Forwards IE Insp Repts 50-566/80-13 & 50-567/80-13 on 800805-08.No Noncompliance Noted
ML20008D844
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 09/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20008D845 List:
References
NUDOCS 8010230254
Download: ML20008D844 (2)


See also: IR 05000566/1980013

Text

F

'

an neo

/

UNITED STATES

o

~

/

NUCLEAR REGULATORY COMMISSION

o

$

aE

REGION 11

t

Q,

'f

101 MARIETTA ST., N.W. sulTE 3100

b

o

ATLANTA, GEORGIA 30303

In Reply Refer To:

SEP 041980

RJI4JL

0-566/80-13

W l!**'13

Tennessee Valley Authority

.

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by J. L. Coley of this office on August 5

through 8,1980 of activities authorized by NRC Construction Permit Nos. CPPR-172

and CPPR-173 for the Yellow Creek facility, and to the discussion of our findings

held with M. M. Price at the conclusion of the inspection.

t

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

l

personnel, and observations by the inspector.

!

Within the scope of this inspection, no items of noncompliance were disclosed.

l

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

!

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item wi.1 be examined during subsequent inspections.

(

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

!

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or yaur contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public discleaure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

!

mation identified in the application is contained in a separate part of the

l

document. If we do not hear from you in this regard within the specified period,

'

the report will be placed in the Public Document Room.

.

.

'

8010230254

.

(..c.-___..........--~-..-.

. ...

l

l

!

,

ha

SEP 0 41980

Tennessee Valley' Authority

-2-

,

l

l

Should you have any questions concerning this letter, we will be glad to discuss

- them with you.

Sincerely,

'

-

Y.

l-

l

C. E. Murphy, Ch' f

j

Reactor Construction and Engineering

i

Support Branch

l

l

Enclosure:

!

Inspection Report Nos. 50-566/80-13

and 50-567/80-13

!"

cc w/ encl:

i

J. F. Cox,LSupervisor, Nuclear

!

Licensing Section

M.- M. Price, Project Manager

.

M. A. McBurnett, Project Engineer

l

H. N. Culver, Chief, Nuclear-

L

Safety Review Staff

!

4

A

6

l

l

l

.