Monthly Operating Repts for Dec 1989 for Sequoyah Nuclear Plant Units 1 & 2
ML20006F738
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/31/1989
From: Sims R
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20006F730 List:
References
NUDOCS 9003010079
Download: ML20006F738 (10)


Text

p@ln'r p.. 1;.l c a: '

i, ;?,.;

n: '

4 tg.

k.i ff3 's h ( 4

{:N ?[_I{

{,

5 l

fi itM:-

$OW... A b ;)j;p', '

~,

-H. l

./3 -

r. ;,

+

o

  1. ,7

- ?[:~i J.-

. g;;

E i

5 3 !- '

,,7

"*l,

  • ~ -,

i N

+

t 2

a..

n-l f.

dj

,%. ki; e

s

t.i
ENCLOSURE'2-G w.

Jb J., :Q ? " -

y m,

.m.

TENNESSEE VALLEY: AUTHORITY.

NUCLEAR POWER GROUP.

em p

SEQUOYAH-NUCLEAR PLA.NT m a.:

.; m

.g \\

z <

F. ; i

.), L..

,}

t

I. y t.

4

,W v:

MONTHLY-OPERATING REPORT ~

~

s 4

p.

TO THE:

" E' 1

'o

't L

NUCLEAR. REGULATORY COMMISSION' x,

b: m '

DECEMBER 1989 s, c y

y

'\\;V i N (

(l, k

UNIT 1 v

.H

-DOCKET NUMBER 50-327 c, -

4 f.' N '

F4

-LICENSE NUMBER OPR-77:

w

.[-- ;.

G.:

4 w

1 I*.'t ift u

']

..UNIl ' 2 g.c,,,

m DOCKET NUMBER:50-328-f si p,

LICENSE NUMBER DPR-79

+

rp a v.i I

k l

g-,

'7 r

tw

' -( ";

-1.

4 i

t 1

4 Y!

x 4

\\

h'k'

'I'.,

?.'

j mv ;tta NN'$3' A i

[,I J

4 i'iR v a

7

w-F

,m.-

OPERATIONAL

SUMMARY

DECEMBER 198.9 UNIT 1 i

~

Unit l' generated 700,500 MWh (gross) of electrical power during December with i

7 a capacity factor of 79.59 percent'. A reduction in reactor power level was initiated on December 1, 1989, at 2100 (EST), for the performance of the ice

)

condenser! lower inlet door test and system walkdowns.

Reactor-power increase to 100 percent was delayed when problems occurred with HDT 3 Valves 6-106 A and B.

Unit l reached 100 percent power level again on December 7, 1989, On~ December 10, 1989, with Unit 1 in Mode 1 (100 percent power), a turbine i'

trip / reactor trip occurred at 1047 (EST). The trip resulted from a high-high-feedwater level of 75 percent in S/G 3.

The trip was preceded by a secondary L'

side transient, which resulted in a turbine runback to approximately 80 percent load.

r' Unit I was tied online on December 12, 1989, at 2257 (EST).

The unit again i,

reached 100 percent reactor power level on December 15, 1989, at 0600 (EST).

h_

On December 21, 1989, at 0842 (EST), the power level was decreased to approximately 80 percent for ten hours for CBP C maintenance and reached 100 percent; reactor power at 1805 (EST), that same day.

Unit 1 operated at 100 percent power.from December 21, 1989, at 1805 (EST),

until December 29, 1989, at 1706 (EST), when the power level was decreased to extend the life of the core with reduced load demands expected on the grid.

Unit I was' operating at approximately 75 percent reactor power at the end of December.

p

].

L' c.

,4 9

OPERATIONAL

SUMMARY

DECEMBER 1989 UNIT 2 Unit 2 go;erated 818,580 MWh (gross) of electrical power during December with a capacity factor of 94 percent.

The unit continued to operate at 100 percent power 1evel until December 15, 1989, when at 1049 (EST), the shift operations supervisor. notified the unit operator to decrease the load'to,90 percent until the source of the problem with.HDT 3 level was determined.

Reactor power reached 100 percent.again on December 18, 1989, at 0335 (EST),-but was again i

reduced because of erratic flow on Heater 3 drain system.

On December 20, 1989, with the reactor power level at 55 percent,.the unit

. operator began easing up the load to help meet load demands on the grid.

