MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141A5021997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Oyster Creek Nuclear Generating Station ML20141H7441997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Oyster Creek Nuclear Generating Station ML20137X8231997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Oyster Creek Nuclear Generating Station ML20137C3771997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Ocnpp ML20134P6151997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Oyster Creek Nuclear Generating Station ML20133M1751996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Oyster Creek Nuclear Generating Station ML20132D1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Oyster Creek Nuclear Generating Station ML20134M9761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Oyster Creek Nuclear Generating Station ML20129B1631996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Oyster Creek Nuclear Generating Station ML20117M7561996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Oyster Creek Nuclear Generating Station ML20116M6761996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Oyster Creek Nuclear Generating Station ML20115F8561996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Oyster Creek Nuclear Generating Station ML20112J7431996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Oyster Creek Nuclear Generating Station ML20112A6891996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Oyster Creek Nuclear Generating Station ML20101R0401996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Oyster Creek Station ML20101D7701996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ocnpp ML20100G5101996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Oyster Creek Nuclear Generating Station ML20096E8071995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Oyster Creek Nuclear Generating Station ML20099L7571995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Oyster Creek Nuclear Generating Station ML20094P8431995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Oyster Creek Nuclear Generating Station ML20093H3571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Oyster Creek Nuclear Generating Station ML20092H7741995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Oyster Creek Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
_ _ _ . _ _ . . . . . . _ . . . . . . . . _ _ .
e.
~ ~ ' 7 f ~' OPU NW Corporation
.. t g g' Post Office Box 388 Route 9 South Forked River.New Jersey 08731-0388 609 971 4000 Writer's Direct Dial Number:
February 15, 1990 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Dear Sir Subjects Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.
If you should have any questions, please contact Kathy Barnes, Oyster Creek Licensing at (609) 971-4390.
Very truly yours, ON E. E. Fit atrick Vice President and Director Oyster Creek EEF KFBadmd (MOR)
Enclosures cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Avenue King of Prussia, PA 19406 Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Oyster Creek Nuclear Generating Station r rw g l 9002270217 900131 PDR .ADOCK 05000219 y -t o c I ^
[r1 l
\\
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
7.
.3
! = ..
lu r
i MONTHLY PERFORMANCE REPORT - JANUARY 1990 At the beginning of the report period, oyster Creek was operating at a gross generator load of approximately 650 MWo.
On January 10, while removing a reactor recirculation pump from service to replace motor generator set brushes, the recirculation loop discharge valve failed to shut and was declared inoperable. In accordance with Technical Specifications, pit.nt chutdown commenced.
The discharge valve was subsequently cycled and returned to service.
Plant shutdown was terminated on January 11 and plant load was ;
increased to approximately 644 MWe. '
on January 23, plant load was reduced to approximately 70t power to remove a reactor feedwater string from service to facilitate repairs ,
to a feedwater pump drain line nipple leak. Following completion of repairs, power ascension commenced on January 29. The power increase was halted with plant load at 561 MWe due to increasing seal temperatures on a reactor recirculation pump and increasing drywell unidentified leak rate. The reactor recirculation pump was removed from service on January 31 and plant load was increased. Plant load ;
of 635 MWe was achieved on February 1, with four recirculation loops in service.
1 i
6
- _ _ _ _ = m - +_- m m--m
n 4-
- w. ..
- AVERAGE DAILY POWER LEVEL NET NWe DOCKET #. . . . . . . . 50219 i >
UNIT. .. . . . . . . . . OYSTER CREEK #1 L REPORT DATE . . . . . . . FEBRUARY 2; 1990 COMPILED BY . . . . . . .JEFF YEAGER TELEPHONE # . . . . . . 609-971-4585 l
t.
I JANUARY, 1990 L- MONTH t
DA1 &Di DAX 1Gi
- 1. 632 17. 630 p
- 2. 631 18. 630
- 3. 630 19. 631
- 4. 631 20. 630
- 5. 631 21. 629
- 6. ' 631 22. 631
- 7. 632 23. 542 8.- 631 24. 422
- 9. 631 25. 428
- 10. 628 26. 430 l_ 11. 612 27. 429
- 12. 630 28. 427
- 13. 629 29. 443
- 14. 630 30. 542
- 15. 630 31. 560
- 16. 628 1619B/13
- n. .
I' i'* c' GPERATING DATA REPORT OPERATING STATUS
- 1. DOCKET: 50-219
- 2. REPORTING PERIOD: 01/90
- 3. UTILITY CONTACTS JEFF YEAGER 609-971-4585
- 4. LICENSED THERMAL POWER (MWt): 1930
- 5. NAMEPLATE RATING (CROSS MWe): 687.5 X 0.8 = 550
- 6. DESIGN ELECTRICAL RATING (NET MWe): 650
- 7. KAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 642
- 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 620
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
- 10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): Jan. 23 to Jan 29 limited to 430 MWe Net
- 11. REASON FOR RESTRICTION, IF ANY: Jan. 23 to Jan. 29 "C" Feedwater String out of service.
