Forwards Safety Insp Repts 50-456/90-02 & 50-457/90-02 on 900116-31 & Notice of Violation.Insp Focused on Mods & Design Changes Implemented During Unit 1 Refueling Outage
ML20006E963
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/16/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20006E964 List:
References
NUDOCS 9002270008
Download: ML20006E963 (2)


See also: IR 05000456/1990002

Text

.

-

- - .

Q.

QG

j

p , ' , ' L ,, ,

t

+

,

i

FEB 16 1G

?

F

-. Docket No. 50-456

'

0ccket No. 50-457

<

Cocoonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post 0ffice Box 767

,

'

Chicago, IL 60690

.

Gentlemen:

,

.

.

>

This refers to the routine safety inspection conducted by P. R. Rescheske and

i

,

V.-P. Lougheed of:this office on January 16-31, 1990, of activities at the

Braidwood Nuclear Power Station Units 1 and 2, authorized by NRC Operating

w

. Licenses No. NPF-72 and NPF-77, and to the discussion of our findings with

Mr. K..L. Kofron and others of your staff at the conclusion of the inspection.

'

The-inspecti'>n focused on the modifications and design changes implemented

during the Unit 1 refuel outage. Also included in this' inspection was a review

of the program for controlling temporary plant alterations. The enclosed copy

of our inspection report identifies areas examined during the inspection.

.

Within these. areas, the-inspection consisted of a selective examination of

procedures and representative records, observations, and interviews with

personnel.

L

During this inspection, certain of your activities appeared to be in violation

-of NRC requirements, as specified in the enclosed Notice. A written response

tis required.

Violations were identified for failure to provide design control

,

!

' measures for temporary alterations, commensurate with those applied to the

i

L,

' original design;-and for failure to update a surveillance procedure affected

t

by a modification, which resulted in not satisfying a Technical Specification

surveillance requirement. Regarding the first violation,-your response-should

!

address the adequacy of your temporary alteration program in establishing and

controlling the design of all. temporary alterations, and in establishing the

suitability of materials and parts used in safety-related applications. Your

response should also include an evaluation of the acceptability of installed

Teeporary Alteration 88-1-019.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

thislletter, the enclosures, and your response to this letter will be placed

in-the NRC Public Document Room.

g

The responses directed by this letter and the accompanying Notice are not

L

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

'

9002270008 900216

PDR

ADOCK 05000456

O ts s

'O

PDC

d,

} Q L) j

-

-

-

. -

-

-

-

-

. .

.

-

-

r

4,-:,-

. ..

. . .

c4

p.-

F ED 16 199]

Connonwealth Edison Company

2

We will gladly discun any questions you have concerning-this inspection.

=

'

c

->

,/

.

Geoffrey C. Wri ht, Chief

,

Operations Branch

Enclosures:.

1.

Notice of Violation

2.-

Inspection Report

No. 50-456/90002(DRS);

.No.-50-457/90002(DRS)

- cc w/ enclosures:

T. J. Maiman, Vice President.

-PWR Operations

T.-Kovach, Nuclear

Licensing Manager

S. Hunsader, Nuclear

Licensing Administrator

R. E. Querio, Station Manager

D. E. Cooper, Regulatory

DCD/DCB (RIDS)pervisor

Assurance Su

Licensing Fee Management Branch'

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

'D. W. Cassel, Jr., Esq.

. Richard Hubbard

~

J. W. McCaffrey, Chief Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

E; Reis, OGC

Stephen P. Sands, NRR

b g ,,

R

RI

11

RIII

II

t ".

es

ske/cg

L

eed

lips Clayton

t

'

2//5/90

2/t

90

2 /f/90

2/i6/90

2/ /90