L HDT 3 functioned normally, and 100 percent reactor power was reached on

[,

December 21, 1989, at 1634 (EST).

e-

.l Unit 2 continued to operate at 100 percent _ power level untti December 29,'1989, at 2232 (EST),:when the power level was decreased to extend the life of the t

core with reduced load demands expected on the grid. Unit 2 was operating at i

approximately 75 percent reactor power at the end of December.

h f

. POWER-OPERATED RELIEF VALVES (PORVs) AND SAFETY VALVES

SUMMARY

L There were no challenges.to PORVs or safety valves in the month of December.

E OffSITE DOSE CALCULATION MANUAL (ODCM) CUANGES

-There were no changes to the ODCM in the month of December.

0

=

t Y

l- -

a m

fh [!! ; d.;

e:

s..

- sm.

1:

i

' 4.19 '

s

((A ; lC s

tr 27 ;

. AVERAGE DAILY. UNIT POWER LEVEL DOCKET NO.

50-327 s.

UNIT One DATE

_01-04 4 COMPLETED BY

'R G.iSims t.b l. /

' TELEPHONE (615)'843-6722 MONTH DLCEMBER1989 DAY ~

AVERAGE DAILY' POWER LEVEL' DAY AVERAGE-DAILY-P0HER LEVEL v

.y

- (MWe-Ne t ) '

(MWe-Net, 1

1143 17 1139

2.

-697 18 1130

3.

511-19 1143 4

615 20 1143 4

5-792 21 1099 6

'733 22 1141

'7

-1064 23 1144 8-1120 24 1144 9.

1145 25 1131 g

'10 516 26 1146' y

11 14 27 1146 h'

12-11-28 1147

.i'.'

'l*'

f_,.Sm 13l 312 29 1096 k'

--A

14 ',

711 30 815 V;

s' ;

4

" 15' 1140 31 847

./

16-1141 ni..

~

f.

j.:

Ei' n

[b ca y i'

' ~ ~

.w

VM{e*??Ylg%.

l

+i

  • M

?

'~

-m ~y 8

3; p

t', s;.=. g. A, -..

g o.-

x,

/;,hlfs $ $[ * *

,s

!,lA t

  1. $. b cl;c.h,,,. j' i

N h M".

t i

AVERAGE DAILY-UNIT.. POWER LEVEL-rp cdy.

y; g;y:..

,r-z:

e<

e

+

rj

. w

+

7 g,,' Mw.

+

l,D.

.L:s A NO.1 50-328'

', /m :i c.., -, <

m a

9,$,

Unit'

.Two "

?!

q 1

4 s,.

d..

,[f,

, '01-04 -

DATE 9-4 W,flu >

COMPLETED BY

.R.<G.:SimsL j

e mjm

' b

- w t

n-,

9;:

j 7

-TELEPHONE' (615) 843-6722 l

%p,

s

-t

.t,,

i m:3

.kW ' - m

--1 DECEMBER 1989;

- we EHONTH:

'u r

[S: i 4

t OM

l O'^

( DAY.;

4 AVERAGE DAILY! POWER LEVEL DAYu

. AVERAGE DAILY-POWER LEVEL

,cr

(MWo-Ne t)'

(MWe-Net) '

H

, 1 11133-17 917-

,t i

J24 1132 18-1115 m l w

[, ' J

~ 13.

11134 19, 768-4 m

  • ]

- 4 :'

-1133r 20 641

~'

M, e_5:

1135 21 939 1

9 e

s V-

~

j6:

1133' 22 1130-n b'

f71

1129 23 1130 4

.:g a n

-8 '

1132 12 4 1133-f' _' j I2F 1

@g 29 91134-25-1132' 2

,f 10 -

1132 26-

~1132' g

f'

' 11s 1133

-27 1132-at

.r

12D 1132 28 1133 1

-13L

/1133-29-1127 m

s' o,

14 1134-30 867 J

V 21 5.:1 1032

'31 841 4

C16 '

913 u,.

l i

i f

N' j

I

.y

(#

1,

4

,,5$

w y ' - -,

m, r

i

.t m. ut e,.; w. < h.} <.

u gj

?

g - fa mI.

OPERATING DA1A RLPORT

-(

[

DOCKET NO. _50-327 DATE January 5. 1990 g

COMPLETED BY T. J. Hollomon TELEPHONE (615) 843-7528

- OPERATING STATUS

! Notes

. 1.

