.s February 1,1990 For:

The Comissioners From:

James L. Blaha, Assistant for Operations. Office of the E00

Subject:

WEEKLY INFORMATION REPORT - WEEK ENDING JANUARY 26, 1990 A sumary of key events is included as a convenience to those Comissioners who may prefer a condensed version of this report.

Contents Enclosure Nuclear Reacter Regulation A

Nuclear Material Safety and Safeguards B

Nuclear Regulatory Research C

Analysis and Evaluation of Operational Data D

Governnental & Public Affairs E

General Counsel F*

Administration G

Information Resources Management H

Controller I*

Personnel J

Small & Disadvantaged Business Utilization & Civil Rights K*

Enforcement L

Consolidation M*

r N

Regional Offices Executive Director for Operations 0*

Items Addressed by the Comission P*

Meeting Notices Q

Proprietary or Other Sensitive Information (Not for R

externaldistribution)

  • No input this week.

M 9002080215 900201 mes L. Blaha, Assistant for Operations

$$q$f$yf.CC ffice of the Executive Director PDC for Operations

Contact:

James L. Blaha, OEDO f

492-1703 J '\\

i HIGHl.IGHTS OF WEEKLY INFORMATION REPORT WEEK ENDING JANUARY 26, 1990 TWRIE. NILE.lSL AND.llWIL 2 On January 19, 1990 theAtomicSafetyandLicensingAppealBoard(AStABP) issued ALAB-926 affirming the Licensing Board's February 2, 1989 decision.

The February 2 1989 decision authorized the disposal, by evaporation, i

ofthe2.3milliongallonsofaccidentgeneratedwaterstoredon-site.

The licensee is currently testing the evaporator with a surrogate solution.

The licensee is continuing to make modifications to the system based on the results of testing. Assuming a successful surrogate testing program the evaporator could be operational by March 1990.

l Wabra ska.LLW. Site RepresentativesofLLWMandOCAattendedatownmeetinginBonesteel,(SD,on Saturday, January 20, 1990, at the request of Senator Larry Pressler R-SD).

The NRC representatives were present as resource persons for the Senator to 1

answer questions related to the licensing process for low-level waste disposal facilities. There is increased interest in low-level waste issues in southern South Dakota because the Central States Compact has a site in northern Nebraska (within 5 miles of the South Dakota border) as its preferred low-level waste disposal facility.

C ou n c i l. o f. S ta te. G ov e rnme nt s.Mee t i ne The Council of State Governments Eastern Regional Conference held a joint meeting of the Environment Committee and the Energy and Public Utilities 24-26, 1990 inWashington,DC. The Eastern Regional Committee on January Conference included legislators and staff ' rom Connecticut, Delaware, The Hassachusetts, New Jersey, New York, Fennsylvania and Rhode Island.

joint meeting reviewed a variety of energy and environmental policy and legislative issues including the Clean Air Act, the Clean Water Act, global warming and the greenhouse effect, and automobile fuels of the There was a session on issues regarding LLW generation and future.

the Nuclear disposal with representatives from the Department of Energy,ing Information Resources Service and the New York State LLW $1t f

Commission. William Russell, Region ! Administrator, Sheldon Schwartz, Deputy Director of GPA, and Joseph Scinto, OGC, participated in a panel j

discussion on nuclear-related issues,

Office of Nuclear Reactor Regulation items of Interest Week Ending January 26, 1990 TURKEY p0lWT. UNITS.3 AWD.4 the Atomic Safety and Licensing Board issued an Order for 16, 1990,(dismissal) of the remaining contention in an intervention ON January Sumnary Disposition proceeding.

In December 1988 an intervenor, Joette Lorien, challenged a license amendment which approved a revision of the plant's tech specs (TS) concerning pressure / temperature limits. The TS change made the P/T limits applicable to 20 full power years (instead of 10 years in the previous TS). The intervenor's concern related to reactor vessel embrittlement, and this general area of concern has been brought before the NRC on arevious occasions since 1980 by this same intervenor, once progressing as hig1 as the U.S. Supreme Court while challenging the pressurized thermal shock issue.

Significant staff resources were expended preparing for a hearing scheduled for February 27, 1990; the hearing is now cancelled.

The intervenor has 10 days to file a notice of appeal. The order will stand unless it is appealed or unless the Commission reverses it within 45 days.

ARKANSAS.WUCLEAR.0WE-(ANO) UNITS.I.& 2 On January 15, 1990, the Arkansas Power and Light Company (AP&L) announced several organizational changes. These changes are being implemented to continue the improvements begun with last summer's major reorganization which included the assignment of unit specific operation and maintenance responsibilities.

Highlights of this latest reorganization are the assignment of maintenance and engineering support staff to each plant specific maintenance organization; the assignment of systems engineers, performance engineers, and reactor engineers to each unit's systems engineering group; the establishment of a new engineering standards program department and a new nuclear industry support group.

In addition, the shift technical advisor positions are being transferred to nuclear operations as shift engineers reporting to unit specific shift supervisors.

Along with the organizational changes, AP&L also announced a planned relocation of all Little Rock based nuclear operations, engineering and support personnel to the ANO site by the end of the sunner. About 170 employees will be affected.

THREE MILE lSLAND. UNIT.2 l

On January 19, 1990 the Atomic Safety and Licensing Appeal Board (ASLABP) issued ALAB-926 affirming the Licensing Board's February 2,1989 decision.

