ML20008E396
| ML20008E396 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/02/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Koester G KANSAS GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8010270520 | |
| Download: ML20008E396 (1) | |
Text
7.ZC o
UNITED STATES
/ps arc NUCLEAR REGULATORY COMMISSION
/^
REGloN IV
% g [i,,j ARLINGTON, TEXAS 76012 I
o 611 RYAN Pl.AZA DRIVE, SUITE 1000 d '
%o G'4 a r
/
October 2, 1980 In Reply Refer To:
RIV c
Docket No. -STN 50-482/IE Circular No. 80-22 Kansas Gas & Electric Co.
Attn:
Mr. Glenn L. Koester Vice President-Nuclear Post Office Box 208 Wichita, Kansas 67201 Gentlemen:
The enclosed IE Circular No. 80-22 is forwcrded to you for information.
No written response is required. Should you have any questions relat.ed to your understanding of the recommendations on this matter, please contact this office.
Sincerely, p~
- > ' [f* ( v
- q Karl V. Seyfrit
[
Director
/
Enclosures:
1.
IE Circular No. 80-22 2.
List of Recently Issued IE Circulars cc: w/ enclosures Messrs. Nicholas A. Petrick, SNUPPS D. T. McPhee, Kansas City Power and Light Company Gerald Charnoff, Shaw, Pittman, Potts & Trowbridge E. W. Creel, Kansas Gas and Electric Company 8010370 520 Q
.c'
?"r D 9[d" y
og g SSINS:
6830 Accession No.:
8006190055 IEC 80-22 UNITED STATES NUCI. EAR REGUI.ATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 80-22 Date:
October 2, 1980 CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actious a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.
In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and canfirmed previous career experiences.
In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.
We are hereby recoM9ending that your employnent procedures be reviewed to determine that your company has in effect employment policies which cor. firm the professional qualifications of employees.
In the event you conclude that your.present procedures do not fully address this matter, we recommend that you take prompt remedial action in this regard.
No written response to this Circular is required.
If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
IE Circular No. 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.
Issued 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor Westinghouse Fuel Operating Licenses (OLs)
Assemblies and Construction Permits (cps) 80-1*
Radioactive Contamination 6/24/80 All holders of Power and of Plant Demineralized Research Reactor Licensees Water System and Resultant (Operating and Construction Internal Contamination of Permits), and Fuel Cycle Personnel licensees 80-15 Loss of Reactor Coolant 6/20/80 All power reactor facilities Pump Cooling and Natural with an Operating License (OL)
Circulation Cooldown or Construction Permit (CP) 80-16 Operational Deficiencies 6/27/80 All power reactor facilities in Rosemount Model 510DU with an 9perating License (OL)
Trip Units and Model 1152 or a Construction Permit (CP)
Pressure Transmitters 80-17 Fuel Pin Damage Due to 7/23/80 All holders of PWR Operating Water Jet from Baffle Licenses (OLs) and PWR Plate Corner Construction Permits (cps) 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor facilities Evaluations for Changes to with an Operating License (OL)
Radioactive Waste or a Construction Permit (CP)
Treatment Systems 80-19 Noncompliance with 8/26/80 All medical lf aes License Requirements for Medical Lic msees 80-20 Changes in Safe-Slab 8/21/80 All Part 50 and Part 70 Dimensions fuel facility licensees 80-21 Regulation of Refueling 9/10/80 All holders of a power reactor Crews Operating License (OL) or a Construction Permit (CP)
Enclosure
,