Forwards Insp Repts 50-277/89-82 & 50-278/89-82 on 891113- 17.Good Mgt Oversight & Involvement Noted in Restart Activities.Continued Mgt Attention Required Re Ongoing Effort to Reduce Number of Equipment Problems
ML20006F325
Person / Time
Site: Peach Bottom  
Issue date: 02/21/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20006F327 List:
References
NUDOCS 9002270396
Download: ML20006F325 (2)


See also: IR 05000277/1989082

Text

7

n.; c

.,

.

L ll

,r

)

-

i

FEg 211990

]

h.

<

,

,

-

l

!

Docket Nos.-- 50-277/DPR-44

50-278/DPR-56

i

' Philadelphia Electric Company

ATTN: Mr. C. A. McNeill, Jr.

,

Executive Vice President-Nuclear

1

Correspondence Control Desk

j

P. O. Box 7520

,

Philadelphia, Pennsylvania _ 19101

'l

Gentlemen:

Subject:

Combined Inspection 50-277/89-82; 50-278/89-82

,

This letter transmits the findings of a special team ir.spection by Mr. L.

l

Doerflein and other members of the NRC Region 1 Office and Headquarters on

November 13 through 17, 1989, at the Peach Bottom Atomic Power Station, Delta,

r'

'

Pennsylvania. The purpose of the inspection was to determine your readiness to

restart the Unit 3 Peach Bottom Atomic Power Station following an extended

t-

'

outage. . A summary of the findings was discussed with Mr. D. M. Smith'and other'

members of your staff at.the conclusion of the inspection.

,

'

Overall, 'the' team concluded 'that the plant personnel and equipmen.; were either

-

ready for restart or the necessary processes, tracking systems, and management

oversight were in place to ensure the remaining required items were resolved.

n

prior to restart. The team noted good management oversight a9d involvement in-

p

restart activities. One area- that needs continued managemen*. attention is _the

ongoing effort to reduce the number of equipment problems ir the control room.

e

'

No reply to this letter is required.

In accordance with 10 CFR 2.790(a), a

copy of this letter will be placed in the Public Document Room.

Your cooperation with us is appreciated.

L

Sincerely,

g

OR$1NAL SIGNED BY

(

A. Randolph Blough, Chief

)

Projects Branch No. 2

Division of Reactor Projects

Enclosure: NRC Region I Combined Inspection Report No. 50-277/89-82 and

50-278/89-82

0FFICIAL RECORD COPY

CIR PEACH BOTTOM 89-82 - 0001.0.0

02/21/90

. . .

9002270396 900221

'#q

[\\

DR

ADOCK 0500

7

3

, 40

,

l,-

s'*

.

,

Philadelphia Electric Company

2

FE8 211990

,

cc w/ enc 1:

D. R. Helwig, Vice President, Nuclear Services

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

,

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station

J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

Bryan W. .Gorman, Manager, External Af fairs

E. J. Cullen, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting,ttuclear Evaluations

G. A. Hunger, Director Licensing Section

Doris Poulsen, Secretary of Harford County Council

i

R. J. Lees, Chairman, Nuclear Review Board

Public Document Room (PDR)

s

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

,,

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

Mont Conner, SALP Reports Only

PA0 (2) SALP Reports and All Inspection Reports

R. Martin, NRR

J. Dyer, EDO

-

.

b

6'RI:DRP

7

?

N RI:DRP

,

Doerflein/rh1

Blough

2/ai/90

2/Y/90

0FFICIAL RECORD COPY

CIR PEACH BOTTOM 89-82 - 0002.0.0

02/20/90

'

.

.