The February 2, 1989 decision authorized the disposal, by evaporation, of the 2.3 million gallons of accident generated water stored on-site.

l The licensee is currently testing the evaporator with a surrogate solution.

The licensee is continuing to make modifications to the system based on the results of testing. Assuming a successful surrogate testing program the evaporator could be operational by March 1990.

JANUARY 26, 1990 ENCLOSURE A I

INTERGOVERh' MENTAL. MEETING..!PRODLEN PARTS. AWD. SUPPLIERS.

As a result of NRC and NASA staff discussions held in September 1989, NASA's Director of the Division of Reliability, Maintainability, and Quality Assurance arranged an interagency meeting at a NASA contractor facility in Washington, D.C.

on January 19, 1990 to discuss the exchange of information regarding problem l

The meeting was attended b parts and suppliers among government agencies. technical and investigative repr NIST, NRC, GAO, and the G w ernment-Industry Data Exchange Program (GIDEP).

The Director, 01 and staff and the Chief, Vendor Inspection Inspection and staff attended the meeting. Each agency represented a brief description of its experiences with substandard / misrepresented parts and suppliers, its internal procedures and activities to disseminate the information among affected groups, and any external steps taken to inform other potentially affected federal agencies and/or industry organizations. The use of GIDEP as a vehicle for i

rapidly informing other groups was extensively discussed.

In the Fall of 1989, NRC became a member of GIDEP and now all NRC bulletins and information notices are made available to other member federal agencies through the GIDEP network. Although no final consensus was established, it was agreed that NASA Headquarters would convene a second meeting at the working group level in the near future with the aim of arriving at a mutually acceptable approach 1

for rapidly disseminating this type of information.

COMANCHE. PEAK.ORAT The Comanche Peak Operational Readiness Assessment Team began its two-week inspection on January 22, 1990. The inspection will provide an input and basis for an NRC determination of the applicant's readiness to load fuel and conduct power operations.

(

l JANUARY 26, 1990 ENCLOSURE A

l:

NTOL AND RESTART SCHE 0VLE 1/26/90 i

)

i 1.

Schedule for NTOL plants' INITIAL FULL i

PLANT LOW POWER CRITI-COMMISSION POWER AUTWORZIs CALITL BRLEFING..

AUTWORZTW CDMANCHE PEAK 1 2/90E 2/90E 3/90E 4/90E SEABROOK 5/26/89C 6/13/89C 1/18/900 2/90E 1

i i

l i

11. Schedule for RESTART plants:

COMMISSION NRC STATUS nESTART DLANT SEUTDOWN BRIEFLNG..

DECIS10N DLAET. RESTART BROWNS FERRY 2 9/15/84C 4/90E 5/90E 5/90E NINE MILE POINT 1 12/19/87C 3/90E 4/90E 4/90E I

JANUARY 26, 1990 ENCLOSURE A

i Office of Nuclear Material Safety and Safeguards i

Items of Interest Week Ending January 26, 1990 SAFEGUARDS International-kunning. Book. I n ve ntory-( RBI ). S r.ief ing On January 19, 1990, Messrs. E. R. Johnson, G. Hough and F. Tingey briefed i

three International Atomic Energy Agency (IAEA) staff at the Department of S

State on the results of Task I of the RBI contract. The IAEA's interest in this concept is based on its need to identify a reliable diversion detection technique that makes the most efficient use of limited inspection resources.

Discussions centered principally on model development, measurement verifica-

+

tion requirements and the sensitivity in terms of quantity and timeliness of identified. test statistics. The IAEA was advised of the Nucle 6r Regulatory Consnission's and contractor's plans for Task 2 including a concerted effort to obtain actual operating plant data for evaluation.

InternaticceL Atomic.Enercy. Agency. (I AEA). Inspection.at-the.GeneraLElectric EacLu ty On January 24 1990, an IAEA team initiated a short notice random inspection attheGeneralElectricFuelFabricationPlantinWilmington,NC. The team will audit the facility's ledger, measure fuel rods and weigh and sample uranium dioxide pellets.

Domestic Rev iew.of..Na ter ial. Control.and.A ccounti ng. (MC&A). Upgrade. tmplementation A special team of Safeguards staff and contractor personnel is reviewing the initial implementation of the new Part 74 MC&A requirements at United Nuclear Corporation, Uncasv111e, CT. This is a performance oriented rule designed to detect, in a timely manner, an abrupt loss of five or more formula kilograms of strategic spc:ial nuclear material from an input process. Similar reviews are scheduled for the other Category I facilities.

IWCUSTRIAL.AWD. MEDICAL.WUCLEAR SAFETY Eue1 Cycle. Safety

.BP. Chemicals Inc.

On January 23, 1990, representatives of BP Chemicals, Inc., met with NRC staff to discuss the planning of BP Chemicals for the continuation of the decontamination of equipment, grounds, and wastewater treatment ponds at their Lima, Ohio site.

BP Chemicals will submit its revised plans and schedules for the decontamination within a few months. The regulations on decommissioning funding assurance, due July 27, 1990, were also discussed.

JANUARY 26, 1990 ENCLOSURE B

2

/

J J

Combustion.Enginaarfoe...Wematite 1

On January 24,1990 Combustion Engineering, Inc., (CE) was issued an amendinent to Materials License No. SNM-33 authorizing enriched uranium processing in two l

new pelletizing lines. CE had initially been authorized on November'25, 1989 to move enriched material into the portion of the facility which housed the two new lines. CE expects to initiate operations immediately.

