PART 21 liBUlFICATION NO.
iso -T.ns - 00)
C@PANY NVE"h Ldo'Mr.
m1E 0: IEER iM*o D00(ET NO.' b-4G DATE DISTRIBlHED tobito a.m.
ORIGIRAL EPORT StPPLBEHARY y.
DISTRIBUTION:
EACTOR (R) 1 FIEL CYCLE &
SAFEGllARDS(S) l%TERIALS GD IE FILES IEFILES AD/ROI IEFILES AD/SG AD/RCI AD/FRSI AD/RDI EGIO!G 1,II,'lli,lV,V EGIONS 1,II,lli,lV,V EGIONS 1,II,III,lV,V VSO3R BR. R-IV V$DDR BR. R-IV VEND 3R BR R-IV LEB / FPA FIG 5715 N"3S / FCPS SS-395 NRP/D7m AEOD FIG 7602 LDEB/ PPA FTB 5715 INSS / SG SS-881 NRR/ DOE AEDD FIG 7602 LDEB/FPA tIG 5715 NRR/DSI ASLBP E/W 450 AEOD l16 7602 MT SA /SP fig-7210A ASBP E/W 450 NRR/D3L CENTPAL FILES 016 CENTRALFILES 016 ASLBP E/W 450
~
j CBM FILES ( GRO:0 CBERAL FILES (GRDIO CBERALFILES 016 PDR CEhTPAL FILES SS-395 l
CBERAL FILES (G RODD LPDR PDR l
PDR TEPA LPDR 3q.
TERA
\\
l TEPA
' ACTION:
PRELIMINARY EVALUATION OF THE' ATTACHED REPORT IfDI'>JES LEAD RESPONSIBILITY FOR FO'LOh'JP AS SH3hN BELOW:
IE 1
NRR[
leBS [
OlER sa FMSI P&,8/1/80 go10230/N 5
4,12
~
nu Pur 7.A 10 6
=
E
~ ~ ~
So 493-ool
(
%-a TubeTurnsDivision h-Q(3 catutinou coeponen i
Box 32160. Louisville. Kentucky 40232 Telephone 502 774-6011 October 1,19c7 U. S. Nuclear Regulatory Ccx=ission 7920 Norfork Avenae Bethesda, Maryland 20014 Attention: Director, Office of Inspection & Enforcement
Reference:
10CFR21 Notification Fitting Recall Notice - Resubmittal Letter
Dear Sir:
This letter is a resub=ittal of the letter sub=itted by Tube Turns on July 3,1980, to provide additional details of the occurrence in the femat described in 10CFR21 and to explain the ti=ing of our o.W notification to you.
Name and Address of Infomer Tube Turns - Division of Chemetron Corp.
2900 West Broadway Louisp li e, Ky.
Identification:of camponent (1) 3" Long Rad $us Standard Weight SA234WPB Carbon Steel supplied which contains a Elbow Identified with Lot Number W8806.
defect.
Identification of fi= con-Duke Power Co.
structing the facility or Newport, South Carolina supplying the basic co.~po-Catawba Plant nent which contains a de-feet.
Supplied through Hub Inc., Pied:nont-Hub P. O. Bar 11438 Greenboro, North Carolina Nature of defect and the The chemical analysis of this elbow does not confo= to safety hacard which is the requirement of SA234WPB.
The elbow is made fran created or could be steel which contains a high carbon content of.40% and created by such defect.
Mn of 1.26% which'may'cause cracking in the weld or heat affected zone if special precautions not taken.
Tube Turns Division. Member A*!TTAS GlWXP Allegheny Ludlum lndustries. Inc.
N' Y
'~$
- m
'I T
'T "I
9 1
a 1
IUDB IUrDSUIVISTOn CMEMf7 0N Comp 0RcroN 4
, U. 3. 'Huelsar Rrgulatory Ccamission 10/1/80 Date on which this infoma-Amco notified Tube Turns on May 12, 1980 that they tion of such' defect was suspected that their Heat 200245 mcy contain seme obtained.
A mco Grade J55 =aterial. Tube Turns verified that there was a low percentage of the J55 material present in this heat.
Tube Turns had at this point shipped some p:oducts free this heat of steel identified as Lot Nu=ber W8806.
There were some fittings in the warehouse, in production and in our raw material yard.
All of this suspect material was pulled from production and tested by a metallurgical service cccpany hired by Amco.
At this point, a review was made to detemine if any of this potentially defective material was used for nuclear. application. It was determined that we had shipped two orders. One order was shipped to Hub Inc.-Piedmont-Hub.
This order was for 19-3" Standard Weight Lcog Radius 90* elbows SA234 WPB on their Order T-33060 ADD-Repl.
These elbows were shipped to Duke Power, Catawba plant.
The other order shipped to Chicago Tube and Iron, Chicago, Ill, on Order V14976.
Tnis order was for 22-21/2 x 2 Standard Weight Concentric Reducers SA23kWPB. These reducers were shipped to Baldwin Associates Clinton Power Station.
l Tube Turns notified Hub-Inc. and Chicago Tube & Iron on May 21,1980 by phone and in writing on June 10 to return subject fittings to Tube Turns.
Both Hub and Chicago Tube & Iron reported that these parts had been shipped to their custccers.
They i=nediately contacted Baldwin and Associates and l
Duke Power to return the fittings.
Tube Turns advised the NP.C originally on July 3,1980 that shipments of potentially defective fittings had been made to Nuclear Power Plants and that we had at that time not tested the material to determine if it was, in fact, defective.
The fittings which were at Duke Power were returned directly to Tube Etrns.
Tube Turns did not receive the 19 elbows until July 18, 1980.
The fittings which were at Baldwin and Associates Clinton Power. Station were returned to Chicago Tube
& Iron, who then returned them to Tube Turns on Sept. 2,1980.
Tube Turns Division. Member A*FTTAS GMP Allegheny Ludlum industries, Inc.
~
s e
IUDe IUmSUIVISI n CHEMETRON CO8t*ORATs0N U. S. Nuclear Regulatory Co=ission J LWl cN'-
'10/1/80 The fittings returned by Duke Power were tested on either S/9 or 8/12.
One of these pieces was rejected as beirg Armco J55 =aterial.
The cther pieces were accepted c.nd returned to stock, The potentially defective fittings returned from Clinton Power were tested on September 22, 1980, and all were found to be acceptable.
This letter now confirms that only one piece was defective and it is located at our Tube Turns Louisville plant.
Number and Location of In Use all defective components There a e no defective fittings in use.
in use, supplied for er being supplied to Nuclear Sutclied Fcr Plant s Dake Power Baldwin & Associates Beine Sutclied To Mone Corrective Action The root cause of this nonconformance is the mixing of different grades of steel at the producing tills.
Because of previous occurrences, Tube Turns has been instrumental in two = ills establishing alloy verifi-cation programs. Arsco did not have such a program, however, this was our first occurrence with their mixing materials.
Tube Turns has' instituted their own m y verifica-o tien p ogram.
This progra: began over a year ago l
and we have progressively been able to test mere material. Presently, we are verifying that each l
random length of pipe used on fitting crders is =ade frem the correct grade of material.
l Sineerely, W
g L. E. Hayden, Jr.
Vice President - Engineering JLS/dat l
Tube Turns Division. Member AL41'.TdLS GOUP Auegheny Ludium Industries. Inc.