ML20008E503

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E503
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8103090113
Download: ML20008E503 (2)


Text

s.

f*,,t.25ef W,oL' 4

FEB 2 01981 Docket No. 50-440 m @

Docket No. 50-441 4

c3 The Cleveland Electric Illuminating p(g 8 - ((( 0)

Company yg 4 ATTN: Dalwyn R. Davidson g/

r 8

Vice President - System

\\ g74

/

Engineering and Construction

(

g/

Post Office Box 5000 4

%,'//-s p #>

Cleveland, OH 44101 Gentlemen:

It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe tt.is exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 2'4-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.

P 810809 o G N

i j

The Cleveland Electric Illuminating Company i

1 You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector offices, (2) engineering and other technical support functions including the reactor, fuel facilities and materials programs, and (3) emergency prepared-i ness. Included on the charts are the management structure, investigative and enforcement staff, State liaison, public affairs and resident inspector program functions.

We look forward to your continued cooperation with this office, and, should

{

you have questions regarding the subject of this letter please call me.

I Sincerely, j

f James G. Keppler Director

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident i

and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart 4.

Division of Emergency Preparedness & Operational Support Chart t

cc w/encls:

Central Files

)

i I

i f

i P

I I

RI RII{g Davis /np Ke pler 2/13/81

+

n

U.S. NRC REGION III ORGANIZATION 9

OFFICE OF Tile DIRECTOR l

J. G. Keppler, Director A. B. Davis, Deputy Director G. W.

Roy, Asst. to the Director Special Projects Enforcement and Office of Public Aff.

Investigation. Staff K

R. Strasma C

J. F. Streeter, Acting R. Marabito

%)

Director L

%D 00 L

.tvision of Engineering and Division of Emergency D

Division of Resident and Technical Inspection Preparedness & Operational Sup Project inspection R.

F. Ilcishman, Acting C.

E. Norelius, Acting J. A. Illnd, Acting Director Director 5

Director O

N

&Q Projects Branch 1 Engineering Inspection Emergency Preparedness Branch

& Prog. Support Branch R. C. Knop, Acting Chief

~

R.

l.. Spessard, Chief C. J. Paperiello, Chief Administrative Support Projects Branch 2 Technical Inspection

_ Branch

_ Branch G.

Florelli, Chief W. l.. Fisher, Chief

11. Pappas. Chief 1

\\

I DIVISION OF RESIDENT &

PROJECT INSPECTION R.

F. lleishman, Acting Director f

I Projects Branc_h 1 Projects Branch 2 R. C.

Knop, Acting Chief C.

I1orelli, Chief NO N

cS i

G J

Reactor Projects Sec.

IA Reactor Projects Sec.

2A CO D. Boyd, Chief J. Konklin, Acting Chief Big Rock Point Callaway g~,

Midland Fermi Palisades Bailly g.

Research Reactor, Fuel Kewaunee Facilities Point Beach g

N C>

Reactor Projects Sec.

IB Reactor Projects Sec.

2B h

D. tiayes, Chief R. Warnick, Chief CN,

'r D. C. Cook Davis-Besse D-Brafdwood La Crosse Byron Perry Zi nene r Zion Reactor Projects Sec.

IC Reactor Projects Sec.

2C F. Reimann, Acting Chief W. l.ittle, Chief Clinton Duane Arnold Dresden Marble 11111 1.a Salle Monticello Prairie Island Quad-Ci t i es

I t

4

\\

DIVISION OF ENGINEERING AND t

TECllNICAI, INSPEC.7 ION l

C. E. Norelius, Acting Director i

l Materials Licensing l

Operator Licensing See Section (Vacant)

J. Cooper, Jr., Chief

~-

_((7 %

Engineering Inspection Branch Technical Inspection Branch W. L. Fisher, Chief

~

R. L. Spessard, Chief W

(I D

Hanagement Programs Section Materials RAD Protection Section 1 S.

K. Baker, Chief

~

GE >

QA, Procedures D. Wiedeman, Acting Chief Maintenance Surveillance Testing

',ts, Training D

Materials RAD Protection Plant Systems Section Section 2

{ 's C. Williams, Chief D. Sreniawski, Acting Chief D

Electrical /I6C (2'

Fire Protection Q

Civil Facilities RAD Protection

(~.

"U

~"~

{(,

Materials & Processes Sec.

R. Greger, Acting Chief D. Danielson, Chief Welding, NDE, ISI

"*C C"

(,\\)

Sa f eguard s Sect ion J. Creed, Acting Chief Test Procram Section I. Jacktw, Acting Chief Preop Test, Refueling, ILRT, Startup Tests, and Physics

DIVISION OF EMERGENCY PREPAREDNESS AND OPERATIONAL. SUPPORT J. A. Il l nd, Acting Director Emergency Preparedness State Liaison Officer Licensing Branch W. B. Mencaer J. Pagliaro I

w 1

k1 Administrative Support Br.

Emergency Preparedness &

Performance

'*~s Program Support Branch Appraisal

[y,,

s m

C. J. Paperiello, Chief Branch 11. Pappas, Chief q%

%~

Independent Measurements and Environmental Protection Sec.

[

M. Schumacher, Acting Chief (7s Labs and Verification Program Environmental Inspection MJ D

Emergency Preparedness Section rss

%s,

s (2N W. Axelson, Acting Chief N

()']p" Emergency Preparedness Incident Response Emergency Plans / Drills b

operational Support Section T. Tambling, Act ing Chief Management Informat ions Systems, SAI.P. Event Review, Hulletins.

Circulars, Notices

.