s 4t . . ' 4' ,

PIIILADELPHIA ELECTRIC COMPANY

@.s

. pexu eornw-tem poets os a scattaucr IT.ACH BUTIDM ATOMIC POWER STATION R. D.1. Box 208 Delta, Itnnsylvania 17314 017) 4$6 7014 D. M. Smith Vice President .

1 i

Docket Nos. 50 277 50-278 U.S. Nuclear Regulatory Commission j Document Control Desk Washington, DC 20555 ,

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report 1

Gentlemen: I Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of January 1990 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatoly Guide 10.1, Revision 4 Sincerely, '

A/

-f /N fWhb DMS/TEC/MJB: cmc Enclosure ec: R.A. Burricelli, Public Service Electric & Gas -

T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident Inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region 1, USNRC H.C. Schwemm, Atlantic Electric i J. Urban, Delmarva Power INPO Records Center b

M"*Idn NE7 m R

CC0190.NRC j ,

/ i l

s'

r

.e ,

NRC Monthly Operations Summary Peach Hottom Atomic Pour Station January 1990 UNIT 2 Unit 2 began the month at 80% power and increasing. The unit reached 100% power on January 1 and full power operation continued through the month. On January 27, operators observed the 'B' Reactor Feed Pump (RFP) flow drifting up with no apparent RFP speed or power changes. The reactor feedwater and reactor steam flow mismatch caused reactor level to stabilize approximately 1 inch lower than normal. The problem was a leak on the *B" RFP flow element. The reactor level was placed in single element control and reactor power was decreased to 800 MWe. The 'B' RFP was removed from service.

The unit was then shut down for repair of the leak. Repair was completed on January 30 and the mode switch was placed in Startup. The main generator was synchronized to grid on the same day. Unit 2 power increases progressed smoothly and the unit ended the month at 95% pcwcr.

UNIT 3 Unit 3 began the month at 48% power with repairs to the 'A' RFP and reassembly of the *C" RFP in progress.

After completing repairs, power was increased to 70% and recirc purnp trip tests were completed. The control rod pattern was adjusted for 100% and power increases were imtiated. The unit reached 100% power on January 5.

A shutdown was initiated on January 8 when the HPCI and RCIC systems were determined to be inoperable because of minor surveillance test deficiencies. Reactor power was reduced to 99%. Following the return to i service of RCIC on January 8 and HPCI on January 9, reactor power was held to 99% because of thermal power limits. Power ascension program testing continued and was completed.

Power was increased as core thermal limits permitted and the unit continued full power operation with one power reduction on January 21 for control rod pattern adjustment and setting the recire pump high stops.

On January 28, the unit was shutdown because of an EHC leak on a turbine control valve. The unit ended the month with valve repairs in progress.

)

CCD190.NRC

w a  :, ,

'0

,yy L,.

Docket No. 50 277

, Attachment to le Monthly Operating Report for January 1990 i.

, UNIT 2 REFUELING INFORMATION

1. Name of facility:

l Peach Bottom Unit 2

?

', 2. Scheduled date for next refueling shutdown:

Reload 8 scheduled for January 6,1991

3.

Scheduled date for restart following refueling:

Restart following refueling scheduled for April 5,1991 4.

Will refueling or resumption of operation therefore require a technical specification chang license amendment?

. No.

If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Not applicable, a

6.

Important licensing considerations associated with refueling, e.g., new or different fu unredewed procedures: design or performance analysis methods, significant changes in fuel desig In order for PECo to do reload licensing analyses in-house for Unit 2 Cycle 9, NRC approva report (PECO.FMS-006) must be obtained by May 31,1990. This report is the last in a series of six reports to demonstrate PECo's ability to perform the analyses.- The report has been submitted and is scheduled for completion in May 1990.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core 764 Fuel Assemblies (b) Fuel Pool .1734 Fuel Assemblies,58 Fuel Rods CG190.NRC

+

+

0 **D " * * *

  • I i,

i g

l . i Docket No. 50 277 )

Attachment to Monthly Operating Report for January 1990 Page 2 UNIT 2 RITUELING INFORMATION (Continueu) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in lice '

capacity that has been requested or is planned,in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected present capacity: date of the last refueling that can be discharged to the spent fuel pool assu September 2003 without full core offload capability.

