Proposed Tech Specs Re Surveillance Requirements for Sampling Fuel Oil from Discharge Line of Storage Tank Transfer Pumps for Impurities
ML20006E038
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/02/1990
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17285B017 List:
References
NUDOCS 9002160141
Download: ML20006E038 (1)


Text

.

ELECTRICAL POWER SYSTEMS' s

SURVEILLANCE REQUIREMENTS (Continued) b.

At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to I hour by checking for and removing accumulated water from the day fuel tanks.

c.

At least once par 92 days by removing accumulated water the fuel storage tanks.

I**00$$

At least once per 92 days and from new fuel oil prior to addition to

  • Loc d.

$3 the storage tanks, by obtaining a sample obtained in accordance with lg28,y#3 ASTM-D270-1975, and by verifying that the sample meets the following

' g j p p n. g minimum requirements and is tested within the specified time limits:

,8$# f #.

1.

As soon as sample is taken o-from new fuel prior to addition og,y+qf to the stor tank, as applicable, verify in accordance with i

E'u,3"oS,,{>oj8 g,,

the tests s ied in ASTM-0975-77 that the sample has:

a)

A water a diment content of less than or equal to ga cp-0.05 volum cent.

"OjhE$gE b)

A kinematic J ty 9 40'C of greater than or equal to i

, g p g y,5 g 1.9 centistok t less than or equal to 4.1 centistokes.

lE * >.o"'e7 c)

A specific gravi specified by the manufacturer @

1 l - m 2' 4 i 8 q

4 60/60'F of greate n or equal to 0.8299 but less than

> !} h e # # M N or equal to 0.8762 or an API gravity 9 60*F of greater 1

g E

ag than or equal to 30 de s.

j 1

0E g5 2.

Within 1 week after obtaining ample, verify an impurity y5MdNw" o

m level of less than 2 mg of insol s per 100 m1 when tested

&*p,E%

in accordance with ASTM-02274-70, 1

i u~u ct

  • $$[w);57d1 3.

Within 2 weeks after obtaining the sample, verify that the i

tr o r ** a 3 other properties specified in Table 1 of ASTM-0975-77 and EU0$3Yg i

Regulatory Guide 1.137. Position 2.a. are met wien tested in

,y8y88g accordance with ASTM-0975-77.

.$E 3E'

'At least once per 18 months, during shutdown, b : '.

l LE'Mc?o030 1.

Subjecting the diesel to an inspection in accordance with l

o 2 e.v l

d

  • 'sEyM" procedures prepared in conjunction with its manufacturer's

,@u a*

recommendations for this class of standby service.

~>w-S["a I

g "S id E E

h 2.

Verifying the diesel ',enerator capability to reject a load of i 5 '8 g M t l

greater than or equal to 1377 kW for DG-1, greater than or i

q I

ewaaeo j

equal to 1377 kW for DG-2, and greater than or equal to

.SSE.86 2380 kW for DG-3 while maintaining engine speed 5, 75% of the I

difference between nominal speed and the overspeed trip set-e point or 15% above nominal, whichever is less.

., v 3.

Verifying the diesel generator capability to reject a load of 4400 kW for DG-1 and DG-2 and 2600 kW for DG-3 without tripping.

The generator voltage shall not exceed 4784 volts during and following the load rejection.

WASHINGTON NUCLEAR - UNIT 2 3/4 8-4 Am.andment No. 19 9002160141 700202 gDR ADOCK0500g7

,