ML20008E310
| ML20008E310 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 10/09/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20008E311 | List: |
| References | |
| NUDOCS 8010240546 | |
| Download: ML20008E310 (1) | |
Text
I $
gc cecu 8
UNITED STATES
!j3c,gg('g
((b NUCLEAR REGULATORY COMMISSION g
a/\\ "#/
c REGION 111 g[
799 ROOSEVELT ROAD 0,
%
- b3 GLEN ELLYN,ILLINolS 60137
- ..+
OCT 9 G80 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Thank you for your final report dated September 19, 1980, pursuant to 10 CFR 50.55(e) regarding MSIV Lenkage Control System. We will complete our review of this matter during a ftdure inspection.
Your cooperation with us is appreciated.
Sincerely, Sc bg G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files Mr. J. S. Abel, Director of Nuclear Licensing Mr. L. J._ Burke, Site Construction Superintendent Mr. T. E. Quaka, Quality Assurance Supervisor Mr. R. H. Holyoak, Station Superintendent Mr. B. B. Stephenson, Project Manager cc w/1tr dtd 9/19/80:
Central Files Resident Inspector, RIII PDR Local PDR NSIC TIC Mr. Dean Ha.-.21., Office of Assistant Attorney General 8010240 Mg y
_.