Confirmatory Action Ltr CAL-I-90-03 Re Unsatisfactory Licensed Operator Requalification Training Program.Ltr Confirms Actions Taken to Ensure Deficiencies/Weaknesses in Licensed Operator Requalification Program
ML20006E320
Person / Time
Site: Limerick  
Issue date: 02/09/1990
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
CAL-I-90-03, CAL-I-90-3, NUDOCS 9002220644
Download: ML20006E320 (4)


Text

h' m:

a t~V 1

i.

na l

.FEB 91990-I Docket-Nos.

50-352 and 50-353

' CAL No.:

I-90-003 r

r Philadelp'hia Electric Company ATTN: - Mr. C.. A. McNeill, Jr.

Executive Vice President Nuclear.

m

' Correspondence Control Desk c

P 0 Box:7520 t

' Philadelphia, PA-19101 i

c Gentlemen:

l

Subject:

CONFIRMATORY ACTIdN LETTER (CAL) I-90-003 UNSATISFACTORY LICENSED i

OPERATOR REQUALIFICATION TRAINING PROGRAM The: purpose.of this letter is to confirm our understanding of those actions J

g which you have taken or will>take to ensure that deficiencies / weaknesses in

~your_1_icensed operator requalification program are promptly. corrected, andL that '

?

' adequate proficiency.of-licensed operators is maintained at the Limerick Generating Station (LGS) Units 1 and-2. These problems were identified as a result of licensed operator requalification examinations, administered by Region I.during the week of Jan_uary '29 through February 2,.1990, in which five of 14 individuals failed the examination. Based on these results, the NRC has deter-

mined that-the Limerick Station.Requalification Program is unsatisfactory, t

E Th'e examination deficiencies / weaknesses were discussed during an-exit meeting-held with 'the NRC Requal.ification examination team on February -2,1990,i and with the; Acting. Regional Admihistrator during a management meeting on_ February 5,.1990.

Your Basis for Continued Operation _was presented at that management meeting and was subsequently documentedLin your letter of February 7, 1990.

Your Basis-for Continued Operation is acceptable-pending administration and review of additional NRC Requalification' Examinations. These additional exami-nations will'be conducted during the weeks of February 12, 1990, and February 9

19,.1990.

l Based upon the commitments contained in your February 7, 1990 letter, it is our understanding that you have or will:

,1.

Remove from licensed duties those individual licensed operators who failed or who fail an NRC administerad Requalification Examination-during the weeks of February 5, 12, and 19, 1990.

2.

Not allow individuals, including members of the crew determined to be unsatisf actory, failing any portion of an NRC Requalification Examination to resume licensed duties before successfully passing an NRC administered Requalification Examination. This applies during the period that the NRC deems the Limerick Station Licensed Operator Requalification Program unsatisfactory.

'90'02220644 900209 dqh fPDR-ADOCK 05000352 J

V, PDC V,i

_s a

i

F A

24 s

Philadelphia' Electric Company 2

L 3.

Identify problems and root causes as'to why the requalification program was unsatisfactory. This analysis will identify.a corrective action.

' program with a schedule of milestones.

Submit the root cause analysis with proposed corrective actions to Region I in accordance with your letter of February 7, 1990.

The Limerick Station Licensed Operator Requalification Program shall be deemed to be unsatisfactory until further correspondence from NRC changes that status.

Issuance of the Confirmatory Action Letter does not preclude the issuance of an Order formalizing the above commitments.

If your understanding differs from that set forth.abovri please call me immediately.

The responses directed by the letter are not subject to the clearance procedures of the Office of

- Management and Budget, as required by the Paperwork Reduction Act of 1980, PL 86-511.

Thank you for your cooperat'on.

