COCPER NUCLEAR STATION.
Nebraska'Public Power District
"" " * "d" 7"NR@h"L^ii m
s-1 1
-CNSS908064
.g.:
I y
February 9, 1990
- =
i j, y Document Control' Desk
{",-
U.S.. Nuclear Regulatory Commission
'l Washington,'D.C.
20555 s
Subject:
Monthly Operating Status Report for January 1990, Docket No. 50-298-Gentlemen:
I
' Enclosed for your information and use is the Cooper Nuclear Station Monthly.
Operating Status Report for January 1990.- The report includes Operating Status,-
r Average Daily-Unit Power Level, Unit-Shutdown Data, and a Narrative Summary of; Operating Experience.
Should. you h 2ve any comments or require additional' information regarding this -
report,-please contact me.
4 Sine rel,
k.~~ -
G.
Horn Di ion Manager of Nuclear Operations-
.GRH/ JET:nd-
--Enclosures.
-cc:
G. D. Watson w/ enc.
R. D. Martin w/ enc.
Y i
0, L
- 9
'i 9002220246-900131-
(( &'f O
PDR - ADOCK 0500029s %.
-o
.PNU.
/h M (R :
i*
,s
OPERATIONS NARRATIVE Cooper Nuclear Station January 1990 No scheduled or unscheduled shutdowns or other significant power reductions other than end-of-cycle coastdown, were experienced
,.g
- during the month of January.
A capacity factor of 99.1% was achieved for the month.
I 1
4
'I L--
I
..],
~
-GPERATING DATA REPORT
~
+
DOCKET NO.
050-0298
'~
UNIT CNS DATE
,_Egbruary 9;-1990 L
OPERATING STATUS TELEPEONE (402)-825-5291 j t.
Unit Name:
Coooer Nuclear Station Notes
- 2. '
Reporting Period:
January 1990
- 3.
Uooneed Thermal Power (MWt):
2381
' di Nameplete Rating (Cross MWo):
836 5.
Design ElectiloalRating (Not MWe): 778 g
- 6. :
- Maximum Dependable Capacity (Gross MWe): 787
- 7.-
Maximum Dependable Capacity (Not MWe):
764-8.'
N Changes Occur in Capacity Retings (items Number 3 Through 7) Since Last Report, Give Reasons:
I
- 9.
Power Level To Which Restricted, N Any (Not MWo):
10' Romeons For Restriction,N Any;
- This Month Yr.-to-Date Cumulative 11.
. Hours in Reporting Period i 744.0 744.0 136.657.0
.l
' ~ 12.
-. Number of Hours Reactor was Critical 744.0 744.0 103.392.2
= 13.
Reacter Asserw Shutdown Hours 00 0.0 0.0
- 14. -
Hours Generator On-Une '-
-744.0 744.0 101.755.7 15.
- Unit Reserve Shutdown Hours -
0.0 0.0 0.0 ~
16.
Gross Thermal Energy Generated (MWH) 1.738.056.0 1.738.056.0 204.421.116.0
- 17.
Gross Eleottloal Energy Generated (MWH)
'583.711.0 583.711.0 65.919.584.0
- 18.
. Not Electrical Energy Generated (MWH) 563.523.0 563.523.0 63.578.718 0
- 19.
Unit Service Factor
'100.0 100.0 74.5
-I 20.'
~ Unit Availabil_ityFactor 100.0 100.0 74.5 21.
Unit Capacity Factor (Using MDC Net) 99.1 99.1 60.9
' 22.'
Unit Capacity Factor (Using DER Not) 97.4 97.4 59.8
, 23..
Unit Forced ' Outage Rate 0.0 0.Q.
4.8 -
- 24. -
Shutdown Scheduled Omr Next 6 Months (Type, Date, and duration of Each):
cc Refuelina and Maintenance Outaae 13. Scheduled March 1990: 8 week duration 25.
. N Shut Down'At End of Report Period, Est!?ated Date of Startup:
. 26. '
Units in Test Status (Prior to CommercialOperat!on):
Forecast Ahleved INITIAL. CRITICALITY INITIAL ELECTRICITY 9
. COMMERCIAL OPERATION ln
s.h..
i i
.s.'
1 AVERnGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE Februarv 9, 1990 TELEPHONE (402) 825-5291__
NONTE January 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(NWe-Net)
(NWe-Net) 1 770 17 759 1
2 770 18 757 3
772 19 756 4
771 20 753 5
74S 21 753 6
770 22 751 7
770 23 749
-8 772 24 746 9
772 25 744 10 769 26 746 11 768-27 745 12 766 28 742 13-764 29 740 14 762 30 739 15.
762 31 736 e
16 761 4
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
L
..^
[;
~~,
. _;)
=
~
+
..~.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.'
050 etna
~
u=TNaME C- - sm -
DATE:
Fotmaarv 9.1990 COtrLETED BY J. E. Thoenneen
' ~
TELEPHOSE (402) 825-5291
. REPORT MONTH January 1990 l-i l '.
Cause & Correceve l-Methodof Ucensee l
Duraten Shu %
Event System * -
Cormonent' Action to No.
Date Type '
(Hours)
Reason' Down Reactor
- Report #
Code Code Prevent Recummoe I
I I
i l
NONE THtS MONTH 1
F: Forced 2 Reason:
3 Method-4 Exhbit G-Insensctions for S: Scheduled A - Equenent Faibre (Explain) 1 - Manuel Properationof Data Entry B - Mantenance or Test 2 - ManuelScram Sheets for Ucensee Event C-Relueling 3-Autornate Scram Report (LER) File (NUEG4161)
. D - Regulatory Restncien 4-Conthued s
E - Operator Training & Ucense Examinston 5 - Reduced Load 5 Exhhit I-Some Source F - Admrdstrative 8 - Other G - Operational Error (Explain)
H - Other (Explain) h y-s f
.g e-7 w.*w s
p_.
w_g-=-
w' eawW l's y
q g
r+'%
g-a=
gy
.g m'r gy.
e.
es mugi
+se-g w
e e um
-s-p-e-
-