ML20008E499

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E499
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8103090107
Download: ML20008E499 (2)


Text

^

[t' i

,'>N'

('

s Rb201981

_y DI /g Docket No. 50-409 Dairyland Puer Cooperative

, 7

  1. '4 E

I0 C

ATTN:

Mr. F. V. Linder

' !887 General Manager g

U 2615 East Avenue - South j

La Crosse, WI 54601 g

Gentlemen:

i It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major censideration growing out of the Three Mile Island Incident, was

(

the need for realignment of the NRC Office of Inspection and Enforcement (IE)

I organizational structure. Recommendations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection pcogram, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There wrl.

be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New tele; hone extensions for the staff will be provided as they become available.

p 8103090\\o-[

p

~.

[

s 2-Dairyland Power Cooperative You will observe from the enclosed charts that the essential elements of the I

new organization are (1) project management including the resident inspector i

offices, (2) engineering and other technical support functions including the f

reactor, fuel facilities and materials programs, and (3) emergency prepared-ness. Included on the charts are the management structure, investigative and enforcement staff, State liaison, public affairs and resident inspector program functions.

We look forward to your continued cooperation with this office, and, should you have questions regarding the subject of this letter please call me.

Sincerely, i

James G. Keppler Director Enclosures-1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart i

3.

Division of Engineering and i

Technical Inspection Chart i

4.

Division of Emergency Preparednes- & Operational Support Chart l

cc w/encls:

R. E. Shimshak, Plant Superintendent Central Files i

[

?

6 I

RII RII:

Davis /np K pler 2/13/81 c

+,

c

U.S. NRC REGION III ORGANIZATION OFFICE OF Tile DIRECTOR e

J. G. Keppler. Director A. B. Davis, Deputy Director G. W.

Roy, Asst. to the Director Special Projects Enforcement and Office of Public Aff.

Investigation Staff R. Strasma R. Harabit J. F. St reeter, Acting Director

(

d _.

4_

\\

D g't

(

Division of Resident and Division of Engineering and Division of Emergency

\\

Project Insper:t ion '

Technical Inspection Preparedness & Operational Sup R.

F. Ileishman, Acting '

C. E. Norelius, Acting J. A. Hind, Acting Director I

(jd Director Director O

Q L:

Bt Projects Branch 1 Engineering Inspection Emergency Preparedness

\\

i' R. C. Knop, Acting Chief Branch

& Prog. Support Branch

~

R.

l.. Spessard, Chief C. J. Paperiello, Chief k

s Projects Branch 2 Technical Inspection Administrative Support Branch

_Hranch G.

Florelli, Chief W.

I..

Fisher, Chief l **. eappas Chief 4

DIVISION OF RESIDENT &

PROJECT INSPECTION R.

F. lleishman, Acting Director I

Projects Branch 1 Projects Branch 2 R. C. Knop. Acting Chief G.

Florelli, Chief Reactor Projects Sec.

lA Reactor Projects Sec.

2A

\\

.,g; D. Boyd, Chief J. Konklin, Acting Chief

'h Big Rock Point Callaway Midland Fermi L_

Palisades Bailly Research Reactor, Fuel Kewaunee Q

Facilities Point Beach Reactor Projects Sec.

IB Reactor Projects Sec.

2B Q.

D. Ilayes, Chief R. Warnick, Chief Y

,N N.,

D. C. Cook Davis-Besse Braidwood I.a Crosse

[

Byron Perry rI' Zfon Zimmer L-Reactor Projects Sec.

IC Reactor Projects Sec.

2C

)

F.

Reimann, Acting Chief W. 1.ittle, Cl.lef s/

l/T N

Clinton Duane Arnold Dresde.n Marble Hill I.a Salle Monticello Quad-Cities Prairie Island

DIVISION OF ENGINEERING AND TEC11NICAI, INSPFCTION C. E. Norelius, Acting Director Operator Licensing Sec Maler tals Licensing Section (Vacant)

J. Cooper, Jr., Chief I

Technical Inspection Hranch Engineering Inspection Branch W. L. Fisher, Chief R. L. Spessard, Chief f

~Y7~

'iana gemen t Programs Sect ion Materials RAD Protection br Section 1

[p '

K. Baker, Chief

'**q-QA, P rocedu res D. Wiedeman, Acting Chief

\\J Fb intenance L --

Surveillance Testing Training

~s s V

Materials RAD Protection Plant Systems Section Section 2 C. Will iams, Chief D. Sreniawski, Act ing Chief

((s Electrical /16C 1

Fire Protection

~~~~

Civil

{]p Facilities RAD Protection Section

'\\)

Fbterials & Processes Sec.

R. Greger, Acting Chief f

'I' '

D.

Danielson, Chief C'

Welding, NDE, ISI p-Mechanical SafeRuards Section h,e J. Creed, Acting Chief C'

Test Program Section

()

I. Jackiw, Acting Chief Preop Test, Refueling, l l.RT Startup Tests, and Physics

DIVISION OF EMERGENCY PREPAREDNESS AND OPERATIONAL S_UPPORT J. A. Illnd, ActinP, Director State Liaison Officer Emergency Preparedness Licensing Branch W. B. Henczer J. Pagliaro 1,*

I I

Administrative Support Br.

Emergency Preparedness &

Performance Program Support Branch Apprals.71 C. J. Paperiello, Chief Branch II. Pappas, Chief D

Independent Measurements and Environmental Protection Sec.

Y,\\

M. Schumacher, Acting Chief Labs and Verification Program D

Environmental Inspection Emergency Preparedness Section W. Axelson, Acting Chief h

Emergency Preparedness O

Incident Response Emergency Plans / Drills

~N C'

Operational Support Sectton (i

T. Tambling, Acting Chief b(.3 q]

flanagement Informations Systems, SALP, Event Review, Bulletins, Circulars, Notices

_