GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 7
ML20007E369
Person / Time
Site: 05200001, 05200045
Issue date: 12/20/2019
From: Michelle Catts
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation
Shea J
References
GEHITACHIABWR, GEHITACHIABWR.SUBMISSION.8, 25A5675.P, 25A5675.P.7
Download: ML20007E369 (83)


Text

25A5675BH Revision 7 October 2019 ABWR Design Control Document Tier 2 Chapter 21 Volume 7 Copyright 1994, 2010, 2016, 2019 GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Chapter 21 Volume 7 List of Figures Figure 8.3-1 Electrical Power Distribution System SLD (Sheets 1-3) .......................................21-696 Figure 8.3-2 Instrument and Control Power Supply System SLD...............................................21-699 Figure 8.3-3 Plant Vital AC Power Supply System SLD (Sheets 1-2) .......................................21-700 Figure 8.3-4 Plant DC Power Supply System SLD (Sheets 1-3) ................................................21-702 Figure 9.1-1 Fuel Pool Cooling and Cleanup System P&ID (Sheets 1-3)..................................21-705 Figure 9.1-2 Fuel Pool Cooling and Cleanup System PFD (Sheets 1-2) ....................................21-708 Figure 9.1-12 Plant Refueling and Servicing Sequence ................................................................21-710 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheets 1-9) ................................21-711 Figure 9.2-1a Not Used Figure 9.2-2 HVAC Normal Cooling Water System P&ID ........................................................21-720 Figure 9.2-3 HVAC Emergency Cooling Water System P&ID (Sheets 1-3) .............................21-721 Figure 9.2-4 Makeup Water System (Condensate) P&ID ...........................................................21-724 Figure 9.2-5 Makeup Water System (Purified) P&ID (Sheets 1-3) ............................................21-725 Figure 9.2-7 Reactor Service Water System P&ID (Sheets 1-3) ................................................21-728 Figure 9.3-1 Standby Liquid Control System P&ID ...................................................................21-731 Figure 9.3-1a Standby Liquid Control System PFD......................................................................21-732 Figure 9.3-6 Instrument Air System P&ID (Sheets 1-2).............................................................21-733 Figure 9.3-7 Station Service Air System P&ID (Sheets 1-2)......................................................21-735 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheets 1-5) ............................................21-737 Figure 9.4-2a Turbine Building Ventilation System Air Flow Diagram.......................................21-742 Figure 9.4-2b Turbine Building Ventilation System Control Diagram (Sheets 1-2) ....................21-743 Figure 9.4-3 Secondary Containment HVAC System (Sheets 1-3) ............................................21-745 Figure 9.4-4 R/B Safety-Related Electrical Equipment HVAC System (Sheets 1-3) ................21-748 Figure 9.4-5 Reactor Internal Pump Control Panel Room HVAC System..................................21-751 Figure 9.4-8 Drywell Cooling System P&ID ..............................................................................21-752 Figure 9.4-10 Radwaste Building HVAC (Sheets 1-3).................................................................21-753 Chapter 21 Figure TOC Volume 7-i

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 List of Figures (Continued)

Figure 9.5-1 Suppression Pool Cleanup System P&ID ...............................................................21-756 Figure 9.5-6 Standby Diesel Generator Fuel Oil and Combustion Air Intake and Exhaust Systems......................................................................................................21-757 Figure 9.5-7 Standby Diesel Generator Jacket Cooling Water System .......................................21-758 Figure 9.5-8 Standby Diesel Generator Starting Air System.......................................................21-759 Figure 9.5-9 Standby Diesel Generator Lubricating Oil System .................................................21-760 Figure 9A.4-1 Reactor Building Fire Protection at Elevation -8200 mm.......................................21-761 Figure 9A.4-2 Reactor Building Fire Protection at Elevation -1700 mm.......................................21-762 Figure 9A.4-3 Reactor Building Fire Protection at Elevation 4800/8500 mm ...............................21-763 Figure 9A.4-4 Reactor Building Fire Protection at Elevation 12300 mm ......................................21-764 Figure 9A.4-5 Reactor Building Fire Protection at Elevation 18100 mm ......................................21-765 Figure 9A.4-6 Reactor Building Fire Protection at Elevation 23500 mm ......................................21-766 Figure 9A.4-7 Reactor Building Fire Protection at Elevation 27200 mm ......................................21-767 Figure 9A.4-8 Reactor Building Fire Protection at Elevation 31700/38200 mm ...........................21-768 Figure 9A.4-9 Reactor Building Fire Protection, Section A-A ......................................................21-769 Figure 9A.4-10 Reactor Building Fire Protection, Section B-B.......................................................21-770 Figure 9A.4-11 Control Building Fire Protection, Section B-B .......................................................21-771 Figure 9A.4-12 Control Building Fire Protection at Elevation -8200 mm .......................................21-772 Figure 9A.4-13 Control Building Fire Protection at Elevation -2150 mm .......................................21-773 Figure 9A.4-14 Control Building Fire Protection at Elevation 3500 mm ........................................21-774 Figure 9A.4-15 Control Building Fire Protection at Elevation 7900 mm ........................................21-775 Volume 7-ii Chapter 21 Figure TOC