LOW. LEVEL WASTE.NANAGEMEVT.

)

N RC / DOI. W e mo randum.s f-. U n ders ta n d i os t

On January 18, 1990, LLWM staff met with DOE in Albuquerque, NM, to discuss the memorandumofunderstanding(MOU)fortheUraniumMillTailingsRemedialAction (UMTRA) project. The current MOV was signed in March 1987.

In September 1988, NRC and DOE reached agreement to streamline the NRC review process leaning to concurrences required by the Uranium Mill Tailings Radiation Control Act (UMTRCA).

During the meeting, discussions were held relative to changes to the MOU to incorporate the streamlining agreements and other changes in the program since the last MOV was signed. DOE agreed to prepare a marked-up version of the MOV for NRC review by February 2,1990.

Wsbraska.LLW. Site Representatives of LLWM and OCA attended a town meeting in Bonesteel, SD, on Saturday, January 20, 1990, at the request of Senator Larry Pressler (R-SD).

The NRC representat.ives were present as resource persons for the Senator to answer questions related to the licensing process.for low-level waste disposal facilities. There is increased interest in low-level waste issues in southern South Dakota because the Central States Compact has a site in northern Nebraska (within 5 miles of the South Dakota border) as its preferred low-level waste disposal facility.

F T

l l

JANUARY 26, 1990 ENCLOSURE B

i

.l Office of Nuclear Regulatory Research Items of Interest i

Week Ending January 26, 1990 NRC.Special.Comittee.to. Review.the. Severe. Accident Risk. Report j

The NRC Special Comittee to Review the Severe Accident Risk Report met on January 18 and 19,1990 in Bethesda. The Committee received additional

~

technical briefings by NRC, Sandia and Brookhaven National Labcratory personnel on selected topics relating to the NUREG-1150 report.

At the conclusion of these presentations, the Comittee agreed on an outline and content for the Committee's final report and made assignments for draf ting sections of that report. The next meeting of the Comittee will be March 8-9 at which time the Comittee will review and edit the working drafts prepared by the members.

The Comittee discussed some generalized observations regarding the 1150 report.

In general, the Comittee felt that the report was a highly valuable i

study, it illuminated the present state of PRA and includes new and powerful methods, notably the expert elicitation process and the latin hypercube statistical sampling method. The Comittee noted a number of areas which they believed were weak, mainly in the area of human reliability and sensitivity 4

analyses.

l l

l 1

JANUARY 26, 1990 ENCLOSURE C

. _. _ _ l l

Office for Analysis and Evaluation of Operational Data Items of Interest Week Ending January 26, 1990 Division.of. Operational. Assessment.(DOA)

On January 23, in response to a notification by the Atomic Control Board of Canada regarding an event that occurred during an on-line refueling operation at the Bruce Generating Station-A, the NRC Incident Response Center notified

]

NRC management and other federal agencies and then monitored the progress of the event until its conclusion on January 24.

]

On January 24 the AEOD Director, Regional Administrator, Region V, the Associate Director for Reactor Projects, NRR, Palo Verde DET Manager and Deputy, and other NRC staff met at the NRC's Region V office with the President and Chief Executive Officer, Arizona Public Service Company, the Executive Vice President, Nuclear, and several of the top managers responsible for the facility. At this meeting the NRC provided the preifminary results of the Diagnostic Evaluation.

On January 19, TTC staff met with personnel from NRR/R$1B at the TTC to discuss the course outline, course instructors and course materials for a 3-day course for Electrical Distribution System Functional Inspection (EDSFI) inspectors.

i The TTC will support NRR through its Specialized Technical Training Task Order Contract with tie first of two courses planned for July / August 1990.

On January 22-25, the TTC staff conducted special simulator training for RES personnel with responsibilities in the severe accident management area. This training involved demonstrations of significant events and the associated mitigation efforts through the use of symptom-based emergency operating procedures (EOPs). The training was conducted on the NRC controlled simulators at the TTC which model the General Electric and Westinghouse reactor vendor designs.

On January 22-26, the first Internal Dosimetry /Whole Body Counting Course (H-312) was conducted 6t the TTC. Attendees included personnel from each of the regions and the states of California and North Dakota. The course was conducted by Roy F. Weston, Inc., under the TTC radiation protection task order contract.

Course instructors included Dr. John Poston, a leading expert on internal dosimetry. The course also included a field trip to the Tennessee Valley Authority Power Operations Training Center whole body counting facilities for equipment demonstrations.

l Division.of Safety.Proerass-(DS4 l

George Lanik, Chief, Reactor Systems Section, CE & GE, Reactor Operations Analysis Branch is participating in an IAEA workshop near Vera Cruz, Mexico on

" Technical Support of Safe Operation of Nuclear Power Plants." He has several hours presentation about recent AEOD studies and operating events of U.S.

boiling water reactors.

t JANUARY 26, 1990 ENCLOSURE D

L,e -

i Preliminary Jotification The following Preliminary Notifications were issued during the past week.

a.

PNO-I-90-05A, Monongahela Valley Hospital (Docket No. 030-07854),

i i

Malfunction of Source Transfer Tube in a Remote Afterloading Brachytherapy Irradiator(RABI)-Update.

b.

PHO-1-90-06, Titusville Hospital, Contamination Incident Involvement

)

Technetium-99m Pertechnetate.

i PNO-II-90-08 Duke University Medical Center (Agreement State Licensee),

c.

1 Contamination Involving SURFUR-35.

I d.