September 1997 with full core offload capability.

k I

i t

I CC0190.NRC j ,,,, __ _--,v,4... - -

- I t ;- -

4-Docket No. 50-278 I Attachment to i Monthly Operating Report for January 1930 l I

i e- UNIT 3 REFUELING INFORMATION Li 1. Name of facility:

Peach Bottom Unit 3 4 1

2. Scheduled date for next refueling shutdown:

1 .i

. , . Reload 8 scheduled for August 31,1991 3.

Scheduled date for restart following refueling Restart following refueling scheduled for October 29,1991 4.

license amendment?Will refueling or resumption of operation thereafter require a tech s

No, ,

if answer is yes, what, in general, will these be?

4 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: '

i 6.

Important licensing considerations associated with refueling, e.g., new or differen unreviewed procedures: design or performance analysis methods, significant changes in fuel None expected.

CC)190.NRC

. $El$ik'WW

I Docket No. 50-278 Attachment to l Monthly Operating Report for January 1990 Page 2 i

.Ub3I,1REl UEL.ING INFORM ATION (Continued) 1 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a) Core 764 Fuel Assemblics . ,

k (b) Fuel Pool .1496 Fuel Assemblics,6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. Modification of the fuel pool is expected to be complete in the fourth quarter of 1990.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

With the current fuel pool capacity (prior to the completion of the fuel pool rcracking modification):

September 1996 without full core offload capability.

End of next cycle with full core offload capability (est. January 1991).

With increased fuel pool capacity (subsequent to the completion of the fuel pool reracking

modification)

September 2004 without full core offload capability, i

September 1998 with full core offload capability.

1 l

}

l l

CCD190.NRC l

_n.-...~ --

l

~ -

cc - > , '.' + ,

g' , ,.

,, ., 6

.y . ,

t. a* t 5

, ,  ; AVERAGE DAILY UNIT POWER LEVEL i

r 0

= DOCKET N04 50 - 277=  !

-i UNIT PEACH BOTTOM UNIT 2. ,

t i DATE FEBRUARY 15, 1989=

,v  ;

l

. COMPANY PHILADELPHIA ELECTRIC COMPANY  !

t Y, M.'J. BARON

f. SUPERVISOR

" l REPORTS GROUP ..

3;: . PEACH BOTTOM ATOMIC POWER STATION-  ;!

TELEPHONE (117)456-7C14EKT.3321 f

5

{N MONTH ' JANUARY 1990 f

i

, , :c - '. -1

 ! DAY' AVERAGE DAILY POWER LEVEL- DAY AVERAGE DAILY POWER LEVEL

{ (MWE-NET). (MWE-NET)-  !

i <

1' 1075 17 1070- l l t u

{$' y ;2 --1075 18 1070

)

$ 3 1059 19 1070 4' ~ 1058 - - 20 1073  ?

)

I:' $ '1073 ' 21 1073  ;

6 1073 - 22 1073' ';

.c. -

k '~ ' 7 1069 ' '

23 1069 ' f

.a hl 8 1073 24 1069- . l, 7

[1 9 1069 25 1069 )

I ,.- 10. 1073 26 1077 .tp it

16' 1074 1; p.

h

.l e cw 4 - ~,

3 3

f. -I L ,

.l w

I'- .

t

'D F

{

k.'

i y ;w , , ,. , . , _ . . _ . , ,

I-_... ,

I

,,, . a -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE FEBRUARY 15, 1989

, , COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH 80TTDM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 MONTH . JANUARY 1990 DAY A'!ERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVE-NET) (MVE-NET) l' 667 17 1071 2 739 18 1071 3 700 19 1076 4 877 20 1076 5 1048' 21 1038 6 1071 ' 22 1066 7 1059 23 '1066 8 1051 24 1071 9 1059 25 1071 10 1055 26 1079 11 1059 27 1068 12 1075 28 387 15- 1067 29 .0 14 1071 30 0 15 1071 31 0 16 1075 3

l em+

>ypyY , e *. .

g .; , ,

p;< 3 -p;. . ,

b;i , OPERATING DATA REPORT DOCKET NO. 50 - 277 a- ,

DATE FEBRUARY 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. fARON SUPEkflSOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION ,

TELEPHONE (717) 456-701A EXT. 3321  !

