Discusses NRC 900122-23 Senior Managers Meeting Re Performance of Plants Licensed to Operate by Nrc.Util Has Demonstrated Sustained Improvement Sufficient to Warrant Removal from Category Requiring Increased NRC Attention
ML20006E560
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/12/1990
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Paquette J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9002260006
Download: ML20006E560 (3)


Text

-'

/

NUCLEAR REOULATORY COMMISSION l

)

mammotow.cs c.ssess

{

l yN -(....

FEB 121990 t

Docket Nos. 50-277 50-278 l

l t

Mr. Joseph Paquette f

Chairman of the Board, Chief Executive Officer and President j

Philadelphia Electric Company i

2301 Marcet Street Philadelphia, PA 19101

.i

Dear Mr. Paquette:

On January 22 and 23,1990, NRC senior managers met to review the perfonnance

[

of nuclear. power plants licensed to operate by the NRC.

This meeting is j

conducted semiannually to focus NRC resources on those plants and related At this meetin it was concluded issues-of greatest safety significance. sustained improvement su1;/icient to warrant l

Bottom. has demonstrated Peach removal from the category of plants that require increased attention from both i

?

'l NRC Headquarters and the Regional office.

A suwnary of the discussions held relating to Peach Bottom is provided below:

L The overail Perfornence of the Philadelphia Electric Company and the Peach l

e Bottom Station in 1988 and 1989 is impcVed and is chcracterizee b,y a i

positive cverall safety cult 1re.

During the Unit 2-phased power ascension, the NRC staff closely monitored plant operations, including 24 -

L hour coverage during. key evoluttows.

'The approach to operations was contro112d and cautious, with emphasis ou doing the, job correctly the first time.

The effectiveness of the new Shift Managers in safely-j conducting operattoric was par cicularly noteworthy.

There has been a positive' change in ottitude and approach to operations within the operstions department. ThehighqualityoperationsofUnit2duringpower ascension formed the basis for fully lifting the shutdown Order o' March L

I 1987.

The pipe replacement outage and subsequent startup on Unit 3 were noteworthy in their absence of significant events. The licensee's ability to assess its own performance, identify areas for further improvement and implement corrective action has repeatedly been demonstrated. This capability has significantly contributed to improved performance and NRC

. confidence in both corporate and station management.

An NRC Commission meeting open to the public has been scheduled for February Mr.

to review the results of the latest meeting of NRC managers.

~15, 1990, William T. Russell, the Region I Administrator, has discussed the basis for our conclusions with regard to the Peach Bottom facility with members of your staff.

i j

y mu mm,, ya fp-

~

ppc

c.

,,e

. Joseph Paquette -

s If you have any questions, do not hesitate to call me.

t.

Sincerely, Original Signed By:

James M. Taylor James M. Taylor Executive Director for Operations 1

cc: See Next Page i

t 4

t

)

5 1.,

l l

P l-1 l

DISTRIB'JTicli. Doc. t ~nic t

SEcy ke (s

OCA

'pDR OPA T. Murley W. Russell EDO r/f I

0F G-30EDO
ED

'.NAME :J0yer:em$M :JM

' D A T.E.. : 0 2 / 0 9 /9 0

... -. : 0 /h9 / 9 0..... :............... :... --.......... :-... - -. _.. -......... -...

V c

+

+

~

-.v.,

c

?-

~"~

Mr. L Joseph Paquette Peach Botton Atomic Power Station.

Units 2 and 3

, Philadelphia Electric Company a

i ec:

f Jr., Esq.

Single Point of Contact Troy B. Conner,ia Avenue, N.W.

P. O. Box 11880 1747 Pennsylvan Washington,D.C. 20006 Harrisburg, Pennsylvania 17108-1880

- Philadelphia Electric Company Mr. Thomas M. Gerusky, Director i

ATTN: Mr. D. M. Smith, Vice President Bureau of Radiation Protection i

Peach Bottom Atomic Power Station Pennsylvania Department of 1

Route 1. Box 208 Environmental Resources Delta, Pennsylvania 17314 P. O. Box 2063 l'

Harrisburg, Pennsylvania 17120 Philadelphia Electric twaay Mr. Albert R. Steel, Chairman ATTN: Regulatory Engineer Al-25 Peach Bottom Atomic Power $tation Board of Supervisors Route 1, Box 208 Peach Bottom Township Delta, Pennsylvania 17314 R. D. #1 Delta Pennsylvania 17314 Resident Inspector

- U.S. Nuclear Regulatory Comission Public Service Commission of Maryland 1

J Peach Bottom Atomic Power Station Enflintering Division AT'N: Chief Engineer P.O. Box 399 231 E. Baltimore Street Delta, Pennsylvania 17314 Raltimor4,MD 21202-1586 Regional Administrator, Reginn !

U.S. Nuclear Regulatory Comission Mr. Tom Magette Power Plant Research Program 475 Allendale Road Department of Natural Resources j.

T.ing of Prussia, Pennsylvania 19406 B.3

)'

Hr. Roland Fletcher Tawes State Office Building Department of Environment Annapolis, Maryland 21401 201 West Preston Street Baltimore, itaryland 21201

~-