PNO-II-90-10, Georgia Power Company (Hatch Unit 1), Worker Personnel Contaminations, e.

PNO-IV-90-03, Irigaray In-situ Uranium Mine (Docket 40-8502), Suspension of Operations.

f.

PNO-IV-90-04,LouisianaPower&Lightcompany(Waterford3), Extended Plant Shutdown for Corrective Maintenance.

g.

PNO-IV-90-05, Sequoyah Fuels Corporation, Kotification of Contamination Event.

h.

PNO-Y-90-03, Pacific Gas & Electric Company (Docket No. 50-133),

Earthquake 45 Miles Southwest of facility.

1.

PNO-V-90-04,SanOnofreNuclearGeneratingStation(IrvineOperations Center), Spurious Emergency Siren Activation.

4 JANUARY 26, 1990 ENCLOSURE D

p e

}

Office of Governmental and Public Affairs 7

Items of Interest Week Ending January 26, 1990 l

8 State. Programs CRCPD. Executive.Soard. Meeting Carlton Kammerer. Director, State Programs, participated in the Conference of Radiation Control Program Directors, Inc. (CRCPD) Executive Board meeting on January 22-26, 1990 in Phoenix, Arizona. The Executive I

Board discussed pending CRCPD policy issues, planned future activities i

and conducted other routine business.

LLW.Eorum.Nett1as The Low-Level Radioactive Waste Forum held its quarterly meeting on January 24-26, 1990 in San Francisco, California. Participants included Chairman Carr, M. Federline (OCM/KC), J. Greeves and L. Camper (NMSS).

F. Combs and S. Salomon (GPA), and D. Kunihiro (Region V). Discussions focused on a draft report on significant policy and institutional problems in LLW site development and reports on State and Compact progress. The NRC, DOE and the three sited States gave a 1990 milestone t

(Governors' certifications) compliance report. The sited States' representatives indicated that the Governing Board of the South Carolina De)artment of Health and Environmental Control is scheduled tr meet on t

Fearuary 1,1990 in Columbia, South Carolina to determine State compliance with the milestone and that the Nevada and Washington i

determinations would be made at the staff level.

Other discussions covered uniform manifest, mixed waste coordination, waste characterization / source term, performance assessment, automated pricing schedule computer models, LLW disposal fees, LLW policy and legislative developments, site characterization updates by California, t

Texas Illinois and Nebraska, and State experiences on public participation.

Council.of State. Governments.Meetine The Council of State Governments Eastern Regional Conference held a joint i

meeting of the Environment Committee and the Energy and Public Utilities l

Committee on January 24-26, 1990 in Washington, DC. The Eastern Regional l

Conference included legislators and staff from Connecticut, Delaware, Massachusetts, New Jersey, New York, Pennsylvania and Rhode Island. The joint meeting reviewed a variety of energy and environmental policy and 1egislative issues including the Clean Air Act, the Clean Water Act, l

global warming and the greenhouse effect, and automobile fuels of the t

l future. There was a session on issues regarding LLW generation and l

l disposal with representatives from the Department of Energy, the Nuclear

~

Information Resources Service and the New York State LLW Siting Commission. William Russell, Region I Administrator, Sheldon Schwartz, l

JANUARY 26, 1990 ENCLOSURE E

i 2

Deputy Director of GPA, and Joseph Scinto, OGC, participated in a panel J

discussion on nuclear-related issues.

International. Programs Emeroency-Communications with. Canada The January 23 incident at the Bruce nuclear power plant in Ontario, Canada provided NRC and the AECB an opportunity to test their communications linkage. This incident, the planned Fermi emergency exercise, and trip to Canada by G. Zech, AE00, and W. Upshaw, IP, to discuss emergency communication should help assure effective cooperation between the two agencies in the event of future incidents or accidents i

near the U.S.. Canada border.

)

IAEA. Assignment Dr. Michael Bell, NKSS, has accepted a three-year assignment in the Waste 1

Management Section of the Division of Nuclear Fuel Cycle at the International Atomic Energy Agency. Dr. Bell will leave NRC January 26 i

to 90 to Vienna.

i i

i l

r j

l l

t i

JANUARY 26, 1990 ENCLOSURE E l-

.o CONGRESSIONAL AFFAIRS

-~m CONGRESSIONAL HEARINGS SCHEDULE (CA) c.

E OCA ASSIGNMENT DATE TIME WITNESS SUBJECT ColetITTEE ro Madden 01/31/90 10:00 Markup H.R., 3520, Hazardous Reps. Luken/Whittaker

?

Materials Transp Act Transp & Har Materials House Energy & Commerce

  • w Gerke 02/06/90 9:30 Non-NRC Promoting EPA to Senators Glenn/Roth Cabinet level Senate Governmental Affairs Madden 02/08/90 9:45 Commission NRC's FY91 Authori-Reps. Udall/Hansen zation Subc on Energy & the Environment House Interior & Insular Affairs Con 6s 02/22/90 9:30 Sec. Watkins DOE's Civilian Nuclear Senators Johnston/McClure Waste Program Senate Energy & Natural Resources Gerke 02/21/90 9:30 Non-NRC S. 1742, Paperwork Senators Glenn/Roth 02/22/90 Reduction Act Senate Governmental Affairs Gerke 02/27/90 TBA Mon-NRC Equal Opportunity Civil Service (Sikorski/Morella)

J Complaint Pro-House Post Otfc & Civil Service cessing Esp 1 Opportunities (Martinez /Gunderson)

House Education & Labor Combs 03/08/90 9:30 Non-NRC DOE's Plan to Open Senators Johnston/McClure WIPP Senate Energy & Natural Resources I

Combs 03/08/90 10:00 Mon-NRC DOE's Muclear Waste, Reps. Bevill/Myers Uranium Enrichment Energy & Water Development l

Appropriations FY91 House Appropriations m Madden 03/21/90 10:00 Commission NRC's FY91 Budget Reps. Bevill/Myers M

Subc on Energy & Water Development G

House Appropriations C

s m

t i

m

I 4

Office of Administration Items of Interest Week Ending January 26, 1990 Ejentficant.E01A.Recuests Received.by.the.WRC.for.5 day. Period Ja nuary.19.. 25.1990 Request for copies of the three most recent OIG semiannual reports and a list of all audit and investigative reports completed in FY 1989 and to date in FY 90. (John King, Associated Press, F0!A-90-26)

Request for copies of two categories of records related to Radiation Sterilizers, Decatur, Georgia. (Linda Gilbert of Akin, Gump. Strauss, Hauer &

Feld,FOIA-90-29)

Request for two categories of records regarding the Nine Mile Point nuclear power plant. (Steven Sholly, MHB Techni:41 Associates,F01A-90-30)

Request for all OE records since January 18, 1989 under the title or topic of

" Enforcement Guidance Memorandum." (Karer Unnerstall of Newman & Holtzinger, P.C.,FOIA-90-34)

Request for records regarding radiation surveys done in Attleboro and Norton, Massachusetts, and records containing information on all potential responsible parties.

(JohnCalhoun,TheTravelersCompanies,FOIA-90-35)

Request for records related to the Conoco Conquista Project near Falls City.

Texas. (Karen Van Tuyle, Conoco Inc., F01A-90-36)

JANUARY 26, 1990 ENCLOSURE G

r Office of Information Resources Management Items of Interest Week Ending January 26, 1990 1.

Implementation.of NUDOCS/AD j

IRM has initiated actions in response to NUDOCS users expressing concern about slowness of response time in NUDOCS/AD. The NUDOCS contractor is leasing, on an interim basis, a Data General MV/20000 minicomputer. The computer was delivered on Friday, January 19 and was operating by Tuesday, January 23. The replacement computer has greater processing capacity and has improved the respnse time by a factor of four. Further system hardware improvements are planned for the week ending January 26 that will again increase the processing capacity and improve response time.

The leasing of the MV/20000 is a temporary measure, until NRC can complete the acquisition of the Data General MV/40000 that NUDOCS/AD was designed to operate in.

2.

Decomissioning A Decomissioning File has been created, entitled, " License Terminated /Decomissioned," to be included as part of each official case file. Documents to be filed in this category include all incoming and outgoing correspondence and internal memoranda concerning license termination, cancelled applications, withdrawn applications and decomissioning information.

3.

Event. Notification.Searth..acd. Reporting. System The parallel processing period ended successfully and the Data General minicomputer has been removed from the NRC Operations Center. AEOD, NRR, and the Regions are now actively using SINET to retrieve 50.72 information.

4.

FIS 2000. Network The Telecommunications Branch accepted the FTS 2000 network after successful transition of White Flint and Nicholson Lane Buildings on January 24, 1990.

JANUARY 26, 1990 ENCLOSURE H

I t

Office of Personnel Items of Interest Week Ending January 26, 1990 Recruitment. Efforts Steve Ruffin, NMSS was joined by Lynne Broadwater and Lynn Kolonowski of Region I at the National Society of Black Engineers (NSBE) Job Fair at Stanford University on January 20. Janet Burke, OP, traveled to an i

engineering job fair held at the University of Florida on January 23.

Fiona Solander, OP, represented NRC at an NSBE Job Fair at Georgia Tech on January 25.

PRA. Principles Being Iscorporated.into.ITC. Courses Pete Goldman, Patricia Rathbun, and Lillian van Santen, OP, met with Ken Raglin, Director, Technical Training Center, other TTC staff, and INEL officials to determine the specific needs of TTC instructors as they begin to incorporate PRA principles into the courses taught at the TTC.

Arrivals Gary Armstrong, Audio-visual Production Specialist (PFT), ADM KentWalker,Sr.CriminalInvestigator(PFT),IG NicholeHill,EngineeringAide(Co-o)(OPFT),NMSS EdwinPiner,EngineeringAide(Co-op (OPFT),NMSS Brian Smith, Engineering Aide (Co-op (OPFT),NMSS Tanya James, Secretary (PFT), OGC Kathryn Winsberg, Sr. Attorney (PFT), OGC Allen Hiser, Materials Engineer (PFT), RES RobertaBabbitt,On-LineServiceCoordinator(PFT),SECY DanaZaring,OfficeResidentAssistant(OPFT),RII Departures John Kronebusch, Records Management Specialist (PFT) SECY LindaContos-Canlezo,iceResidentAssistant(OPFT),RII Deborah A. Adams Off PersonnelAssistant(OPFT),RV JANUARY 26, 1990 ENCLOSURE J

l i

i Office of Enforcement Items of Interest Week Ending January 26,1990 Significant Enforcement Actions A Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $75,000 was issued on January 22, 1990 to Arkansas Power and Light Company (ANO Unit 1). The action was based on the miswiring of the control circMtry l

for two of the three service water pumps for Unit 1.

Under certain conditions following an automatic reactor trip, this problem would have prevented the automatic restart of the pumps. The escalation and mitigation factors of the Enforcenent Policy were considered and in this case the civil penalty was increased by 50%. The licensee's corrective actions warranted 50% mitigation but this was offset by 50% escalation for prior poor performance and escalation for an additional 50% for NRC identification.

(EN90-005)

A Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $25 22, 1990 to GPU Nuclear Corporation (Oyster Creek),000 was issued on JanuaryThe action was based on the licensee's failure to tak action for a misa11gned DC control power breaker des)ite the fact that the condition was identified by plant personnel on a num)er of occasions. The i

escalation and mitigation f actors of the Enforcement Policy were considered and the civil penalty in this case has been mitigated 50% in recognition of the licensee's comprehensive corrective actions to improve the plant's corrective action program.

(EN90-006)

A Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $50,000 was issued on January 24, 1990 to Washington Public Power Supply L

System (WNP-2). The action was based on violations of the equipment l

qualification requirements of 10 CFR 50.49 (EN90-007)

Correction 1

In the Weekly dated January 24, 1990 it was stated that Veterans Administration Medical Center, Brooklyn, New York paid the civil penalty in the amount of

$8,750. That is incorrect. They responded to the Notice of Violation and Proposed Imposition of Civil Penalty.

(EN89-107) i JANUARY 26, 1990 ENCLOSURE L

4 Region I Items of Interest Week Ending January 26,1990 1.

Wononsabela. Valley.Wespital I

On January 17 1990 Monongahela Valley Hospital informed Region I of a malfunctionofarem,oteafterloadingbrachytherapyirradiator,adevice that uses sealed radioactive sources to treat tumors. The device, a Curietron 2E1000, was manufactured by CIS-U.S., a French-owned company.

The malfunction resulted in the disconnection of the tube used to transfer thesources(inthisinstance, cesium-137)fromtheshieldedstorageunit to the patient while the patient was undergoing treatment of a uterine 1

I tumor. The disconnect resulted in one of the cesium-137 sources being located for an undetermined time near the upper part of the patient's leg, rather than in the patient. The licensee has estimated a range of j

potential unintended dose to the patient's leg from 23 rads to 23 700 rads,dependingonthelengthoftheexposureandtheproximityofthe J

source to the patient's leg. However, three physical examinations of the patient have indicated no visible signs of radiation damage to date.

Additional future examinations of the patient will be performed. The licensee subsequently reported two additional equipment problems with this device on January 18, but neither incident resulted in further unintended radiation exposures. The device has been removed from service pending evaluation by the manufacturer and the NRC. Region I dispatched two inspectors to the facility and notified the only other user of this j

cevice in the U.S. of the malfunctions at Monongahela Valley Hospital.

Region I is evaluating potential generic implications of this incident.

2.

Medical. Canter.Wospital.of Varmont On January 17, 1990 a representative of the licensee informed Region I of the inadvertent activation of an AECL Theratron 780 teletherapy device containing a radioactive sealed source of cobalt-60 of approximately 3600 curies. The teletherapy source is used in the treatment of cancer patients by external beam. A patient was positioned under the teletherapy device for treatment and the technologist was setting the timer. The licensee stated that it appears that an electrical static discharge caused f

the treatment time value set on the timer to disappear. At the same time, l

the telethera]y source was achated to the unshielded position. The tech-nologist quiccly operated the emergency stop controls to prevent further exposure to the patient. The calculated dose was included in the l

patient's subsequently administered treatment. No unwarranted exposure to i

the aatient occurred. The licensee reported that similar static i

i disc 1arges had been noted over the past two years, but that this was the first time the source was actuated to the unshielded position.

l-NRC Region dispatched two inspectors to review the event with the licensee L

and manufacturer's representatives. A confirmatory action letter was JANUARY 26, 1990 ENCLOSURE N

l t

issued to assure patient treatments can be conducted safely pending i

identification and resolution of the problem.

Region I is evaluating potential generic implications of this incident.

- 3.

Seabrook On Wednesday,1/24/90, a subpoena was served by the NRC on Mr. Fred Anderson, Jr., President, Ideas and Information, Inc., Exeter, New Hampshire. The subpoena calls for Mr. Anderson to provide, by 1/30/90, tapes or copies of tapes he made of Seabrook control room radio transmissions to plant personnel throughout 1989 and in January 1990.

l About 200 voice activated recording tapes of 90 minutes duration each are reportedly involved. Mr. Anderson has stated that he will comply with the l

su)poena.

4.

Pilgrim. Salt Service.WaterJuss CoJuan.Ianure On January 11 a deep draf t service water pump column assembly fractured when one end of it fell six to twelve inches into a concrete floor as it was being transported horizontally between buildings. The 43 foot long column fractured 360 degrees around the circumference in a brittle manner.

Subsequent testing revealed severely degraded tensile strengths and r

ductility in areas of the column sections. Boston Edison Company is performing additional analyses and materials testing to address operability of the four pumps in service. Preliminary evaluation indicate that the poor material properties are the result of problems in the original casting process. Boston Edison Company has issued an information report over INPO's Nuclear Network and the NRC staff is preparing a generic communication on the subject.

l 1

t l

JANUARY 26, 1990 ENCLOSURE N

w o

^

i Region II Items of Interest Week Ending January 26, 1990 i

1.

Elorida. Dower and. Licht. Company j

On January 22 and 23, Comissioner Curtiss, accompanied by the Deputy Regional Administrator, toured the Turkey Point and St. Lucie sites.

1 2.

Senior. Management.Meettas On January 21 - 24, the Regional Administrator was in Walnut Creek, California participating the Senior Management Meeting.

j 3.

Florida. Power.Iorporation On January 24, Commissioner Curtiss, accompanied by the Deputy Regional Administrator, toured the Crystal River site.

4 Enforcement.Confersuces On January 23, Enforcement Conferences were conducted at St. Mary's i

Hospital in.Norton, Virginia, and at Russell County Medical Center in Lebanon, Virginia involving intentional misadministration of diagnostic raciopharmeceuticals and falsification of records issued in a May 25, 1988, investigation report.

3 On January 24, an Enforcement Conference was conducted at the Humane l

Hospital, Greenbriar Valley in Ronceverte West Virginia involving the accuracy of qualification, training and experience data submitted to the NRC issued in a July 24, 1987, investigation report.

l S.

S o u th e a s te rn. U t i l i ti e s. Eme r e e n cy. M a nn insJ rous

~

On January 25, the Southeastern Utilities Emergency Planning Group con-vened its Winter Quarterly meeting in Orlando, Florida. The Regional 2

Emergency Response Coordinator participated in a roundtable discussion on January 26 regarding current issues in Emergency Preparedness which were i.

of interest to utility emergency planners, l'

6.

C a ro l im a. P owe r-a nd. L i c h t. C ompa ny On January 26, representatives of the Carolina Power & Light Company were in the Region II Office to present a self-assessment of their performance at the H. 8. Robinson facility.

7.

Georeta. Power. company On January 23, 1990, high airborne radioactivity levels were discovered on the Plant Hatch refueling floor. At the time, operations were in progress to prepare for a refueling outage scheduled to start in February. Nine-teen persons were identified as having low-level external contamination, JANUARY 26, 1990 ENCLOSURE N

ZA /

p-f,9!'

.g e

primarily on the hands and feet. The utility is continuing to monitor for any evidence of potential internal cott.anination. The release was limited to an in-plant radioactivity event, and the licensee is evaluating the occurrence.

. 8.

St..Lucie.Esereencwixercise On January 24, Florida Power and Light Company conducted a partial partici-t potion emergency exercise at the St. Lucie Nuclear Power Plant. 'The exercise was observed by. a team lead by Region Il that included Regional, henoquarters, and contractor team members. The exercise was successful, with no exercise weaknesses identified. There was local media interest and news coverage of the exercise and the results.

1

-l JANUARY 26,.1990 ENCLOSURE N f

[i

=

Region III Items of Interest Week Ending January 26, 1990 l

1.

AmerJean.Jtadiolabeled. Chemical American Radiolabeled Chemicals is a firm located in St. Louis, Missouri, that manufactures a broad variety of research chemicals tagged with radionuclides. On January 11, 1990, an Order Suspending Licensed Activities was issued to the licensee based on radiological safety issues and apparent willful violations. The licensee requested a management meeting with Region III staff to discuss conditions necessary to return the arogram to operation. This meeting was to be held on January 25, 1990, but 1as been postponed pending the completion of Region III's inspection report and discussion of pending NRC enforcement action with other federal agencies.

2.

Zion. Nuclear. Power Station On January 16, 1990, the 1A turbine-driven auxiliary feedwater pump (AFWP) was stopped during testing after running and cavitating for one minute. It was determined that the pump's discharge and recirculation valves were shut due to an inadequate procedure. Approximately one minute later the 1C motor-driven AFWP tripped due to low suction pressure caused by steam from the sc M tating 1A pump that entered the common suction header. This placed the unit in an 8-hour LCO.- The unit was in Mode 7,

. physics testing, at the time. The IC AFWP was vented, tested and returned to service on January 17, 1990. Unit I went into a 7-day LCO because the 1A AFWP was out of service. The 1A AFWP was taken apart and the seals replaced. The pump was returned to service January 23rd. During the return to service procedure a valve lineup error was made which was discovered later that day during testing of the IB motor-driven AFWP.

This error would have resulted in the IB pump delivering auxiliary feedwater to only two steam generators.

3.

Davis Besse. Unit.1

-On January 18, 1990, enforcement discretion was granted to Toledo Edison Company to operate the unit with one parameter (flux-delta flux-flow) of the Channel 2 Reactor. Protection System RPS) not fully operable and not tripped. Technical Specifications ( S) 3.3.1.1 require an inoperable channel to be placed in the tripped condition, thus placing the plant RPS logic in a one-out-of-three logic. The relief was granted to avoid subjecting the plant to an unnecessary plant trip should any one of the eight parameters in any of the other three RPS channels experience a spurious trip.

In addition, it was also recognized that while the flux-delta-flux-flow parameter was inoperable, it could still perform its intended function but approximately 0.07% full reactor power above the required trip setpoint limit. The licensee has stated that should any other component in the flux-delta flux-flow logic in Channels 1, 3 or 4 degrade beyond its TS limit, they would follow the appropriate actions of TS 3.0.3.

The relief is to remain in effect until the commencement of the sixth refueling outage scheduled for February 1, 1990.

JANUARY 26, 1990 ENCLOSURE N

~.,

4

+.

f Region IV Items of Interest Week Ending January 26, 1990-1.

B&H Wireline Services. Enforcement. Conference An enforcement conference will be held January 26, 1990, with Region IV l

management and B&H Wireline Services to discuss weaknesses in management of the radiation safety program which contributed to a significant number of violations identified during a recent inspection.

