Forwards & Safety Evaluation Accepting BWR Owners Group Position Re post-accident Neutron Flux Monitoring as Alternative to Category 1 Recommendations.Per Reg Guide 1.97
ML20006E362
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/07/1990
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20006E363 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9002220744
Download: ML20006E362 (4)


Text

=.

s;

  • c w

g_ h J '

+*O%

NUCLEAR REGULATORY COMMISSION p

o k.... [j; L""

{

~

WASHINGT ON, D. C. 20555 February 7, 1990

. Docket No. 50-458 Gulf States Utilities Company ATTN: Mr. James C. Deddens

!SeniorVicePresident(RBNG)

Post Office Box 220 St. Francisville, Louisiana 70775

Dear Mr. Deddens:

SUBJECT:

POST-ACCIDENT NEUTRON FLUX HONITORING

)

~

Reference:

BWR Owners' Group'1etter (R. F. Janecek) to NRC (T. E. Murley),

"EWR Owners' Group Licensing Topical Report, Position on NRC Regulatory Guide 1.97, Revision-3, Requirenents for Post-Accident-NeutronMonitoringSystem"(GeneralElectricReport NEDD-31558), April 1,1988

~The Boiling Water Reactors 0wners' Group (BWROG) submitted the referenced

' document for staff review. This submittal proposed functional criteria for post-accident' neutron flux monitoring as an alternative to the Category I reconner.dations specified in Regulatory Guide 1.97.

The NP.C staff has. completed its review of the referenced document.. The encicsed letter dated January P9, 1990 and Safety Evaluation find the BWROG position unacceptable. Therefore, neutron flux monitoring instrumentation that conforms to Regulatory Guide 1.97 and 10 CFR 50.49 must be installed at River Bend Station. The schedule for installation shall comply with License Condition 2.C(14),. Attachment 5, Item 3 of Facility Operating License No.

NPF-47, as modified by Amendment No. 39 to the license.

GSUshallimplementmodifications(installationsorupgrade)forneutron flux nonitoring consistent with the guidance of Regulatory Guide 1.97, Revision 2 or the'NRC Staff's Safety Evaluation Report of the BWR Owners

. Group Licensing Topical (NED0-31558.. Position on NRC Regulatory Guide 1.97, Revision 3, Requirements for Post-Accident Neutron Monitoring

-System). Modifications, if required, shall be completed before restart from the next refueling outage starting after 18 months from the date of receipt of the.NRC' Staff Evaluation Report on NED0-31558, but no later a

- than startup from refueling outage No. 4 unless otherwise notified in writing by the NRC staff.

N 9002220744 900207 PDR ADOCK 05000458:

P puu

-4

..r.

7 A

February 7, 1990 Mr. Jarnes C. Doddens 2

undersigned on (questions regarding the above infortnation, please contact the If you have any 301) 492 3028.

Sincerely,

/s/

Walter A. Paulson, Project Manager Project Directorate IV Division of Reactor Projects. III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated' cc w/ enclosure:

See next page DISTRIBUTION w/o enclosure:

Docket F1 7 NRC PDR' Local PDR PD4-Reading G. Holahan MS 13Et.

F. Hebdon P.1Hoonan i

W. Paulson OGC-Rockville E. Jordan MS MHBB 3701 B. Marcus ACRS (10) MS P-315

-l PD4' Plant File-1 4

i l

UFt-~~iPD17E ~~O.iPD1 7....~.1PD17t-~~~

~ ~ ~ ~ ~ ~ ~ "

~~~~~~i~-

~~

..y.......:............:.._.......:...........:.........

NAME :PNoonan_

WPa 1 on:bj :FHebdon DATE :02/6 /90
02/0[/90
02/'l/90

~~~~~~' DTTitTAEEEtDRD~tDPY~~-~DE~ciiinTnrrai~ei-~RD'ETR/RG G7~

i

_ Mr.- James C. Deddens,

undersignedon(questionsregardingtheaboveinformation,pleasecontactthe If you have any 301)492-3028.

Sincerely, Yb b kW Walter A. Paulson, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page i

Mr. James C. Deddens Gulf States Utilities Company River Bend Nuclear Plant Cc' Troy B. Conner, Jr., Esq.

Mr. J. E. Booker i

Conner and Wetterhahn Manager-Nuclear Industry Relations 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.

20006 Beaumont, TX 77704 Mr. Les England Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Culf States Utilities Company Office of Environmental Affairs P. O. Box 220 P. O. Box 14690 St. Francisv111e, LA 70775-Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J._ David McNeill, III State of Louisiana Departnent of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office P. O. Box 94095 Resident Inspector Baton Rouge, Louisiana 70804-9095 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive President of West Feliciana Baton Rouge, Louisiana 70806 Police Jury P. O. Box 1921 St. Francisv111e, Louisiena 70775 Philip G. Harris Cajun Electric Power Coop. Inc.

Regional Administrator, Region IV 10719 Airline Highway U.S. Nuclear Regulatory Commission P. O. Box 15540 Office of Executive Director Baton Rouge, LA 70895 for Operations 611 Ryan Plaza Drive Suite 1000 Arlington,~ Texas 76011 L

L

.