V A

General Offices

i uw t wi - -.. c=w.

mm wowmumn c P.O. box 270 NE'.U$nNUc1.""

HARTFORD, CONNECTICUT 06141-0270 k

S w w w aime u.

(203) 665 5000 t

February 8, 1990 MP-90-145

[

Re:

10CTR50.71 (a) i U.S. Nuclear Regulatory Comission Document Control Desk Washington, D.C.

20555

Reference:

Facility Operating License DPR-21 Docket No. 50-245

Dear' Sir:

In accordance with Millstone Unit 1 Technical Specification.6.9,1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

F One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY CO!GANY Tor:

Stephen E. Scace Director, Millstone Station By:

0,.hn P. Stet:

Millstone Unit 1 Director SES/GSN:dlr

Enclosures:

(4) cc:

W. T. Russell, Regional Administrator Region I M. Boyle, NRC Project Manager, Millstone Unit No. 1 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 L

e, 21 OC P

$_9 s4 gs up c

[

]

l l

y' l

AVERAGE DAILY UNIT POWER LEVEL L

DOCKET NO.

50-245 i

UNIT Millstone 1 c

f DATE 900201 i,

COMPLETE BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 l

MONTH January, 1990 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 662 17 662 t

2 662 18 525 3

661 19 661 4

646 20 661 5

661 21 662

_j 6

662 22 661

[

{

?

662 23 661 8

662 24 662 9

662 25 656 10 662 26 682 s

11 655 27 662 12 661 28 662 13 662=

29 662 14-662 30 662 15 662 31 662 16 662 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Computer to the nearest whole megawatt.

i

p f.

e 3. ' ;.

L' / '

OPERATING DATA REPORT h

DOCKET NO.

50-245 g

DATE 900201 j.

COMPLETED BY G. Newburch TELEPHONE (203) 447-1791 f.

Extension 4400 OPERATING ETATUS 1.

Unit Name: Millstone 1 Notes:

k 2.

Reporting Period: January, 1990 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate' Rating (Gross MWe):

662 F_

'5..

Design Electrical Rating (Net MWe): 660

=6' Maximum Dependable Capacity (Gross MWe): 684 17.,

Maximum Dependable Capacity (Net MWe): 654 8..

If Changes occur in Capacity Ratings (Items Number 3 Through 7)

Since-Last Report, Give Reasons: N/A 9.'

Power Level to which Restricted,11 Any (Net MWe):

NA/

l:

10.

Reasons For Restrictions, It Any:

N/A

11. ' Hours In Reporting Period 744 744 168,096 12.

Number Of Hours Reactor Was Critical 744 744 133,108.9 13.

Reactor, Reserve Shutdown Hours 0

0 3,283.3

14. -Hours Generator On-Line 744 744-129,820.8 15.'

Unit Reserve Shutdown Hours 0

0 93.7

' 16.. Gross Thermal Energy Generated (MWH) 1,483,573 1,483,573 242,881,110

17. - Gross Elec. Energy Generated (MWH) 514,600 514,600 81,936,696 18.

Net Electrical Energy Generated (MWii) 493,149 493,149 78,185,409 19.

Unit Service Factor 100 100 77.2 20.. Unit Availability Factor 100 100 77.3 21.

Unit Capacity Factor (Using MDC Nec) 101.4 701.4 71.1

22. Unit Capacity Factor (Using DER het) 100.4 100.4 70.5 23..

Unit Forced Outage Rate 0

0 10.2 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shutdown at End of Report Period, Estimated Date of Startup: N/A i

26.

Units in Test Status (Prior to commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION l

l l

w.

DOCKET NO. 50-245 UNIT NAME MILLSTONE 1 UNIT SHUTDOWNS AND FONER REDUCTIONS DATE 900201 COMPLETED BY G. Newburgh TELEPHONE j203).447-1791

~

REPORT MONTH January, 1990 Extension 4400 2

Method of Licensee System Component Cause & Corrective 5

Action to Shutting Event Code'

' Code No.

Date Type Duration Reason l

Prevent Recurrence (Hours) 3 Report f Down Reactor 90-01 900118 S

U B

5 N/A N/A N/A Fower reduction for surveillance testing and maintenance..

Exhibit G - Instructions 4

3 Method:

for Preparation of Data 2 Reason:

1-Manual Entry Sheets for Licensee IF: Forced A-Equipment Failure (Explain) 2-Manual Scram' Event Report (LER) File S: Scheduled B-Maintenance or Test 3-Automatic Scram-C-Refueling 4-Continued from (NUREG-0161)

D-Regulatory Restriction previous month E-Operator Training & License Examination 5-Fower Reduction 5 Exhibit 1 - Same Source F-Administrative (Duration = 0)

G-Operational Error (Explain) 6-Other (Explain)

H-Other (Explain) 9 e

4

pr -

y

)

}q..

3

+

e C b

t-REFUELING INFORMATION REQUEST l

.1.

Name of facility: Millstone 1 I

L" 2.

Scheduled date for next refueling shutdown:

February 1991-3.

Schedule.date for restart following refueling: March 1991-4.

Will refueling or. resumption of operation thereafter require a l

technica1' specification change or other license amendment?

l

-Yes,-Technicial Specification Changes Regarding:

(1) Maximum Average Planar Linear heat Generating Kate (2) Maximum Critical Power Katio

-i

-5.

Scheduled date(s).for subritting licensing action and supporting information:.

J Winter 1990-91 i

6.-

Important' licensing considerations associated with refueling, e.g., new-or.different fuel design or supplier, unreviewed design or performance.

analysis methods, significant changes in fuel design, new operating.

procedures:

196 GEBB Fuel Assembides 7.

The. number of fuel assemblies (a) in the core and (b) in the spent fuel i

storage pool::

(a)-

~In Core:

(a) 580 (b) 1928 N

8.-

The present. licensed spent fuel pool storage capacity and the size of i

any increase in licensed storage capacity that has been requested or is j

. planned, in number of fuel assemblies:

.j r

P' resent capacity, 3229 assemblies j

9..

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

i 1997,' Spent Fuel Pool, Full' Core Off Load Capability is Reached j

l f

n 7

V

?

^$

., -