ML20006F573

From kanterella
Jump to navigation Jump to search
Annual Rept of Safety Valve & Relief Valve Failures & Challenges
ML20006F573
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/31/1989
From:
NORTHERN STATES POWER CO.
To:
Shared Package
ML20006F570 List:
References
NUDOCS 9002280181
Download: ML20006F573 (1)


Text

^

i j

q yq: ' w,,

RR m.

D$ $ <

M tc p

l

.,... p

4. t p g, 4^ '

4 -

kV

-ATTACHMENT 2-R9

-- o

.. 3 M

@{

i MONTICELLO NUCLEAR GENERATING PLANT g

SAFETY / RELIEF VALVE FAILURES AND CHALLENGES-

.ke 1989' y

+1

-'d

[i!k

{

J

+

i This report is'made in accordance with NUREG-0737,.' Item II.K.3.3.and N

L Monticello' Technical Specification 6.7. A.6' and covers the periodLof January.1,.

j

.;e 1989.through December. 31 -.1989.

f' L

, Failures 1

I4/8/89-The' air operator and' top works associated with safety

~

relief valve RE 2 71G was' changed.out due?to excessive

' leakage of the-valve's pilot /second' stages.

4 Challences-10/25/89 During. performance of the Section XI ASME Boiler and Pressure Vessel Code reactor coolant system leakage test with'the-plant in' code shutdown,>DivisionLII Low'-

.L Low Set Logic was initiated resulting'in the-lifting-of(safety-relief valves RE 2 71G and RV 2-7111=

Reactor pressure decreased from 1008 psig to 52 psig,

'N s

The safety relief valve reset and reactor pressure N

returned to approximately'700 psig over,the next.few minutes., Reactor vessel temperature remained constant-at approximately 195 F throughout the' event.

Initiation of:the Low Low Set Logic was-caused by an-m finstrument' sensing line pressure. spike resulting from seating of an excess flow. check valve'.

The excess flow check valves were being leak tested as required by Technical' Specifications.

.i 4

c.,

_I l

i 1

h 9002280181 900216 PDR ADOCK 05000263