Unit Name:

Sequoyah Unit One

{

2.

Reporting Period:

Deccaber 1989 3.

Licensed Thermal Power (tut): 3411.0

4. : Nameplate Rating (Gross.the)* 1220.6 5.

Design Electrical Rating (Net MWe): 1148.0 1

1

- 6.-

Maxima Dependable Capacity (Gross PWe): 1183.0 I

t 7.fMaximumDependable' Capacity (NetfWe): _1148.0 8.

If Changes occur in capacity Ratings (Items Hunber 3 Through 7) Since Last Report, Give Reasons:

N/A 1

.9.

Power Level To Which Restricted, if Any (Net PWe):

N/A

'l0. Reasons For Restrictions, if Any:

N/A b

This Month Yr-to-Date Cumulative

.11. Hours in Reporting Period 744 8.760 74.545

12. Nunber of. Hours Reactor Was Critical 704 8.671 33.4 %

13.~ Reactor Reserve Shutdown Hours 0

0 0

)

14. Hours Generator On-Line 683,9 8.625,6 32.689.4 l
15. Unit Reserve Shutdown Hours 0

0-0

16. Gross Thermal Energy Generated (MI) 2.012.209 28.758.942 106.335.879
17. Gross Electrical Energy Generated (MI) 700.500 9.888.480 36.0?).756
18. Net Electrical Energy Generated (MI) 675.097 9.550.601 34.472.029
19. Unit Service Factor 91.9 98.5 43.9

'20. Unit' Availability Factor 91.9 98.5 43.9

21. Unit Capacity Factor (Using MDC Net) 79.0-95.0 40.3 22.' Unit capacity Factor (Using DER Net) 79.0 95.0 40.3
23. Unit Forced Outage Rate.

8.1 1.5 49.4

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Unit 1 Cycle 4 refuel outaae in March 1990 with a duration of 70 days.

I

25. If Shut' Down At End Of Report Period, Estimated Date of Startup:

N/A m

p-OPERAllNG DATA REPOR1 DOCKET NO..50-328 DATE January 5. 1990 COMPLETED BY T. J. Hollomon TELEPHONE (615) 843-7528 OPERA 11NG STATUS

! Notes l-1.

Unit Name:

Seguoyah Unit Two 2.

Reporting Period:

December 1989 1

1 3.

Licensed thertnal Power (Mt): 3411.0 4.

Nameplate Rating (Gross We): 1220.6 5.

Design Electrical Rating (Net Me): 1148.0 1

6.

Maximum Dependable Capacity (Grnss We): 1183.0 1

1 7.

Maxinun Dependable capacity (Net We): 1148.0 1

i 8.

If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To blhich Restricted, If Any (Net We):

N/A

10. Reasons for Restrictions, if Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 8.760 66.505
12. Number of flours Reactor bias Critical 744 6.344 33.530
13. Reactor Reserve Shutdown llours 0

0 0

14.. Hours Generator On-Line 744.0 6.104.5 32.695.8 i

15. Unit Reserve Shutdown llours 0

0 0

16. Gross Therinal Energy Generated (MI) 2.390.942 18.686,161 100.410.259 l'
17. Gross Electrical Energy Generated (MI) 818.580 6.332.076 34.020.796
18. Het Electrical Energy Generated (MI) 786.980 6.057.238 32.448.334
19. Unit Service Factor 100,0 69.7 49.2
20. Unit Availability Factor 100.0 69.7 49.2
21. Unit Capacity Factor (Using MDC Net) 92.1 60.2 42.5
22. Unit Capacity Factor (Using DER Net) 92.1 60.2 42.5 I
23. Unit Forced Outage Rate 0.0 6.3 45.0
24. Shutdowns-Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

An Ice condenser outaoe is scheduled in March 1990, with duration of 9 days.

~

25. If Shut Down At End Of Report Period, Estinated Date of Startup:

N/A

g--

,.g_

a

~y

.m, mg g_,

3

...a

.,.; m.

'.,p..

_r-*...."3_--.

t c

w g,,,.g,_.

pf 4, ;

,v4

,r.

~1H.

.. ' ':m^ !. O ' P-. 4

+%'.

t*-

~

~~MJ

~

3r.,

',, ".. 1-c 7 -.N

.m 3-

^

y,' ~g;e r,

y

~

~ -

': e.