ABWR 21-696 127(6

&7*)(('(56)(('(56%(7:((10&%86(6$%$1'&720&

%86(6()*5(63(&7,9(/<$1'7+(5(6(59($8;,/,$5<75$16)250(5

/(*(1' )(('(56720&%86(6()$1'*$5(&$%/(

&/$66,( ,(

81,7$8;,/,$5<$1'5(6(59($8;,/,$5<75$16)250(5)(('(5672 3/$17,19(670(173527(&7,21 3,3 0&%86(6$%&$5(1216(*5(*$7('3+$6(%86'8&7

6:,7&+

32:(5*(1(5$7,21 3* <$5' =21(6(/(&7,9(,17(5/2&.,63529,'('%(7:((1,62/$7,21 68332576(59,&(6 66

%5($.(5$1',7 683675($0&/$66,()(('%5($.(5

0$,132:(5 7:22)7+5((%5($.(565$&.('287 75$16)250(5

)2523(5$7,216(($68%6(&7,21

1250$/35()(55(')((' 09$

$/7(51$7(35()(55(')((' ,167$//(' )(('(5&,5&8,7%5($.(56)5207+(81,7$8;,/,$5<$1' 63$5( 5(6(59($8;,/,$5<75$16)250(56727+(0(',8092/7$*(

&20%867,21785%,1(*(1(5$725)(('

  • (1(5$725  N9 6:,7&+*($5$5(,17(5/2&.('7235(9(173$5$//(/,1* 5(6(59($8;,/,$5<

09$ 0$,1 ,3%N$ 7+(1250$/$1'$/7(51$7(32:(56285&(6 75$16)250(5

N9 *(1 ,3%N$

3)  09$09$ 55$$

,3%N$ ,3%N$ $)$&

/,1. /,1.

,3%N$

/,1.

81,7$8;,/,$5< 58$$ 81,7$8;,/,$5< 58$% 81,7$8;,/,$5< 58$&

75$16)250(5$ 09$09$ 75$16)250(5% 09$09$ 75$16)250(5& 09$09$

$)$& $)$& $)$&

0(',80 0(',80 0(',80 0(',80 0(',80 0(',80 92/7$*( 92/7$*( 92/7$*( 92/7$*( 92/7$*( 92/7$*(

6:,7&+*($5 6:,7&+*($5 6:,7&+*($5 6:,7&+*($5 6:,7&+*($5 6:,7&+*($5

N9 N9 N9 N9 N9 N9 3* 0&& 3*

3* 0&$ 0&$ 3* 0&$ 3,3 0&$ 3* 0&% 0&% 3* 0&% 3,3 0&% 0&& 0&& 3,3 0&&

0 0

$6' $6' $6' 1&&&,5&8/$7,1*:$7(53803&

63$5( 63$5( 63$5( 63$5( 63$5(

53&(1$/292/76:*5

&&%&5'3803% 3&&76:3803&

1&%&70$.(833803%

3&&7&:3803&

1&%+($7(5'5$,13803% 1&%&7%/2:'2:13803%

1&0(&+9$&8803803 1&'&21'(16$7(3803'

1&&&70$.(833803&

3&6$/292/76:*5 3&$/292/76:*5 1&&&7%/2:'2:13803&

1&&&21'(16$7(3803&

53&6%/292/76:*5 53&%/292/76:*5 53&6&/292/76:*5 8&),5(3527(&7,213803 53&&/292/76:*5 63$5(

1&$&,5&8/$7,1*:$7(53803$ 1&%&,5&8/$7,1*:$7(53803%

1&$+($7(5'5$,13803$

1&$&70$.(833803$

1&$&7%/2:'2:13803$

3&%7&:3803% 3&%76:3803%

3'(+1&:5()5,*(5$725( 3'%+1&:5()5,*(5$725% 3''+1&:5()5,*(5$725' 3'&+1&:5()5,*(5$725&

&&$&5'3803$ 3&$7&:3803$ 3&$76:3803$

3'$+1&:5()5,*(5$725$

63$5( 63$5(

1&$&21'(16$7(3803$ 1&%&21'(16$7(3803%

1&$ 1&% 1&& 7<3,&$/)253&

5,3,19(57(5 5,3,19(57(5 5,3,19(57(5 5,3,19(57(5 (1% & 63$5(

25A5675BH Revision 7 5,3,19(57(5 5,3,19(57(5 5,3,19(57(5 $ ) ' - 5,3,19(57(5 5,3,19(57(5 5,3,19(57(5

%&$  %&)  %&'  %&-

% ( + & * .

%&%  %&(  %&+ 0&'  %&&  %&*  %&.

0:

&7*

0(',8092/7$*(

6:,7&+*($5

N90&( 0(',8092/7$*(

',9, 6:,7&+*($5 127( 127( 0(',8092/7$*( 127( 0(',8092/7$*( N90&+

127( 6:,7&+*($5 6:,7&+*($5

N90&) N90&*

',9,, ',9,,,

Design Control Document/Tier 2 53&(1$

53&( 53&( 53&) 53&)

53&*

63$5( 63$5( 63$5(

',(6(/*(1(5$725 ',(6(/*(1(5$725 ',(6(/*(1(5$725

(&%+3&)3803%

(&$5+53803 3&$5&:3803 3&'5&:3803 (&%5+53803 3&%5&:3803 3&(5&:3803 (&&5+53803 3&&5&:3803 3&)5&:3803

(&%+3&)3803&

/292/76:*5 /292/76:*5 7<3,&$/)253&

/292/76:*5 /292/76:*5 /292/76:*5 /292/76:*5 53&&

09$3) 09$3) 09$3)

(1% & /292/76:*5

N932:(5',675,%87,21 Figure 8.3-1 Electrical Power Distribution System SLD (Sheet 1 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-1 Electrical Power Distribution System SLD (Sheet 2 of 3)21-697

ABWR 21-698 EXTERNAL 25A5675BH Revision 7 EXTERNAL EXTERNAL Design Control Document/Tier 2 Figure 8.3-1 Electrical Power Distribution System SLD (Sheet 3 of 3)

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 8.3-2 Instrument and Control Power Supply System SLD 21-699

ABWR 21-700 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-3 Plant Vital AC Power Supply System SLD (Sheet 1 of 2)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-3 Plant Vital AC Power Supply System SLD (Sheet 2 of 2)21-701

ABWR 21-702 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-4 Plant DC Power Supply System SLD (Sheet 1 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-4 Plant DC Power Supply System SLD (Sheet 2 of 3)21-703

ABWR 21-704 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 8.3-4 Plant DC Power Supply System SLD (Sheet 3 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.1-1 Fuel Pool Cooling and Cleanup System P&ID (Sheet 1 of 3)21-705

ABWR 21-706 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.1-1 Fuel Pool Cooling and Cleanup System P&ID (Sheet 2 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.1-1 Fuel Pool Cooling and Cleanup System P&ID (Sheet 3 of 3)21-707

ABWR 21-708 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.1-2 Fuel Pool Cooling and Cleanup System PFD (Sheet 1 of 2)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.1-2 Fuel Pool Cooling and Cleanup System PFD (Sheet 2 of 2)21-709

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.1-12 Plant Refueling and Servicing Sequence 21-710

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 1 of 9)21-711

ABWR 21-712 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 2 of 9)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 3 of 9)21-713

ABWR 21-714 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 4 of 9)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 5 of 9)21-715

ABWR 21-716 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 6 of 9)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 7 of 9)21-717

ABWR 21-718 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 8 of 9)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-1 Reactor Building Cooling Water System P&ID (Sheet 9 of 9)21-719

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.2-2 HVAC Normal Cooling Water System P&ID 21-720

ABWR

+(&:$,6'(6,*1('72%(&5266&211(&7('726833257

0&5$5($+9$&&0$18$/02'(23(5$7,2181'(5

32678/$7('$,5&5$)7,03$&76&(1$5,26

25A5675BH Revision 7 72+(&: & )520+(&: &

6+ 6+

Design Control Document/Tier 2 Figure 9.2-3 HVAC Emergency Cooling Water System P&ID (Sheet 1 of 3)21-721

ABWR 21-722 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-3 HVAC Emergency Cooling Water System P&ID (Sheet 2 of 3)

ABWR 72+(&: $ )520+(&: $

6+ 6+

25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-3 HVAC Emergency Cooling Water System P&ID (Sheet 3 of 3)21-723

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.2-4 Makeup Water System (Condensate) P&ID 21-724

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-5 Makeup Water System (Purified) P&ID (Sheet 1 of 3)21-725

ABWR 21-726 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-5 Makeup Water System (Purified) P&ID (Sheet 2 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-5 Makeup Water System (Purified) P&ID (Sheet 3 of 3)21-727

ABWR 21-728 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-7 Reactor Service Water System P&ID (Sheet 1 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-7 Reactor Service Water System P&ID (Sheet 2 of 3)21-729

ABWR 21-730 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.2-7 Reactor Service Water System P&ID (Sheet 3 of 3)

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-1 Standby Liquid Control System P&ID 21-731

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-1a Standby Liquid Control System PFD 21-732

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-6 Instrument Air System P&ID (Sheet 1 of 2)21-733

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-6 Instrument Air System P&ID (Sheet 2 of 2)21-734

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-7 Station Service Air System P&ID (Sheet 1 of 2)21-735

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.3-7 Station Service Air System P&ID (Sheet 2 of 2)21-736

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheet 1 of 5)21-737

ABWR 21-738 25A5675BH Revision 7

0&5$5($+9$&&,6'(6,*1('72%(32:(5(')520

',9,6,21,81'(50$18$/02'(23(5$7,21)25

32678/$7('$,5&5$)7,03$&76&(1$5,26



0&5$5($+9$&&,6'(6,*1('7223(5$7(,1$

0$18$/02'(6833/,(')520+(&: $ 81'(5

32678/$7('$,5&5$)7,03$&76&(1$5,26

Design Control Document/Tier 2 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheet 2 of 5)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheet 3 of 5)21-739

ABWR 21-740 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheet 4 of 5)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-1 Control Building HVAC Flow Diagram (Sheet 5 of 5)21-741

ABWR 21-742 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-2a Turbine Building Ventilation System Air Flow Diagram

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-2b Turbine Building Ventilation System Control Diagram (Sheet 1 of 2)21-743

ABWR 21-744 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-2b Turbine Building Ventilation System Control Diagram (Sheet 2 of 2)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-3 Secondary Containment HVAC System (Sheet 1 of 3)21-745

ABWR 21-746 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-3 Secondary Containment HVAC System (Sheet 2 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-3 Secondary Containment HVAC System (Sheet 3 of 3)21-747

ABWR 21-748 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-4 R/B Safety-Related Electrical Equipment HVAC System (Sheet 1 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-4 R/B Safety-Related Electrical Equipment HVAC System (Sheet 2 of 3)21-749

ABWR 21-750 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-4 R/B Safety-Related Electrical Equipment HVAC System (Sheet 3 of 3)

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.4-5 Reactor Internal Pump Control Panel Room HVAC System 21-751

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.4-8 Drywell Cooling System P&ID 21-752

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.4-10 Radwaste Building HVAC (Sheet 1 of 3)21-753

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.4-10 Radwaste Building HVAC (Sheet 2 of 3)21-754

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.4-10 Radwaste Building HVAC (Sheet 3 of 3)21-755

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.5-1 Suppression Pool Cleanup System P&ID 21-756

ABWR 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.5-6 Standby Diesel Generator Fuel Oil and Combustion Air Intake and Exhaust Systems21-757

ABWR 21-758 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.5-7 Standby Diesel Generator Jacket Cooling Water System

25A5675BH Revision 7 ABWR Design Control Document/Tier 2 Figure 9.5-8 Standby Diesel Generator Starting Air System 21-759

ABWR 21-760 25A5675BH Revision 7 Design Control Document/Tier 2 Figure 9.5-9 Standby Diesel Generator Lubricating Oil System

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-1 Reactor Building Fire Protection at Elevation -8200 mm 21-761

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-2 Reactor Building Fire Protection at Elevation -1700 mm 21-762

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-3 Reactor Building Fire Protection at Elevation 4800/8500 mm 21-763

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-4 Reactor Building Fire Protection at Elevation 12300 mm 21-764

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-5 Reactor Building Fire Protection at Elevation 18100 mm 21-765

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-6 Reactor Building Fire Protection at Elevation 23500 mm 21-766

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-7 Reactor Building Fire Protection at Elevation 27200 mm 21-767

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-8 Reactor Building Fire Protection at Elevation 31700/38200 mm 21-768

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-9 Reactor Building Fire Protection, Section A-A 21-769

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-10 Reactor Building Fire Protection, Section B-B 21-770

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-11 Control Building Fire Protection, Section B-B 21-771

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-12 Control Building Fire Protection at Elevation -8200 mm 21-772

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-13 Control Building Fire Protection at Elevation -2150 mm 21-773

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-14 Control Building Fire Protection at Elevation 3500 mm 21-774

25A5675BH Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-15 Control Building Fire Protection at Elevation 7900 mm 21-775