputy Director G. W. Roy, Asst. to the i

h' Director Special Projects

.SN Enforcement and office of Public Aff.

Investigation. Staff R. Strasma g

k R. Marabit J. F. Streeter, Acting Director b

cO N

P Divisloa of Resident and Division of Engineering and Division of Fmergency Proj ec t Inspection Technical Inspection Preparedness & Operational Sup R. F. lleishman, Acting C. E. Norelius, Acting J. A. Hind, Acting Director Director Director Projects Branch 1 Engineering Inspectfon Emergency Preparedness R. C. Knop, Acting Chief Branch

& Prog. Support Branch

~

R. L. Spessard, Chief C. J. Paperiello, Chief Administrative Support Projects Branch 2 Technical Inspection

_ Hranch

_ Branch G. Fiore111, Chief W. L. Fisher, Chief II. Pappas, Chief

e e

DIVISION OF RESIDENT &

PROJECT INSPECTION R.

F. lieishman, Acting Director i

Projects Branch 1 Projects Branch 2 R. C. Knop, Acting Chief G. Fiore111, Chief

't,- f, e

'%3-Resctor Projects Sec.

IA Reactor Projects Sec.

2A L._.

D. Boyd, Chief J. Konklin, Acting Chief (J

Big-Rock Point Callaway Midland Fermi j{5 Palisades Bailly 4bD Research Reactor, Fuel Kewaunee Facilities Point Beach

\\33 G

Reactor Projects Sec.

IB

-C Reactor Projects Sec.

2B pf[

D. Ilayes, Chief R. Warnick, Chief b3 CDN D. C. Cook Davis-Besse (53 Braidwood La Crosse Byron Perry N

Zion Zimmer Reactor Projects Sec.

1C Reactor Projects Sec.

2C F. Reimann, Acting Chief W. Little, Chief Clinton Duane Arnold Dresden Marble Hill i

La Salle Monticello Prairie Island Quad-Cities

DIVISION OF ENGINEERING AND TECHNICAL INSPECTIOM i

C. E. Norelius, Acting Director Materials Licensing Operator Licensing Sec Section J. Cooper, Jr., Chief (Vacant) t i

Engineering Inspection Branch Technical Inspection Branch R. L. Spessard, Chief W. L.

Fisher, Chief Hanagement Programs Section Materials RAD Protection K.

Baker, Chief QA, Procedures D. Wiedeman, Acting Chief

^

D Maintenance F;

Surveillance Testing

'07 Training Materials RAD Protection

-((

Plant Systems Section Section 2 v

C. Will iams, Chief D. Sreniawski, Acting Chief Electrical /16C ej 4-Fire Protection 9

Civil sjs:

Facilities RAD Protection Section sql Materials & Processes Sec.

R. Creger, Acting Chief

's D. Danielson, Chief CS Welding, NDE, ISI p,

Mechanical Safeguards Section Qj J. Creed, Acting Chief (sj Test Procram Secelon I. Jackiw, Acting Chief Preop Test,' Refueling, ILRT, Startup Tests, and Physics

4 DIVISIOil OF EMERGENCY PREPAREDNESS AND OPERATIONAL SUPPORT i

J. A. Ilind, Acting Director State Liaison Officer Emergency Preparedness Licensing Branch W. B. Menczer J. Pagliaro I

I Administrative Support Br.

Emergency Preparedness &

Performance Program Support Branch Appraisal R[-

C. J. Paperiello, Chief Branch II. Pappas, Chief "T r i

L Independent Measurements and

'7[)

Environmental Protection Sec.

M. Schumacher, Acting Chief DO Labs and Verification Program s s, Environmental Inspection

()

Q'.

C' Emergency Preparedness Section C[

W. Axelson, Acting Chief

~s

(\\

Emergency Preparedness Incident Response Emergency Plans / Drills

-- O Operational Support Section T. Tambling, Acting Chief Management Informations Systens, SALP, Event Review, Bulletins, Circulars, Notices

-,