4.-

. 4

/

.. m DOCKET NO:

'50-327' D,,.1f%g

~

~

2 UNIT SHUTDOWNS AND POWER REDUCTIONS-LMIT NAME:

-One' e

i

u

=DATE:' '01/08/90-

~

R --

V _

REPORT MONTH: December 1989~7 1 COMPLETED BY:7. J. Ho11 ament

~

if' s

- "^

sTELEPHONE:M151 843-7528.

u t'

!1.

~* Method of 3! Licensee v!

Cause and CorrectiveL.t.

! Duration !

! Shutting'Down- ! Event i! System-

!' Component !...,xAction to

~!!

! Reactor

~ li. Report'No.

,-Code *

! Codet E!.d 1 Prevent Recurrence

'!. No.

Date

-! Type?. ! (Hours);i!." Reason'-

- /

1 g.

' i-6.

5 891201 i S-

. i'

~

i B.

i-15-

't J

.c

' Power redoction.to 50% M!

3..

~.

1. -

.'! for ice condenser lower-!~

e

! inlet door test and -

~

i i

! system walkdowns:initi- !.'

~

T-i i

i

'!s

! ated at 2100 (EST).'

~-

i c! Unit' reached'100% power:!'

j-

]

j j.

! again on 12/7/89 at-e-

-!.1548_(EST).

' '^

I:

7

! 991210' !

F 60.2 A

3

! 1-89035x

!.At:1047 (EST) on;

! 12/10/89. a turbiner 1-

~

L e

1 trip / reactor trip -

~

j j

j

i

~! occurred because of a;~!

'O i

'! high-high feedwater' j

j e

'!. level of'75% in S/G 3.

~

a

! Trip was' preceded by a" !

j

! secondary side transient!

j g

!l

! that resulted in a tur- !'

e

! bine runback to approx. !'

e

!! 80% load. ' Unit tied.

j j'

s

! on1ine 12/12/89 at t

e

- 1'

! 2257-(EST)'and reached.. !.

. ! 100% power at 0600 (EST)!.

j j

j j

e s

'I'on 12/15/89.

' 1:

'F: Forced Reason:

Method:

  • Exhibit G-Instructions -

l S: Schehled A-Equipment Failure (Explain) 1-Manual

. for Preparation of Data -

B-Maintenance or Test-Manual! Scram Entry sheets for Licensee ;

3-Automatic. Scram.

Event Report (LER) File l

C-Refueling

. Continuation of Existing Outage (NUREG-061)

D-Regulatory Restruction' E-Operator Training and License Examination -

'5-Reduction G-Operational Error (Explain).

9-Other F-Administrative

  • Exhibit I-SameISource -

H-Other (Explain) l l

~

I

...,,... ; w a % c_.,._..,..,

,..y

_,,u.

,g

,g,

g... "

,,. - ~.

pu

-- _---- y -

..a

., a,...

L - -.o.

~

m so m

,p, -

.,g,

,-wgg g n.n

,g>

=..

g; -

..s7 c-~

?g..

m -

e

'~

p,, : 3g - 7,

-v r

w-w..,

r :g.:+,

_ A

. DOCKET NO!

50-327-

- 3 %,. -_

~

,v.

~J UNIT' SHUTDOWNS AND POWER REDUCTIONS'

' UNIT NAME:

une ben

. 0.

us M

~

'DATE:

01/08/90 REPORT MONTH:' December 1989 *

" COMPLETED BY:T. 1. Hollamoni

_ nN

~'

iTELEPHONE:(6151 843-7528 a

11 Cartse and Corrective;.!'

~

! Method of

! Licensee
! Component !~

Action to L-

. 1;

+

1._r-1

! Duration !..

.! Shutting ~Down..! Event'

'! Systes

.j'

! No.-

!~

Date'

! Type'

! (Hours)' !~-Reason

! Reactor f

! Report No.

!' Code *

'! Code

Prevent' Recurrence--

_ e 2

y

-!s

'l

'8 891221 ~!

F.

B' 5

! Power reduction to 80%. I

^

2!

~

!~

! initiated at 0842 (EST) :

. v:; ~

?!.for maintenance on CBP.C1.

~

'! because of oil' leak.':

1-1-

!r

!' Power reached ' 100% at - 1;

.!'1805.(EST) that same 1-

!. day. - '

g 3

.!=

-S 1.

,~~!-

f 9

! 891229 !

.S

!?