Sincerely, i

W d6frmA I (d r /2a u f I

William T. Russell Regional Administrator l

l-cc:

j R. J. Lees, Chairman, Nuclear Review Board G. M. Leitch, Vice President - Limerick Generating Station D. R. Helwig, Vice President - Nuclear Services l

S. J. Kowalski, Vice President - Nuclear Engineering I'

J. W. Durham, Sr., Vice President and General Council l

M. J. McCormick, Jr., Manager - Limerick Generating Station G. A. Hunger, Jr., Director - Licensing Section J. Doering, Project Manager - Limerick Generating Station J. F. O'Rourke, Manager - Limerick Quality Division t

L T. B. Conner, Jr., Esquire G. J. Madsen, Regulatory Engineer - Limerick Generating Station Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania i

bec:

5 Region I Docket Room (with concurrences)

J. Taylor, EDO OFFICIAL RECORD COPY CONTE / LIM. CAL /2/7/90 - 0001.0.1 1

02/06/90

Q;

[;l:i

~"

r

=

y my

[

tPhiladelphia' Electric Company;

' 3' bec'(con't'd;):

r t

JJ.lLieberman,OE, Hi Thompson, DEDS

,E

.J. Partlow, NRR.

.J.-Goldberg, OGC' C

J.: Dyer, E001

'i K..Perkins, OLB, NRR.

D. Lange, 0LB,- NRR -

?

R. Cooley, OLB, NRR-W. Kane, DRP l

R.-Gallo', DRS-- RI

-D. Holody, EO

-K. Smith,-Regional Attorney, RI R. Conte,:DRS, RI

.P. Eselgroth, DRS,.RI D. Florek, DRS Secretary of Enforcement Officer, RI

' Management Assistant, DRMA Section. Chief,.DRP DRS; Files (4)

[..

L

'I l

I 1

nY

  • DRS:RI'-
  • DRS:RI
  • E0:RI
  • REG.MTTY:RI *DRSTRI

'NRRiOLB'i I

F k/dmg/ajk Con {e *j Holody Smith Gallo-Perkins P

r a

2

.2/3/90 2/ -/90 2 8 /90 2/"\\ /90 2/[/90 2/9 /90.

a

  • D i*DRS:RI
  • D
RI

,RA:RI

'Johnst n Hod

,M t'i n Russe p L2/q / h I 2G/90 2/f/90 2/ /90

  • SEE PREV US NCURRENCE 0FFICIAL RECORD COPY CONTE / LIM. CAL /2/7/90 - 0001.1.0 02/06/90

[).

M.

i.4:

El - }(Il.

4 f

J Ph11adelphia' Electric Company 3'

s cc'(cont'd.):

Nuclear = Safety Information Center-(NSIC)

K

.NRC Resident' Inspector

. Commonwealth of Pennsylvania

'bec:

Region I Docket Room'(with concurrences)

~J.: Taylor, EDO g

'J. Lieberman, OE' H. Thompson, DEDS k

J. Partlow, NRR

-J. Goldberg.:OGC F

J.- Dyer, ED0 K. Perkins, OLB, NRR

~

D. Lange, OLBc NRR R. Cooley, OLB, NRR

-W.

Kane, DRP R. Gallo, DRS, RI i

D, Holody, E0 l

K.' Smith, Regional! Attorney, RI i

R. Conte, DRS,:RI P..Eselgroth, DRS, RI

..D. Florek, DRS

Secretary of Enforcement Officer, RI L

Management Assistant, DRMA Section Chief, DRP DRS~ Files (4) u

^

l 4

Wl'/

dco DRS:RJ Ed~RL REG.

7Y:RI OLB Df DRS:RI dmg/ajk Contff [' Holody l

Smith P

ins Kg Flore f

A Tehem

-L 2/ 9 2/7/90 2/7/90 2/

90 2/ 7 /90:

2/7/90 2/ 7 /90 kl DRS:RI DR. I RA:RI i

ston ~

Hod e M rt'in Russell 2/ Y/90 2/ /90 2/[/90 2/ /90 OFFICIAL RECORD COPY CONTE / LIM. CAL /2/7/90 - 0002.1.0 02/07/90 1