Monthly Operating Rept for Jan 1990 for Oyster Creek Nuclear Generating Station.W/900215 Ltr
ML20006F155
Person / Time
Site: Oyster Creek
Issue date: 01/31/1990
From: Fitzpatrick E, Yeager J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002270217
Download: ML20006F155 (6)


Text

_ _ _ . _ _ . . . . . . _ . . . . . . . . _ _ .

e.

~ ~ ' 7 f ~' OPU NW Corporation

.. t g g' Post Office Box 388 Route 9 South Forked River.New Jersey 08731-0388 609 971 4000 Writer's Direct Dial Number:

February 15, 1990 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Dear Sir Subjects Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should have any questions, please contact Kathy Barnes, Oyster Creek Licensing at (609) 971-4390.

Very truly yours, ON E. E. Fit atrick Vice President and Director Oyster Creek EEF KFBadmd (MOR)

Enclosures cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Avenue King of Prussia, PA 19406 Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Oyster Creek Nuclear Generating Station r rw g l 9002270217 900131 PDR .ADOCK 05000219 y -t o c I ^

[r1 l

\\

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

7.

.3

! = ..

lu r

i MONTHLY PERFORMANCE REPORT - JANUARY 1990 At the beginning of the report period, oyster Creek was operating at a gross generator load of approximately 650 MWo.

On January 10, while removing a reactor recirculation pump from service to replace motor generator set brushes, the recirculation loop discharge valve failed to shut and was declared inoperable. In accordance with Technical Specifications, pit.nt chutdown commenced.

The discharge valve was subsequently cycled and returned to service.

Plant shutdown was terminated on January 11 and plant load was  ;

increased to approximately 644 MWe. '

on January 23, plant load was reduced to approximately 70t power to remove a reactor feedwater string from service to facilitate repairs ,

to a feedwater pump drain line nipple leak. Following completion of repairs, power ascension commenced on January 29. The power increase was halted with plant load at 561 MWe due to increasing seal temperatures on a reactor recirculation pump and increasing drywell unidentified leak rate. The reactor recirculation pump was removed from service on January 31 and plant load was increased. Plant load  ;

of 635 MWe was achieved on February 1, with four recirculation loops in service.

1 i

6

- _ _ _ _ = m - +_- m m--m

n 4-

w. ..
AVERAGE DAILY POWER LEVEL NET NWe DOCKET #. . . . . . . . 50219 i >

UNIT. .. . . . . . . . . OYSTER CREEK #1 L REPORT DATE . . . . . . . FEBRUARY 2; 1990 COMPILED BY . . . . . . .JEFF YEAGER TELEPHONE # . . . . . . 609-971-4585 l

t.

I JANUARY, 1990 L- MONTH t

DA1 &Di DAX 1Gi

1. 632 17. 630 p
2. 631 18. 630
3. 630 19. 631
4. 631 20. 630
5. 631 21. 629
6. ' 631 22. 631
7. 632 23. 542 8.- 631 24. 422
9. 631 25. 428
10. 628 26. 430 l_ 11. 612 27. 429
12. 630 28. 427
13. 629 29. 443
14. 630 30. 542
15. 630 31. 560
16. 628 1619B/13
n. .

I' i'* c' GPERATING DATA REPORT OPERATING STATUS

1. DOCKET: 50-219
2. REPORTING PERIOD: 01/90
3. UTILITY CONTACTS JEFF YEAGER 609-971-4585
4. LICENSED THERMAL POWER (MWt): 1930
5. NAMEPLATE RATING (CROSS MWe): 687.5 X 0.8 = 550
6. DESIGN ELECTRICAL RATING (NET MWe): 650
7. KAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 642
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 620
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): Jan. 23 to Jan 29 limited to 430 MWe Net
11. REASON FOR RESTRICTION, IF ANY: Jan. 23 to Jan. 29 "C" Feedwater String out of service.

