Text
- - - _ _ , , _ . . . , ,
M
ue,
o
- (
s.c
'
a
.
FEB071990
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President-Nuclear
Correspondence Control Desk
P. O. Box 7520
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Combined Inspection Reocrt Nos. 50-277/90-02 & 50-278/90-02
"
Enclosed is the report of the team inspection coi. ducted by Leonard Cheung af
-
this office on January 8-12, 1990, of activities at the Peach Bottom Atomic
Power Station, Units 2 & 3.
These activities are authorized by NRC Operating
Licenses Nos. DPR-44 and DPR-56.
Discussions of our findings were held by
Mr. Cheung with Mr. J. F. Franz ar.d other members of your staff at the conclu-
sion of the inspection.
Specific areas examined during this ir.spection included your compliance with
the orders issued to implement R.G. 1.97 and are described in the NRC Region I
-
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
=
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Sign:d By:
Jack R. Strosnider
dg
Jacque P. Durr, Chief
ll
Engineering Branch
jj
Division of Reactor Safety
Enclosure:
s
NRC Region I Inspection Report Numbers 50-277/90-02 and 50-278/90-02
.
_
0FFICIAL RECORD COPY
CIR PB 2&3 90/02 - 0001.0.0
02/06/90
-,
Q 22 g y.f h
IE '. o i I (
(
Q
.
__
.
_. _ - _ _ - - _ _ - _ .
~
FEB 011990
Philadelphia Electric Company
2
.
cc w/ enc 1:
D. R. Helwig, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
D. M. Smith, Vice President, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
T. E. Cribbe, Regulatory Engineer, Deach Bottom Atomic Power Station
J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station
- T. B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
B. W. Gorman, Manager, External Affairs
E. J. Cullen, Esquire, Assistant General Counsel (Withaut Report)
R. L. Hovis, Esquire
T. Magette, Power Plant Siting, Nuclear Evaluations
G. Hunger, Director, i.icensing Section
D. Poulsen, Secretary of Harford County Council
R. J. Lees, Chairman, Nuclear Review Board
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Room (PbR)
Local Public Document Room (LPDR)
Nuclear Safety information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o er.ci)
DRP Section Chief
M. Conner, SALP Reports Only
PA0 (2) SALP Reports and All Inspection Reports
R. Martin, NRR
J.. Dyer, EDO
B.Marcus, NRR
(i T
RI:DRS b
RI:DRS
RI:DRS
WI.'d'U L Mr
Cheung/pmb/rw
Della Greca
Anderson
SWua.'dr T
A IIf#
2/l/90
2/ I /90
2/l /90
OFFICIAL RECORD COPY
CIR PB 2&3 90/02 - 0002.0.0
01/30/90
,