Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
,
' B
?. '.:
, _ .' . .s e - . .
.i [
Y -Teiephone y m 3936000 Nuclear Group P O Box 4 -
. snippinoport. rA no7m Fi ruary 9, 1990
Deaver Valley Power Station -.;
Unit 1 - Docket No. 50-334, License No.- DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratirn Report ye 7
t f
'U. S. Nuclear Regulatory Ctatmission Document Control Desk Washington, D.C. 20555 ,
Gentlemen: ..
In - accortlance with Appendix A, Technical Specifications, the Monthly +
Operating ' Report is - submitted for Unit 1 and Unit-2 for the month of January, ->
1990.-
l~
s t
H Very truly yours, H
1;. u.
f), J. D. Sieber L
i Vice President ,,
J.; . Nuclear Group '
y f
u MAW /Im3 -
-Enclosures L-:
l1 4 j/' <
cc: .NRC Regional Office King of Prussia, PA 9002270309 900131 ,4 q >
. fi: l PDR ADOCM 05000334 '
x -
,R PNU w~,w n
-n~'
/) . \j e\. >
,, . - -, . -. . - . .- ~ . -
+
. Y y: . :
.v. ;
vc
-!OIMHLY OPERATING EILilDKE
. UNIT I JANUARY 1990 ,
s T January 1 'Ihe Unit entered the month of January 1990, operating at 50%
output in a power ra g up mode following the Unit's Seventh ;
Refuelirq Outage. At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the power ascension was halted when the Unit's output was 70% '
i January 2 'Ihe Unit operated at 70% output to permit oore flux mapping. '
January 3 At 0615 ' hours the Unit's output was raged up at 3% per ,
hour. At -1400 hours the power ascension was halted with
.. the Unit operating at 90% output to permit oore flux mappirg.
January 4 At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> the Unit's output was escalated to 95%.
January 5 'Ihe Unit operated at 95% output. s January 0 At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> the Unit's output was escalated to a naninal :s value of 100%.
'Ihe Unit operated at a nominal value of 100% output.
January 7 January 8 At 1004 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82022e-4 months <br /> the Unit's output was reduced to 68% to permit repairing a leak on the Instrument Tubing of the number 1 ,
seal D/P transmitter for the' 'A' Reactor Coolant Pug. At
- 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> the Unit's output was ramped up at 3%'per hour..
January 9 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the power ascension was halted when the Unit achieved-100% output.
- January 10 'Ihe Unit operated at a nominal value of 100% cutput.
. through January 18 January 19 At 1622 hours0.0188 days <br />0.451 hours <br />0.00268 weeks <br />6.17171e-4 months <br /> a plant shutdown was initiated. .At 1801 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.852805e-4 months <br /> the Unit was removed frun service to repair the inverter for the number 3 Vital Bus. At 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br /> the Unit entered Mode
- 3. At 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br /> the inverter for the number 3 Vital Bus was restored to- an operable condition. 'Ihe Unit remained-shutilown to repair sans leaking relief valves on the Normal Letdown Line and the Regenerative Heat Exchanger.
January 20 'Ihe Unit remained shutdown to repair same leaking relief ;
wives on the normal letdown line ard the regenerative heat exchanger.
January 21 At 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br /> the reactor was taken critical. At 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> the-~ Unit 'was synchronized and the Unit's output was ramped up to 30%. 'Ihe power ascenstion was halted to allow i@rovements to Steam Generator Secondary Water Chemistry.
r
. .-. umwnvE summ or -J
!- ,N OPERATING EXPERUNCE
. UNIT I i
JANUARY 1990 (Continued)
. January 22 At 1704 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.48372e-4 months <br /> the Unit's output was escalated to a nominal value of 100% i January 23 The Unit operated at a raninal value of 100% output.-
through
- January 31 t
1, l
i i
O' 5
Y l- g
___m____
p y - =- ,
s ,
UNIT SMUTDOWNS ANO .POWE2 C.EDUCTIOMS Docht No.' 50-334 BVPS Unit #1
~
- unit Name
'Date -February 9. 1990 '
Completed By n.A. winner REPORT MONTM JANUARY 1990 1 Telephone (412) 393-7621 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to .