MONTH XIhB gj!@MM

12. REPORT PERIOD HRS 744.0 744.0 176280.0
13. HOURS RX CRITICAL 744.0 744.0 112004.6
14. RX RESERVE SHTDWN HRS 0.0 0.0 918.2
15. HRS GENERATOR ON-LINE 744.0 744.0 108975.8
16. L'T RESERVE SNTDWN HRS 0.0 0.0 1208.6
17. GF.OSS THERM ENER (MWH) 1339000 1339000 182612059

( 18. GROSS EI.EC ENOR (HWH) 450180 450180 61572920

19. NET ELEC ENER (MWH) 433702 433702 59088680 2 0. - UT SERVICE FACTOR 100.0 100.0 61.8
21. UT AVAIL FACTOR 100.0 100.0 62.5
22. UT CAP FACTOR (MDC NET) 94.0 94.0 54.1
23. UT CAP FACTOR (DER NET) 89.7 89.7 51.6
24. UT FORCED OUTAGE RATE 0.0 0.0 11.7
25. FORCED OUTAGE HRS 0.0 0.0 14410.1
26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION): NONE
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP TIME: N/A l

l 1619B/14

$. 3,. ,

l e

oyster Creek Station #1 ,

Doc).et No. 50-219 l REFUELING INFORKATION - JANUARY, 1990 j 1

Name of Facility: Cyster Creek Station #1 l Scheduled date for next refueling shutdown: January 11, 1991 pending necessary ,

state approval. I 1

scheduled date for restart following refueling May 19, 1991

! Will refueling or resumption of operation thereafter require a Technical specification change or other license amendment?

Yes Scheduled date(s) for submitting proposed licensing action and supporting information July 15, 1990 Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis-methods, significant changes in fuel design, new operating procedures:

1. General Electric Fuel Assemblies - fuel design 3 and performar.ce analysis methods have been approved by the NkC.
2. Exxon Fuel Assemblies - no major changes have been made nor are there any anticipated.

The number of fuel assemblies (a) in the cors = 560 (b) in the opent fuel storage pool = 1595 .

(c) in dry storage = 37 ,

The present licensed spent fuel pool storage capacity and the size of any ,

t increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present licensed capacity: 2600 p The projected date of the last refueling that can be discharged to the spent ,

fuel pool assuming the present licensed capacity:

1. .

Reracking of the fuel pool is in progress. Nine (9) out of ten (10) racks have been installed to date. When reracking is completed, discharge capacity to the spent fuel pool will be available until 1994 refueling outage.

1619B/12-

UNIT SHUTDOWWS A5'D POWER REDUCTIONS DOCKET NO.80-219 UNIT NAME Ovster Creek DATE February 1990 COMPLETED BY R. Baran

  • TELEPHONE 971-4640 REPORT MONTH JANUARY 1990 TYPE METHOD OF SHUTTING F: Forced DURATION DOWN THE REACIOR OR NO. DATE S: Scheduled (Hours) stEASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS /CODGEENTS 91 1/10 F 12.1 A 1 A Reactor Shutdown was commenced at 2307 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.778135e-4 months <br /> on January 10, after the

'A' Rx Recire Loop had to be isolated from the Rx due to a problem with it's discharge valve. This placed the plant on 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Tech spec Shutdown clock. The valve problem was resolved and the loop was returned to service.

The shutdorn was terminated at 0111 hours0.00128 days <br />0.0308 hours <br />1.835317e-4 weeks <br />4.22355e-5 months <br /> on January 11. Plant load at the time was 518 MWe (Gross).

92 1/23 F 148.3 A 1 A load reduction to 412 MWe (Gross) l was required to remove the 'C' Feed-water string from service to facilitate repairs to a leak on a drain line nipple on 'C' Rx Feedwater Pump. Average load during the repair time period was 443 MWe.

93 1/31 F O.7 A 1 Load reduction to 515 MWe (Gross) to remove 'A' Rx Recire Pump from service due to a seal failure.

SUMMARY

(1) REASON (2) METHO_D

4. Equipment Failure (Explain) E. Operaltor Training & License Exam 1. Manual B. Maintenance or Test F. Adelaistrative 2. Manual Scram C. Refueling G. Cperational Error (Explain) 3. Automatic Scram D. Regulatory Restriction H. Other (Explain) 4. Other (Explain)

. . . - - - -