MONTH XIhB gj!@MM
- 12. REPORT PERIOD HRS 744.0 744.0 176280.0
- 13. HOURS RX CRITICAL 744.0 744.0 112004.6
- 14. RX RESERVE SHTDWN HRS 0.0 0.0 918.2
- 15. HRS GENERATOR ON-LINE 744.0 744.0 108975.8
- 16. L'T RESERVE SNTDWN HRS 0.0 0.0 1208.6
- 17. GF.OSS THERM ENER (MWH) 1339000 1339000 182612059
( 18. GROSS EI.EC ENOR (HWH) 450180 450180 61572920
- 19. NET ELEC ENER (MWH) 433702 433702 59088680 2 0. - UT SERVICE FACTOR 100.0 100.0 61.8
- 21. UT AVAIL FACTOR 100.0 100.0 62.5
- 22. UT CAP FACTOR (MDC NET) 94.0 94.0 54.1
- 23. UT CAP FACTOR (DER NET) 89.7 89.7 51.6
- 24. UT FORCED OUTAGE RATE 0.0 0.0 11.7
- 25. FORCED OUTAGE HRS 0.0 0.0 14410.1
- 26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION): NONE
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP TIME: N/A l
l 1619B/14
$. 3,. ,
l e
oyster Creek Station #1 ,
Doc).et No. 50-219 l REFUELING INFORKATION - JANUARY, 1990 j 1
Name of Facility: Cyster Creek Station #1 l Scheduled date for next refueling shutdown: January 11, 1991 pending necessary ,
state approval. I 1
scheduled date for restart following refueling May 19, 1991
! Will refueling or resumption of operation thereafter require a Technical specification change or other license amendment?
Yes Scheduled date(s) for submitting proposed licensing action and supporting information July 15, 1990 Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis-methods, significant changes in fuel design, new operating procedures:
- 1. General Electric Fuel Assemblies - fuel design 3 and performar.ce analysis methods have been approved by the NkC.
- 2. Exxon Fuel Assemblies - no major changes have been made nor are there any anticipated.
The number of fuel assemblies (a) in the cors = 560 (b) in the opent fuel storage pool = 1595 .
(c) in dry storage = 37 ,
The present licensed spent fuel pool storage capacity and the size of any ,
t increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 2600 p The projected date of the last refueling that can be discharged to the spent ,
fuel pool assuming the present licensed capacity:
- 1. .
Reracking of the fuel pool is in progress. Nine (9) out of ten (10) racks have been installed to date. When reracking is completed, discharge capacity to the spent fuel pool will be available until 1994 refueling outage.
1619B/12-
UNIT SHUTDOWWS A5'D POWER REDUCTIONS DOCKET NO.80-219 UNIT NAME Ovster Creek DATE February 1990 COMPLETED BY R. Baran
- TELEPHONE 971-4640 REPORT MONTH JANUARY 1990 TYPE METHOD OF SHUTTING F: Forced DURATION DOWN THE REACIOR OR NO. DATE S: Scheduled (Hours) stEASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS /CODGEENTS 91 1/10 F 12.1 A 1 A Reactor Shutdown was commenced at 2307 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.778135e-4 months <br /> on January 10, after the
'A' Rx Recire Loop had to be isolated from the Rx due to a problem with it's discharge valve. This placed the plant on 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Tech spec Shutdown clock. The valve problem was resolved and the loop was returned to service.
The shutdorn was terminated at 0111 hours0.00128 days <br />0.0308 hours <br />1.835317e-4 weeks <br />4.22355e-5 months <br /> on January 11. Plant load at the time was 518 MWe (Gross).
92 1/23 F 148.3 A 1 A load reduction to 412 MWe (Gross) l was required to remove the 'C' Feed-water string from service to facilitate repairs to a leak on a drain line nipple on 'C' Rx Feedwater Pump. Average load during the repair time period was 443 MWe.
93 1/31 F O.7 A 1 Load reduction to 515 MWe (Gross) to remove 'A' Rx Recire Pump from service due to a seal failure.
SUMMARY
(1) REASON (2) METHO_D
- 4. Equipment Failure (Explain) E. Operaltor Training & License Exam 1. Manual B. Maintenance or Test F. Adelaistrative 2. Manual Scram C. Refueling G. Cperational Error (Explain) 3. Automatic Scram D. Regulatory Restriction H. Other (Explain) 4. Other (Explain)
. . . - - - -