ML20006E226
| ML20006E226 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/07/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| NUDOCS 9002220341 | |
| Download: ML20006E226 (4) | |
Text
.-.
e UNITED STATES
[
S NUCLEAR REQULATORY COMMISSION E
REOlON I 476 ALLENDALE ROAD KING OF PRUSSIA. PENNSYLVANIA 19404 FE8 71990 Docket No. 50 213 Connecticut Yankee Atomic Power Company A'ITN: h1r. E. J. hfroczka Senior Vice President Nuclear g
Engineering and Operations Gmup U
P. O. Box 270 liartford, Connecticut 06141 Gentlemen:
I
SUBJECT:
INSPECTION OF TIIE EMERGENCY OPERATING PROCEDURES This letter is to formalize requests made in a conversation between Afr. Gary Buchard, of your staff, and htr. Barry Norris on February 6,1990, regarding a planned inspection of the Connecticut Yankee Atomic Power Plant Emergency Operating Procedures (EOPs) during the period of hiny 14 thmugh 25,1990. It is requested that the plant referenced simulator be made available for evaluation of the effectiveness of the EOPs as part of the inspection. Enclosure 1 is a list of reference material that is requested to be provided to the NRC no later that April 13, 1990. Enclosure 2 is a tentative schedule for the j
inspection period, including the required facility support.
Thank you for your cooperation in this matter. If you have any question regarding this request, please contact the undersigned at 215/337 5291, or the Inspection Team Leader, hir. Barry Norris, of our staff, at 215/337 5171.
i Sincerely, f
,L Robert hl. Ga
, Chief u
Operations Eranch Division of Reactor Safety j
Enclosures:
as stated O$$$a$h 3
g
\\
i cc w/ enclosures:
W. D. Romberg, Vice President, Nuclear Operations D. B. Miller, Station Superintendent R. O. Nordquist, Director of Quality Services i
R. M. Kacich, Manager, Generation Facilities Licensing S. E. Scace, Station Superintendent, Millstone Gerald Garfleid, Esquire Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident inspector i
State of Connecticut bec w/ enclosures:
Region 1 Docket Room (w/ concurrences) i DRP Section Chier A. Wang, LPM, NRR P. Eselgroth, DRS B. Norris, DRS J. Shediosky, SRI, lladdam Neck W. Raymond, SRI, Millstone J. Dyer, EDO DRS Files (2) bec w/o enclosures:
Management Assistant, DRMA i
hri h
0
/90 02/7/90 02/7/90
i l
l c
i ENCLOSURE 2 i
TENTATIVE SCIIEDUI,E AND REOUIRED FACit.ITY SUPPORT Monday. May 14th am travel to the site pm - badging of inspectors Entrance Meeting at 2:00 pm, h> cation TilD Tuesday. May 15th peticedure walkdowns and interviews walkdowns:
4 licensed operators, I auxiliary operator interviews: 4 Ilcensed operators (can be same as above operators)
Wednesday. May 16th throuch Monday. May 21st c<mtinue walkdowns and interviews walkdowns:
4 licensed operators, I auxiliary operator (each day) interviews: 6 additional personnel, TBD i
Mid insocction one 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> period in simulator for familiarization and scenario review, simulator instructor only two 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> periods in simulator for observing two different crews of licensed operators using the EOPs i
Tuesday. May 22nd and Wednesday. May 23rd complete walkdowns and interviews, as necessary inspection team preparations for working pre exit meeting Thursday. May 24th working pre exit with facility stati to discuss findings and obtain commitments, when appropriate Friday. May 25th am - Exit Meeting at 9:00 am, location TBD pm travel l
,?
.o ENCLOSURE 1 REFERENCE MATERIAL FOR EOP INSPFfflON 1.
Complete procedure index 2.
Emergency Operating Procedures L
3.
Abnormal Operating Procedurs 4.
Owners' Group Emergency ResIxmse Guidelines (revision used for the current EOPs) 5.
Procedure Generation Package, including:
a.
Plant Specine Technical Guidelines b.
Writer's Guide c.
Verincation & Validation Program d.
Training Plan for the EOPs 6.
Deviation document explaining differences between the Owners' Group ERGS and the plant specine EOPs 7.
Simulator Malfunciton Book 8.
14sson plans and simulator scenarios used in the simulator for training on the EOPs