OPERATING STATUS I '-

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD: JANUARY,1990 3._ LICENSE 0 THERMAL POWER (HVT): 3293

!i 4.NAMEPLATERATING(GROSSMWE): 1152 5.DESIGNELECTRICALRATING{NETMWE): 1065

6. MAXIMUH DEPENDABLE CAPACITY (GROSS MWE): 1098 7.MAXIMUMDEPENOABLECAPACITY(NETMWE): 1055 i' 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.POWERLEVELTOVHICHRESTRICTED,IFANY(NETMWE): .

10. REASONS FOR RESTRICTIONS, IF ANY:

1 THIS MONTH YR-TO-DATE CUMUL.ATIVE 11, HOURS IN REPORTING PERIOD 744 744 136.560  !

12. NUMBER OF HOURS REACTOR VAS CRITICAL 699.4 699.4 80.226.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 F '
14. HOURS GENERATOR ON-LINE 681.2 681.2 77.286.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,208,600 2,208,600 227,504,793 17.GROSSELECTRICALENERGYGENERATED(HWH) 727,400- 727,400 74,787,290
18.'NETELECTRICALENERGYGENERATED(MVH) 706,078 706,078 71,560,927 PAGE 1 0F 2

'l l

Cm '

Ej ,

a... .'.

~

.9

,y , -. i c: ,

kf . . '

IU W OPERAT]NG DATA REPORT-(CONTINUED) DOCKET NO. 277 'I

t,

,_ ;r r; b'y; - L F . , '

DATE FEBRUARY 15. 1989 .

[] > . .

THis MONTH YR-TD-DATE CUMULATIVE _q t . . .

19. UNIT SERVICE FACTOR 91.6 91.6 '56.6 a

i  : 20. UNIT AVAILABILITY FACTOR 91.6 -91.6

r. -56.6 l

. m.,

214UNITCAPACITYFACTOR(USINGMDCNET)- 90.0 90.0 49.7-
22. UNIT CAPACITY FACTOR (USING DER NET) 89.1' ' 89.1. 49;2 =
23. UNIT FORCED OUTAGE RATE 8.4 8.4. 14.4

~

s

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURAT10N'0F EACH):

MIDCYCLE MAINTENANCE OUTAGE, BEGINNING MARCH 3. WITH A DURATION OF 34 WEEKS- .;

~

25J IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

.26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST- ACHIEVED.

INITIAL CRITICALITY. 09/16/73 >

INITIAL ELECTRICITY 02/18/74 'E 4 ,

COMMERCIAL OPCRAT!0N 07/05/74 s

F e

t 4

PAGE 2 0F 2' i

.i n, e' s E ,

a-Q@ > 4~.% . s6 ...y--,

- - , + n ;,, , _ . . . - . . ~ . . . - . - -,,

g ,

.s. .

7,,. .*-

l-.

OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE FEBRUARY 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
2. REPORTING PERIOD: JANUAP.Y. 1990 3.LICENSEDTHERMALPOWER(MWT): 3293 4.NAMEPLATERATING(GROSSHWE): 1152 5.DESIGNELECTRICALRATING(NETHVE): 1065 6.HAXIMUMDEPENDABLECAPACITY(GROSSMWE): 1098
7. MAX 1 HUM DEPENDABLE CAPACITY (NET MWE): 1035 8,IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

TH15 PS'fTH YR-TO-DATE CUMULATIVE i 11, HOURS IN REPORTING PERIOD 744 744 132,456

12. NUMBER OF HOURS REACTOR WAS CRITICAL 683.3 C83.3 77,842.1
13. REACTOR RESERVE SHUTDOVN HOURS 0.0' O.0 0.0
14. HSURS GENERATOR ON-LINE 655.9 656.9 i$,059]
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.GROSSTHERMALENERGYGENERATED(HWH) 2,108,952 2,108,952 218,271,821
17. GROSS ELECTRICAL' ENERGY GENERATED (MWH) 687,700 687,700 71,559,832 18.NETELECTRICALENERGYGENERATED(MWH) 668,478 668,478 68,510,946 PAGE 1 0F 2

=

cu ,w; ,

., , , . . '"w ' '

s'g

? j- - -  : e ;--

1 6"

+ ggc 'y s.

_  :.,p f t ...

Ujij 'JO . b 1 1

l ,

OPERATING'bATAREPORT(CONTINUED) - DOCKET NO. 50 - 278-

- DATE FEBRUARY 15,-1989 ..

THIS MONTH YR-TO-DAIE CUMULATIVE'

19. UNIT SERVICE FACTOR 88.3 88.3 56.7 1,.. ;g, 20.. UNIT AVAILABILITT FACTOR 88.3 88.3 56.7 e 21.UNITCAPACITYFACTOR(USINGHDCNET) '86.8 - 86.8 50.0-22.UNITCAPACITYFACTOR(USINGDERNET) 84.4 ,84.4 48.6
i. f -- 23. UNIT FORCED OUTAGE RATE 11.7 '11.7- 13.2

, ;24.SHUTDOWNSSCHEDULEDDVER.NEXT6 MONTHS (TYPE,DATE,ANDDURATIONOF_EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARIUP:

=i-

'26.' UNITS IN TEST STATUS (PRIOR' TO COMMERCIAL OPERATION): FORECAST ' ACHIEVED-INITIAL ~ CRITICALITY- 08/07/74' INITIAL ELECTRICITY- '09/01/74; 1

COMMERCIAL OPERATION 12/23/74

)

- +

i i

4-PAGE 2 0F 2

--j

.q fk a

k i

4 l

1 i

k. -

. -_ _ _ _ . - - _ . _ _ _ _u

?

  • u '

f ,,;. ,; ;

  • i : * ,

9 i

?

c l;

UNIT SHUTDOWNS AND POVER REDUCTIONS DOCKET NO. $0 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY IS, 1989 REPORT MONTH JANUARY. 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWEA STATION

. TELEPHONE (717)4$6-7014 EXT.3321 .

METHOD OF LICENSEE- SYSTEM COMPONENT CAUSE AND CORRECTIVE

. TYPE DURATION REASON SHUTTING DOVN EVENT CODE CODE ACil0N TO

. N0. DATE (1) (HOURS) (2) REACTOR (3) REPORT i- (4) (5). PREVENT RECURRENCE

l 22 900127 F 62.B A 2 N/A CH INSTRU LEAK ON B RFP FLOW ELEMENT. INSTRUMENT LINE. NOT REPA!RABLE AT POWER.

62.8 f

(1) (2) (3) (4).

F - FORCED - REASON METHOD  !

EXHIBIT G - INSTRUCTIONS S - $CHEDULFD. A-EQUIPMENTFAILURE(EXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA

~

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE

- C - REFUELING 3 - AUTOMATIC SCRAM. CVENTREPORT(LER)

- D - REGULATORY RESTRICTION 4 - DTHER (EXPLAIN) FILE'(NUREG-0161).

e E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H-OTHER(EXPLAIN). EXHIBli ! - SAME SOURCE p q i

i I

l t

- i j

m - a v ,:..

e.,

p .. ;. .,

y,.- ..

i s

-i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50 - 278 UN!T NAME PEACH B0TTOM UN!T 3 b DATE FEBRUARY 15, 1989 REPORT HONTH JANUARY. 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY f I

H. J. BARON SUPERVISOR-REPORTS GROUP ,

PEACH BOTTOM ATOHlc POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 HETHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO

' NO. DATE .(1) (HOURS) (2) REACTOR (3)- REPORT # (4) (5) PREVENT RECURRENCE 1

l'6 900102 S 2.0 H 4 N/A' ' R8 CONR00 CONTROL P00 PATTERN A0JUSTHENT.

' REACTOR WAS NOT SHUT 00VN. .

17 900128 F 87.1 -A 2 3-90-02 CC VALV0P EHC 0!L LEAK, 89.1 (1) '(2) I

.(3) (4) x F - FORCED REASON HETH00 EXHIBIT G - INSTRUCTIONS:

. S'- SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN)- 1 - MANUAL .

FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.- ENTRY SHEETS FOR LICENSEE C - REFUEllNG ~ 3 - AUTOMATIC SCRAM. . EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4-OTHER(EXPLAIN) ' FILE (NUREG-0161)

.E - OPERATOR TRAINING +. LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G-OPERATIONALERROR(EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE f