Text
1 O. g'- l?;
FEB - 1 1990 -
. ;.=
In. Reply Refer To:
Dockets: 313/87-31 =
50-368/87-31.
~
' Arkansas; Power & Light Company ATTN:
Gene. Campbell, Vice President Nuclear Operations P.O. Box 551~
~ ittle Rock, Arkansas 72203 L
f
-Gentlemen:
1Thank you for your letter of December 1,1989, advising us of your requirement for extended time to complete the Perimeter Security Improvement Project. We have reviewed your letter and find your extension justifiable and acceptable.-
We will review the implementation of your Perimeter Security Improvement Project during future inspections to determine that full compliance has been-achieved and will be maintained.
Sincerely, Winni 81gned By Samuel J. Collins. Director Division of-Reactor Projects cc:
Arkansas Nuclear:0ne ATTN:. Early Ewing, General Manager Technical Support and Assessment P.O. Box 608 Russellville Arkansas-72801
{ Arkansas Nuclear One ATTN: Neil Carns, Director Nuclear Operations P.O. Box 608
'Russellville, Arkansas '72801 Combustion Engineering, Inc.
ATTN:. Charles B._Brinkman, Manager Washington Nuclear Operations
-12300 Twinbrook Parkway, Suite 330 Rockville,- Maryland 20852 RIV:SEPS C:SEPS DD:DRSS D:DRSS D
- RCaldwell/ch
- DAPowers
- LAYandell
- ABBeach S
ins
< /' /90
/ /90
/ /90
/ /90
\\
90 ok
- Previously concurred.
i (k
9002080240 900201 PDR ADOCK 05000313
.Q PDC
w.
{'Q $
HArkansas Power & Light Company Honorable Joe W. Phillips.
. County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 I~
. Bishop, Cook, Purcell & Reynolds ATTN: Nicho_las S. Reynolds, Esq.
1400 L Street, N.W.
P Washington, D.C.-
20005-3502 Arkansas _ Department of Health ATTN:- Ms_. Greta Dieus,-Director
. Division of Environmental Health Protection 4815 West Markam Street
'Little Rock, Arkansas-72201
- Babcock & Wilcox.
Nuclear Power Generation-Division ATTN: Mr. Robert-B. Borsum 1700 Rockville Pike, Suite-525 Rockville, Maryland 20852,
- U.S. Nuclear Regulatory Commission
-ATTN: Senior Resident Inspector
'l Nuclear Plant Road Russellville,-Arkansas 72801 U.S. Nuclear Regulatory Commission ATTN: -Regional Administrator, Region IV 611 Ryan'. Plaza Drive.. Suite 1000 Arlington, Texas 76011 bec.to DMB (IE-04) bec with nonsafeguards portion of licensee's letter:
Resident Inspector
'SEPS/FRPS File Section; Chief,.DRP/A LisaLShea,_RM/ALF RIV File DRP DRS'
-MIS-System RSTS Operator
~ Inspector Section Chief B. Beach Project Engineer,.DRP/A
- C. Harbuck, NRR Project Manager l
a
- N,
[
8 Arkenees Power & Ught Company -
AP8L
=r
=
L'.....
Little Rxk AR 7??03
'p J 1e! 5013771000 '
- )"
b! DEC-51989 yh 1
1k'i December 1, 1989 i -
q 8CAN128966-3 A. B. Beach, Director Division of Radiation Safety and Safeguards Region IV 611 Ryan Plaza Drive, Suite 1000
. Arlington, Texas-76011
SUBJECT:
- Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313/50-368 License Nos. DPR-51 and NPF-6 Perimeter Security Improve:nent Project
-Inspection Report 50-313/87-31; 50-368/87-31
Dear Mr. Beach:
Arkansas Nuclear One is currently implementing a Perimeter Security Improvement:
Project with a scheduled completion date of December 31, 1989.
In a letter dated-September 6, 1989 (8CAN998992), we notified Region IV that a significant increase to the scope of the project had been made to-accommodate extensive modifications to the central ~and secondary alarm stations (CAS/SAS).- The e
scope increase had been previously discussed with Messrs. Dale Powers and Jim Kelly of your ~ staff.
Initial estimates indicated that the addition of extensive CAS/SAS modifications-to the project would not impact the December 31st completion date.
This was based on receipt of the CAS/SAS consoles in October.
However, the consoles did not arrive on site until late November. Therefore, the CAS/SAS modifications
' re -now scheduled for completion by February 28, 1990, including the integrated a
testing of:the overall perimeter security system, which cannot be performed until installation of the CAS/SAS modification is complete.
Included in the perimeter project is the installation of-an intrusion detection system (IDS).
As a result of testing of the original design of the IDS, the design has been changed to a " stacked" system to provide better coverage and additional microwave units are being installed. These units have been ordered and are scheduled-for delivery late December 1989.
The new units are expected to be installed and included in the integrated testing of the overall project.
I l
rdi69 -69 6 _%CiL/,Q-t4O% eg
- Q.O i
.,, ' *1 i
'A.'B.
B30ch
-'Page 2 December 1, 1989
' Work on the remaining tasks of the perimeter project is continuing as planneo.
Twejty dhree of.the twenty-five new camera towers are installed
' with the remaining two towers scheduled for delivery in early December.
Installation of the cameras on the towers has begun. Work on the fence and isolation zone is nearing completion. With regard to the emergency cooling-pond, this task is currently being evaluated to determine the best means:
of resolution and will not be addressed as part of the perimeter security improvement project.
Overall, the project is approximately 91% complete.
The schedule extension to February 28, 1990, was required only due to the addition of extensive CAS/SAS modifications to the project and to-the change in the design of the intrusion detection system necessitated.by the results of testing the original design.
If you have any questions, please contact me.
Very truly yours fD-3 E. d. Ewing General Manager, Technical Support and Assessment ECE/J0J/sgw cc:
-U. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, D. C.
20555 I
-.-..-.--..-.-m