Monthly Operating Repts for Jan 1990 for Beaver Valley Power Station Units 1 & 2
ML20006F321
Person / Time
Site: Beaver Valley
Issue date: 01/31/1990
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002270389
Download: ML20006F321 (10)


Text

,

B

?.

, _.'..s e -

[

.i Y

-Teiephone y m 3936000 Nuclear Group P O Box 4 -

. snippinoport. rA no7m Fi ruary 9, 1990 e

2 Deaver Valley Power Station Unit 1 - Docket No. 50-334, License No.- DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratirn Report ye 7

t f

'U. S. Nuclear Regulatory Ctatmission Document Control Desk Washington, D.C.

20555 Gentlemen:

In - accortlance with Appendix A,

Technical Specifications, the Monthly

+

Operating ' Report is - submitted for Unit 1 and Unit-2 for the month of January, 1990.-

l~

s t

H Very truly yours, H

1;. u.

f),

J. D. Sieber L

Vice President i

J.;

. Nuclear Group y

f MAW /Im3 -

u L-:

-Enclosures j/'

l1

.NRC Regional Office 4

cc:

King of Prussia, PA 9002270309 900131

,4 q

. fi:

l PDR ADOCM 05000334

,R PNU x

-n~'

/)

. \\j\\.

n w~,w e

~. -

+

Y y:. :

.v.

vc

-!OIMHLY OPERATING EILilDKE UNIT I JANUARY 1990 s

January 1

'Ihe Unit entered the month of January 1990, operating at 50%

T output in a power ra g up mode following the Unit's Seventh Refuelirq Outage.

At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the power ascension was halted when the Unit's output was 70%

i January 2

'Ihe Unit operated at 70% output to permit oore flux mapping.

January 3 At 0615 ' hours the Unit's output was raged up at 3% per hour.

At -1400 hours the power ascension was halted with the Unit operating at 90% output to permit oore flux mappirg.

January 4 At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> the Unit's output was escalated to 95%.

January 5

'Ihe Unit operated at 95% output.

s January 0 At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> the Unit's output was escalated to a naninal

s value of 100%.

January 7

'Ihe Unit operated at a nominal value of 100% output.

January 8 At 1004 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.82022e-4 months <br /> the Unit's output was reduced to 68% to permit repairing a leak on the Instrument Tubing of the number 1 seal D/P transmitter for the' 'A' Reactor Coolant Pug. At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> the Unit's output was ramped up at 3%'per hour..

January 9 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the power ascension was halted when the Unit achieved-100% output.

- January 10

'Ihe Unit operated at a nominal value of 100% cutput.

. through January 18 January 19 At 1622 hours0.0188 days <br />0.451 hours <br />0.00268 weeks <br />6.17171e-4 months <br /> a plant shutdown was initiated..At 1801 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.852805e-4 months <br /> the Unit was removed frun service to repair the inverter for the number 3 Vital Bus. At 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br /> the Unit entered Mode 3.

At 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br /> the inverter for the number 3 Vital Bus was restored to-an operable condition. 'Ihe Unit remained-shutilown to repair sans leaking relief valves on the Normal Letdown Line and the Regenerative Heat Exchanger.

January 20

'Ihe Unit remained shutdown to repair same leaking relief wives on the normal letdown line ard the regenerative heat exchanger.

January 21 At 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br /> the reactor was taken critical. At 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> the-~ Unit 'was synchronized and the Unit's output was ramped up to 30%.

'Ihe power ascenstion was halted to allow i@rovements to Steam Generator Secondary Water Chemistry.

r

-J umwnvE summ or

,N OPERATING EXPERUNCE UNIT I i

JANUARY 1990 (Continued)

. January 22 At 1704 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.48372e-4 months <br /> the Unit's output was escalated to a nominal value of 100%

i January 23 The Unit operated at a raninal value of 100% output.-

through

- January 31 t

1, l

i i

O' 5

Y l-g m

y -

=-

p s

UNIT SMUTDOWNS ANO.POWE2 C.EDUCTIOMS Docht No.'

50-334

~

unit Name BVPS Unit #1

'Date -February 9. 1990 Completed By n.A. winner REPORT MONTM JANUARY 1990 1 Telephone (412) 393-7621 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to.

Co.

Date Typet (Nours)

Reseon2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence 1

900101 S

0 N'

4 N/A RC FUELXX Unit operated at reduced output for fuel pre-conditioning and core flus mapping.

2 900108 F

0 B

5 N/A RC

-INSTRU Unit's output. reduced to 681 to' perfora meis.tenance on the number-1 seat D/P transmitter for the.'A'-

coolant pump.

3 900119 F

3.2 A

1 1-90-001 E8 GENERA Unit shutdown to repair Inverter for the number 3 Vital Bus.

4 900100 F

44.4 8

9 N/A CG VALVEX Unit remained shutdown to repair.

tenking relief valves on the normal.

tetdown line and the regenerative heat exchanger.

1 2

3 4

F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled

~A-Equipment Falture (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Te.ct.

2-Manual Scram f or i.icensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction.

4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit I-Some Sour ce.

G-Operational Error (Explain)

H-Other (Emplain) i

'S..._

...p

.s

.wg.f

.,.y e.,

e e_,

ye g

.4 y

3 y

.,,p.,w y

,,g3, u.

w y.,

L

p

,.g

't 0

yi' AVERMIE MILY UNTT N IEVEL L.

q-Docket No.

50-334 Unit BVPS Unit 1

-Date Febo m w 9, 1990 ompleted by M. A. Wirner n-7blephone (412)'393-7621

)Ctml JarumW 1990 N

DAY:

AVERAGE DAILY POWER IEVEL DAY AVERAGE DAILY POWER IEVEL (We-Net)

(MWe-Net) p 1-

'516 17 816 m-2 579 18 821 3

658 19 580 4

717 20 0

5 792 21 15 U.

6~

-821 22 313

_=

.i 7

821 23 825

-8 742-24 813 l,-

J 9 ;-

825 25 833 10

-813 26 838 11-

'838 27 829 12' 821-28 825

.13.

-i 829 29 838 i

14 825 30 825 l

o

. 15'

-829 31 825 i

. 16 817

-l l

INSTRUCTIONS'-

j p

.On this format, list the average daily unit power level in We-Net for each day l

E in the reportirq month. Cmpute to the nearest whole Inegawatt. -

l-L l

g I+

i 6

m

7 OPERATING DATA REPORT DOCKET No.:

50 334 REPORT DATE:

02/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621 OPERATING STATUS 1.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes

2. REPORTING PERIOD: JANUARY 1990 3.-LICENSED THERMAL POWER (MWC):

2660

4. NAMEPLATE RATING (Gross MWe):

923 5.-DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810 8.-IP CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IP ANY (Net MWe):

None

-10. REASONS FOR RESTRICTIONS, IF ANY:

N/A l

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744,0 744.0

'120576.0

12. NO. 0F HRS. REACTOR WAS CRITICAL:

701.8 701.8 72840.3 13.' REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

696.4 696.4 71163.9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1717462.0 1717462.0 167797517.5

17. GROSS ELECT. ENERGY GEN. (MWH):

566020.0 566020.0 53835709.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

532940.0 532940.0 50230090.0

19. UNIT SERVICE FACTOR: (PERCENT) 93.6 93.6 61.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 93.6 93.6 61.2 1
21. UNIT CAPACITY FACTOR'(MDC): PCT 88.4 88.4 54.4
22. UNIT CAPACITY FACTOR (DER): PCT 85.8 85.8 52.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 6.4 6.4 17.5
24. SHUTDOWNS 3CHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SMUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

-;s :

d6

s 5

'., Q Wif -

NARRATIVE SLMIARY OF 5

IttmEX ODERATING EXPERD!NCE LNIT II JANUARY 1990 January l'

'Ihe Unit operated at approximately 85% output to stretch the through current fuel cycle.

January 31-i i

b

,(,

s

  • s

.';,j

_j%-

~

e

-[

r li.

~..

UNIT SNUf00WNS AND POWER REDUCTIONS' Docket No./ 50-4122 Unit Name 8vPS unit 82 Date - - February 9, 1999

  • Completed Sy' N.A. Winner REPORT MONTH JAwuARY 1990

'. Telephone (412) 393sF621 Method of-Licensee-Cause & Corrective Duration

-Shutting Event System Component Action to No.

Date Typel (Nours)

' Reason 2 coun Reactor 3

' Report #

code 4 code 5 Prevent Recurrence NONE 1

2 3

4 F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain)-

1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram f or Licensee Event Report (LER) File.

C-Refueling 3-Automatic Scram (muREG0161).

0-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit 1-Same Source. -

G-Operational Error (Explain)

N-Other (Explain) w

. ; c,' '

JE

[

N

' AVERAGE IRILY UNIT POWER IEVEL i

I Docket No.

50-412 Unit BVPS Unit 2 Date FebnmW 9.1990 Otmpleted by M. A. Wincier Telephore ' (412) 393-7621 M0tGH JarumW 1990 j

DAY AVERAGE IRILY POWER IEVEL IRY AVERAGE IRILY ICWER LEVEL (M4e-Net)-

(PNe-Net) t 1

706 17 696 2

705 18 7 04 3.

702 19 708 4-694 20 708

-l 5

706 21 704 6

710 22 708

[

7' 702 23 704 Tj 8

706 24 704 L

. j l

9

__ 698

'25 700

l 10-706 26 708 11~

702 27 708 l'

l 1

12 706 28 704 l

1 13 706 29 708 i

14,

706 30 712 15 698 31 704 i

16 700

'I s

i INSTRUCTIONS

.On this format, list the average daily unit power level in MWe-Net for each day in the spding month. Ccapute to the nearest whole megawatt, i

k 1

'e c, J= *

~

OPERATING DATA REPORT DOCKET No.:

50 412 REPORT DATE:

01/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: JANUARY 1990
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. - DESIGN ELECTRICAL RATING - (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR. RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE 11.. HOURS IN REPORTING PERIOD:

744.0 744.0 19359.0

12. - NO. OF HRS. REACTOR WAS CRITICAL:

744,0 744,0 16300.8

.13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0,0

14. HOURS GENERATOR WAS ON LINE:

744.0 744.0 16170.9

15. UNIT RESERVE-SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1686721.0 1686721.0 40499465.4

17. GROSS ELECT ENERGY GEN. (MWH):

554400.0 554400.0 13020500.0

18. NET ~ ELECTRICAL ENERGY GEN. (MWH):

523891.0 523891.0 12280366.0 19.. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 83.5

20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0

-83.5

21. UNIT CAPACITY FACTOR (MDC): PCT 84.5 84.5 76.2'
22. UNIT CAPACITY FACTOR (DER): PCT 84.2 84.2 75.9

'23. UNIT' FORCED OUTAGE RATE: (PERCENT) 0.0 0.0

-6.4

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST SThTUS (PRIOR TO COMMERCIAL OPERATION):

=

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A s

=