Co. Date Typet (Nours) Reseon2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence 1 900101 S 0 N' 4 N/A RC FUELXX Unit operated at reduced output for fuel pre-conditioning and core flus mapping.
2 900108 F 0 B 5 N/A RC -INSTRU Unit's output. reduced to 681 to' perfora meis.tenance on the number-1 seat D/P transmitter for the.'A'-
coolant pump.
3 900119 F 3.2 A 1 1-90-001 E8 GENERA Unit shutdown to repair Inverter for the number 3 Vital Bus.
4 900100 F 44.4 8 9 N/A CG VALVEX Unit remained shutdown to repair.
tenking relief valves on the normal.
tetdown line and the regenerative heat exchanger.
1 2 3 4 F-Forced Reason: . Method: Exhibit G-Instructions for S-Scheduled ~A-Equipment Falture (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Te.ct. 2-Manual Scram f or i.icensee Event Report (LER) File C-Refueling . 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction . 4-Cont'd. from Previous Month ,
E-Operator Training & License Exam 5-Reduction 5 F-Administrative . 9-Other Exhibit I-Some Sour ce.
G-Operational Error (Explain)
H-Other (Emplain) i
'S..._
L , %, . . . -
...p .. .s . .wg.f .,.y e., e e_, _ _ _
ye g .4 y 3 y , .,,p.,w y .,. , ,,g3, u. w y.,
p '-
, .g .
't *'
0 yi' AVERMIE MILY UNTT N IEVEL L. -
q-Docket No. 50-334
, Unit BVPS Unit 1
-Date Febo m w 9, 1990 n- ompleted by M. A. Wirner 7blephone (412)'393-7621
)Ctml JarumW 1990 N DAY: AVERAGE DAILY POWER IEVEL DAY AVERAGE DAILY POWER IEVEL
@ (We-Net) (MWe-Net) p 1- '516 17 816 m-2 579 18 821 3 658 19 580 4 717 20 0
- 5 792 21 15 U. 6~ -821 _= 22 _
313
.i 7 821 23 825
-8 742- 24 813 l ,-
J 9 ;- 825 25 833 10 -813 26 838 11- '838 27 829 12' 821- 28 825
-i
.13. 829 29 838 i 14 825 30 825 l o
!. : i
. 15' -829 31 825 .!
. 16 817 -l l
INSTRUCTIONS'- ;
j p .On this format, list the average daily unit power level in We-Net for each day l E in the reportirq month. Cmpute to the nearest whole Inegawatt. -
l-L
, l g ,
I+
i
7
. OPERATING DATA REPORT DOCKET No.: 50 334 REPORT DATE: 02/07/90 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 OPERATING STATUS 1.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JANUARY 1990 3.-LICENSED THERMAL POWER (MWC): 2660
- 4. NAMEPLATE RATING (Gross MWe): 923 5.-DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810 8.-IP CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IP ANY (Net MWe): None
-10. REASONS FOR RESTRICTIONS, IF ANY: N/A l
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744,0 744.0 '120576.0
- 12. NO. 0F HRS. REACTOR WAS CRITICAL: 701.8 701.8 72840.3 13.' REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 696.4 696.4 71163.9
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1717462.0 1717462.0 167797517.5
- 17. GROSS ELECT. ENERGY GEN. (MWH): 566020.0 566020.0 53835709.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 532940.0 532940.0 50230090.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 93.6 93.6 61.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 93.6 93.6 61.2 1
- 21. UNIT CAPACITY FACTOR'(MDC): PCT 88.4 88.4 54.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 85.8 85.8 52.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 6.4 6.4 17.5
- 24. SHUTDOWNS 3CHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SMUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
. FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
-;s :
d6
s 5
' ., Q Wif - NARRATIVE SLMIARY OF -
-.. 5
, IttmEX ODERATING EXPERD!NCE LNIT II JANUARY 1990 :
, January l' 'Ihe Unit operated at approximately 85% output to stretch the through current fuel cycle.
January 31- ,
i
!' i b
,(,
s
.';,j * * * ~
r _j%- e
-[
li.
_ ~ .. ,,
UNIT SNUf00WNS AND POWER REDUCTIONS' Docket No./ 50-4122 Unit Name 8vPS unit 82 _
Date - - February 9, 1999
- Completed Sy' N.A. Winner REPORT MONTH JAwuARY 1990 '. Telephone (412) 393sF621 Method of- Licensee- Cause & Corrective Duration -Shutting Event System Component .
Action to No. Date Typel (Nours) ' Reason 2 coun Reactor 3 ' Report # code 4 code 5 Prevent Recurrence NONE 1 2 3 4 F-Forced Reason: Method: Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain)- 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram f or Licensee Event Report (LER) File.
C-Refueling 3-Automatic Scram (muREG0161).
0-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit 1-Same Source. -
G-Operational Error (Explain)
N-Other (Explain)
.; ,. _ - , . ,- .. ._ , _ _ - . . . , . . . . _ . - .. , , . . . . _ , . _ _ . . _ ._. -,_ .- _w
. ; c , ',
JE .
N ' AVERAGE IRILY UNIT POWER IEVEL
[
i I
Docket No. 50-412 Unit BVPS Unit 2 Date FebnmW 9.1990 Otmpleted by M. A. Wincier ;
Telephore ' (412) 393-7621 M0tGH JarumW 1990 j DAY AVERAGE IRILY POWER IEVEL IRY AVERAGE IRILY ICWER LEVEL '
(M4e-Net)- (PNe-Net) t 1 706 . 17 696 2 705 18 7 04
- 3. 702 19 708 4- 694 20 708 -l 5 706 21 704 ,
6 710 22 708
[
7' 702 23 704 Tj 8 706 24 704 .j L !
l 9 __ 698 '25 700
- li 10- 706 26 708 11~ 702 27 708 ,
l' l 1
12 706 28 704 l
1 13 706 29 708 i
14 , 706 30 712 -!
15 698 31 704 -
16 700 i
'I s
i INSTRUCTIONS
.On this format, list the average daily unit power level in MWe-Net for each day in the spding month. Ccapute to the nearest whole megawatt, i
k 1 'e c , J= *
~
OPERATING DATA REPORT DOCKET No.: 50 412 REPORT DATE: 01/07/90 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JANUARY 1990
- 3. LICENSED THERMAL POWER (MWt): 2660
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. - DESIGN ELECTRICAL RATING - (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR. RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE 11.. HOURS IN REPORTING PERIOD: 744.0 744.0 19359.0
- 12. - NO. OF HRS. REACTOR WAS CRITICAL: 744,0 744,0 16300.8
, .13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0,0
- 14. HOURS GENERATOR WAS ON LINE: 744.0 744.0 16170.9
- 15. UNIT RESERVE-SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1686721.0 1686721.0 40499465.4
- 17. GROSS ELECT ENERGY GEN. (MWH): 554400.0 554400.0 13020500.0
- 18. NET ~ ELECTRICAL ENERGY GEN. (MWH): 523891.0 523891.0 12280366.0 19.. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 83.5
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 -83.5
- 21. UNIT CAPACITY FACTOR (MDC): PCT 84.5 84.5 76.2'
- 22. UNIT CAPACITY FACTOR (DER): PCT 84.2 84.2 75.9
'23. UNIT' FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 -6.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST SThTUS (PRIOR TO COMMERCIAL OPERATION):
= .
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A s =
s w