Forwards IE Insp Repts 50-460/80-06 & 50-513/80-06 on 800429-0502 & Notice of Violation
ML20008E332
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/11/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20008E333 List:
References
NUDOCS 8010240579
Download: ML20008E332 (2)


See also: IR 05000460/1980006

Text

-

.

.-- - - _ _ _ - _ _

_ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ - _

T/C.

af

o

UNITED STATES

g

3

7o

NUCLEAR REGULATORY CO.AMISSION

$

/ E

REGION V

&[

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

.

4,,,*

WALNUT CREEK. CALIFORNIA 94596

M I1 1980

'

Docket Nos. 50-460

50-513

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. N. O. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project Nos.1 and 4

This refers to the inspection conducted by Mr. T. W. Bishop and

G. Hernandez of this office on April 29-May 2,1980 of activities

authorized by NRC Construction Permit Nos. CPPR 134 and 174, and to the

discussion of our findings held by Mr. T. W. Bishop with Mr. J. P. Thomas

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Based on the results of this ir.spection, it appears that certain

of your activities were not conducted in full compliance with NRC

requirements, as sd forth in the Notice of Violation, enclosed herewith

as Appendix A.

These items of noncompliance have been categorized into

a level as described in our correspondence to all NRC licensees dated

December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201, of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations. Section 2.201 requires you to submit to

this' office, within thirty (30) days of your receipt of this notice, a

written statement or explanation in reply including (1) corrective steps

which have been taken by you and the results achieved; (2) corrective

steps which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

The findings from the most recent inspection include: a continuing item of

noncompliance in the area of contractor drawings where the corrective

actions taken did not achieve full compliance, one instance where the actions

taken in response to a previously identified item of noncompliance concerning

procurement documents were not in agreement with your written response to

this office, and an item of noncompliance in the area of cleanliness control

.

and storage of safety related equipment that remained uncorrected despite

the numerous times this concern had been identified by the NRC inspector

and your site inspection staff. A description of these items.is included

herewith as Appendix B.

'

0102406@

p

_

,

.

Washington Public Power Supply System

-2-

JUL 11 1980

,

When reviewed collectively, these findings demonstrate a weakness in those

management controls provided to assure effective corrective actions are

taken to resolve quality prob %ms.

In addition to your response to the

.ompliance identified in the Notice of Violation,

apparent specific items of r

please provide us a writter, wplanation of the cause of the items identified

in the enclosed Appendix B and '5e steps you will take to assure that timely

and effective corrective actions are taken on identified quality problems.

In accordance with S.

tun 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you ubmit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application shoulo be prepared so that

any proprietary informs. tion identified is contained iri an enclosure to

the application, since the application without the enclosure will also

be placed in'the Public Document Room.

If we do not hear from you in

-

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

$k

,

R. H. Engelken

s

-

Director

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Findings Regarding Ineffective Corrective Actions

3.

IE Inspection Report

Nos. 50-460/80-06

50-513/80-06

.

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS