ML20006E865
| ML20006E865 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/15/1990 |
| From: | Swenson W Office of Nuclear Reactor Regulation |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| IEB-89-003, IEB-89-3, TAC-75446, TAC-75447, NUDOCS 9002260454 | |
| Download: ML20006E865 (4) | |
Text
'
.,,. m
{. ' :,'
l February 15, 1990 a
Docket Nos. 50-266 DISTRIBUTION:
and 50-301 4lL N NRC & Local PDRs PDIII-3 r/f JZwolinski JHannon WSwenson PKreutzer 0GC-WF1 EJordan ACRS(10)
Mr. C. W. Fay, Vice President CVanderniet, R111
. Nuclear. Power Department JGadzala, RIII Wisconsin Electric Power Company IJackiw, RIII 231 W. Michigan Street, Room 308 DLaBarge.NRR Milwaukee, Wisconsin 53201 PDIII-3 Gray Files
Dear Mr. Fay:
o
SUBJECT:
RESPONSE TO BULLETIN 89-03:
POTENTIAL LOSS OF REQUIRED SHUTDOWN
-MARGIN DURING REFUELING OPERATIONS (TAC NOS. 75446 AND 75447)
On November 21, 1989, the NRC staff issued Bulletin 89-03 entitled " Potential Loss of Required Shutdown Margin During Refueling Operations." This-bulletin, addressed.to all holders of operating licenses or construction permits for pressurized water reactors, requested that actions be taken to ensure that en adequate shutdown margin.is maintained during all refueling
- operations.. In-order to accomplish this, three actions were described
- -
1.
Assure that any intermediate ~ fuel assembly configuration (including -
control rods) intended to be used during refueling is identified and evaluated to maintain sufficient refueling boron concentration to result in a minimum shutdown margin of approximately 5%.
2.-
. Assure'that fuel loading procedures only allow those intermediate fuel assembly configurations that do.not violate the allowable shutdown margin'and that these procedures are strictly adhered to.
3.
Assure that the staff responsible for refueling operations is trained:
in the procedures reconsnended in item 2 above and understand the
. potential consequences of violating.these procedures. This training should include the fundamental aspects of criticality control with
-enriched fuel assemblies.
i l
. g22 g
,00,33
]
g m
i DFo i yo
a
-t
,R.;"'.
it
~Mr. C. W.(Fay By letter dated danuary-11,1990, you responded to Bulletin-89-03 and indicated that programs will be implemented to address all three actions described above.
Therefore, the staff. considers your response to Bulletin 89-03 to be satisfactory.
and TAC Nos. 75446 and.75447 to be closed.
Sincerely,
/s/
Warren H. Swenson, Project Manager Project Directorate 111-3 Division of Reactor Projects - III, IV, V and Special Projects cc: See next page i
s
=!
i r
?'
1 i
-DOCUMENT NAME:
AC NOS 75446/47.CL0 OUT MEMO LA/P )III-3 Pg/PD43 P 3
P0 11-3 Offi ce : f,9 Kreutzer kSA4Bs WSwenson/tg JFannpn Surname
-Date:
d2//$/90' m/d/fo 08/J.7/90 2]g/90 t
4
- 7... -
+.
2 Mr. C. W -Fay. ]
-J i
By letter dated ~ January-11, 1990, you responded to Bulletin 89-03 and indicated.
that programs will be implemented to address,all three actions described above.
i r
Therefore, the staff considers your response to Bulletin 89-03 to be. satisfactory-and' TAC Nos. 75446 and 75447 to be closed.
.Sigcerely, 4 (
1 Warren H. Swenson, Project Mannpr Project Directorate III-3 Division of Reactor Projects.-:111,
.1Y, V and Special Projects-cc: See-next page
.[
t f
J j
A
304e 3 l';
- R t Mr. C. W;- Fay Point Beach Nuclear Plant:
Wisconsin-Electric Power Company.
Units 1 and 2 t
~CC'
's
. Mr; Bruce Churchill, Esc.
Shaw, Pittman, Potts ant.Trowbridge a igo d i 637 Mr. James'J. Zach, Manager'
~ Point Beach'Huclear Plant Wisconsin' Electric Power Company
,6610 Nuclear Road Two Rivers, Wisconsin 54241-j Town Chairman Town of Two Creeks-Route 3 Two' Rivers ' Wisconsin 54241 Chairman Pu'olic-Service Comission i
of Wisconsin-Hills Farms: State Office Building Madison, Wisconsin ~53702
' Reg'ional Administrator, Region III U.S. Nuclear, Regulatory Commission
^
Office of' Executive Director for, Operations
- 799' Roosevelt; Road Glen Ellyn, Illinois 60137-Resident Inspector's Office ps U.S. Nuclear-Regulatory Comission L
- 6612: Nuclear Road j
- Two Rivers, Wisconsin 54241 4
l:g N
1 l
)
i t
l E,.
i