F-5

!^

!-Initiated power reduc- !

'! tion'at 1805 (EST) to

~ --

-! extend the 1ife of the: !1

,7

.d

!. core. Unit operating. n!

^

I'

! at 75% at end of month.:.!?

1-

!~

-V 1

,s 1

'l 2,

1

't T: Forced Reason:

Method:

  • Exhibit G-Instructions..

S: Scheduled A-Equipment Failure (Explain).

.1-Manual for Preparation of Data "

~

B-Maintenance or Test 2-Manual Scram' LEntry sheets for Licensee C-Refueling 3-Automatic' Scram'. -

Event Report (LER) File u

D-Regulatory Restruction,

~5-Reduction (NUREG-061).

4-Continuation of Existing Outage E-Operator Training and. License Examination F-Administrati.ve 9-Other

~

G-Operational Error (Explain)

Exhibit I-Same Source

-r H-Other (Explain) i, e

y e.

"Wy (a

kl.

..,. :~

w:.

M--.2

~

^

E

l ~

h:

,. ~,., -.

-- ~ R" ' ' L ~MC.L-:, ~z:.. ' - ' ' %* -

'T*

s%

vc :2mim emm nymy: y "vmm=-::

.-m mmyr r

+

. - m:

we cw%.

22n:tL J M,. ' h.h.. ? '-
    • ' +

_ 1

"_ ;,_

  • W...

^ '

' ~. ' ' _,

4 f

'~

m g.q g w

ym

..g m;.

a

.. e w

.n x, :,.

3x

=

n :.: ;

.- ; x.: q,m,:;. g

.-g

+

Y 3

t 43 Tj ('[

4

,,r

~

DOCKET NO:

50-329 '

' ' ~ sT

-;6v

~

. w.,; "

w...

~

~ UNITLSuuTDOWNS'AND POWER REDUCTIONSj

~ tNIT.NAME:

Two-

-DATE:

01/08/90 j $ J' G

c' O.?

e_y

'_' ' ; REPCRF. MONTH: December 1989 ~._

1 COMPLETED SY:L J Ho11 aeon.

^

~(TELEPHONE:f61 Sis 43-7528

'i 1_

~1: Method'of s! Licensee 1-

.. - 11 Cause and Corrective ![

- !-No.

. ! Date

'!Tyoe'

' ! (Hours) ". !' Reason' - !. Reactor

! Report No. ~1-Code *;

'! Code' Prevent Recurrence- ;!

'3..

! Duration !..

. ! Shutting Down, ! Event

-! System

! Component;! L

--Action'to 8-rQ_

>f

?

L!.

~

57 i!_

! Reduction of. power at ;.!1

! 16

! 891215.!

F B'

p 1.

-I 1049 (EST) to investi- <!:

3 1

-i

-!l

11. gate problem with HDT 3 !L

~ -

1-level and perform main- !;

J.

-g J!

,1~tenance. Unit again ati!

'I

~. !..

!?

!;1001 power at 0335 (EST)!

e i

i

!~

1;

' ti on;12/18/89. but power-'!

j j

j j

j j

'1 1! was again reduced'.

?!'

i e

e a

1 *.

~!1because of erratic flow.~!'

2-

- i Power level increased to!.

i i-i j

j i

(!1.100% on 12/21/89 to help!-

3 11

! meet load demands.

HDT.!..

17'

891229 !

5 T

5

.1 3 functioned normally. !

!?

9

! Initiated power reduc-1 !

-a-

. ! tion at 2232 (EST) to 1

a j

j j

j ~

~;

e

! extend the life of the 11 j'

i 1 core. ' Unit; operating at!L 3

! 75% at end of month.

J!.

s j

i j

j i

~ j

~!"

~!

~

'F: ron $d Reason:

. Method:

  • Exhibit G-Instructions':

~

8 S: Scheculed A-Equipment Failure:(Explain) 1-Manual ~

for PreparatioW of Data B-Maintenance or Test..

~ Manual Scram '

' Entry sheets for Licensee.

C-Refueling 3-Automati c' Scram.

Event Report:(LER) File.,

D-Regulatory Restruction

'5-RefJction-

. (NUREG-061)'

~4-Continuation..of Existing Outage E-Operator. Training and License Examination F-Amini strative 9-Other G-Operationa! Error (Explain)

? Exhibit I-Same Source'.

H-Other (Explain)