2.

Gulf States. Utilities Meetion TheSeniorVicePresidentofGulfStatesUtilities(GSU)andmembersof his staff will be in the Region IV office today, at the request of GSU, to discuss initiatives implemented at River Bend Station to reduce

-radiation exposure rates.

l!

i L-l.

JANUARY 26, 1990 ENCLOSURE N a

w

i Region V Items of Interest Week Ending January 26, 1990 1.

Senior.Nanagement.Neeting Region V hosted the Senior Management meeting from January 21-23, 1990.

Chairman C6rr, the EDO, Office Directors and Regional Administrators met in the regional office for two and a half days. The primary focus of the meeting was discussion of problem plants.

2.

Rancho.Seco. Nuclear Generating. Stat. ion The unit completed defueling in early December 1989. Major activities now in progress-include the placement of systems and equipment in a layup condition, continuing efforts to locate a small leak (1 gpm maximum)_ in the spent fuel pool, preparation of a submittal for request for 6

possession only license, and preparation for submittal of their decommissioning plan. The licensee has submitted to the NRC a number of license amendment requests and exemption requests in support of the closure of the facility. The submittals include:

a license amendment which would prohibit movement of fuel into the Reactor Building without NRC approval; a license amendment which adds specific defueled technical specifications; an exemption request for relief from the requirement to have a site specific simulator.(the licensee has stopped all work on their simulatorproject);

a request for significant relief in the areas of their Physical Security Plan, Emergency Plan, and Training Program. The licensee intends to allow INP0 accreditation of their training programs to lapse; and

[

a request for relief from the requirements of 10 CFR 50, Appendix J, l

containment Leak Rate Testing.

l The above items are under review by NRR. The staffing at the site stands L

at approximately 611, including the contract security force, down from L

-1650 when the unit was operating.

l The SMUD Board of Directors are considering whether the SMUD staff should l

close the plant or whether the work should be contracted out. A decision is expected soon on this issue. ~According to local press reports, the SMUD Board may also consider replacing the SMUD General Manager, Dave Boggs. This report follows the recent election of Ed Smeloff as Board President. Mr. Smeloff has been described by the media as " Anti Rancho Seco" and was a driving force in the election which resulted in tho L

JANUARY 26, 1990 ENCLOSURE N

l Y

plant shutdown. The media has also reported that the SMUD Board feels that the NRC is inappropriately requiring activities to be performed at the site, considering the status of the plant. Representative Vic Fazio (D-West Sacramento) visited the site on January 18, 1990. According to j

media reports, Representative Fazio stated his intentions to sensitize the NRC to the Rancho Seco situation. The NRC staff has previously reminded 1

the licensee that all applicable rules and regulations remain in effect until their license is amended.

3.

Chairman Carr.!s. Tour a.

Chairman Carr visited the Trojan Nuclear Power Plant on January 23, 1990. The visit included discussion's with Corporate and Plant management officials regarding plant performance and a tour of the j

facility.

b.

On January 24, 1990, Chairman Carr visited Children's Hospital:of San.

Francisco to discuss the proposed change to 10 CFR Part 35 to include a basic Quality Assurance (QA) Program. A discussion was held with

-Dr. Hirsch Handmaker and the Chairman toured the Hospital facilities.

Dr. Handmaker was a major contributor to the QA manual developed by the Joint Commission on the Accreditation of Hospitals. Ed Bailey from the' State of California and Bob Pate from NRC Region V were at the meeting.

4.

Arizona Nuclear. Power. Project On January 23, 1990, the Palo Verde AEOD Diagnostics Team held its exit meeting with APS and Region V at the Region V office. AE0D stated that the team inspection report would be issued by mid-February. AEOD l

discussed the team findings. APS stated that its corrective actions were already in progress, 1

P JANUARY 26, 1990 ENCLOSURE N

.s NRR MEETING 50TICES January 26, 1910 EU APPLICANT /

E DATE/ TIME NUMBER LOCATION PURPOSE-AITEMDEFt NRR.CONTACI 1/29-30/90 50-275/

Room 250 Review and discuss geophysical NRC/PG&E H. Rood 8:30-5:00 323 One California St.

data and interpretatians along San Francisco with Hosgri Fault Zone, Diablo Canyon Long Term Seismic Program.

i 1/30/90 50-331 White Flint Bldg.

Discuss engineering priorities NRC/ Iowa J. Hall 8:30-12:00 Room 14B-13 at the Duane Arnold Energy Center Electric followed by a general meeting Light &

to discuss licensee actions on Power Co.

the following items: IE/GE task force on HPCI improvements, river water silting and plans for coping with decreased river flows.

1/30/90 50-275 White Flint Bldg.

Discuss potential tech spec change NRC/PG&E

. H. Rood 1:30 323 Room 8B-11 allowing one. pressurizer safety valve to be gagged during operation.

1/30/90 White Flint Bldg.

To provide an interface for NRC/CEOG J. Partlow 1:30-4:30 Room 14B-11 NRR Management and lead technical reviewers with their C-E Owners Group (CE0G) counter-parts in order to review the status of important safety and technical issues which require mz P

NRC technical review.

8 E

]

  • Copies of sumaries of these meetings-will be made publicly available and placed in the respective docket file (s) in the NRC.and local public document i

rooms.

A listing of these meeting notices can be obtained by calling 492-7424.-

~v

+

'm-*-

a

-- -w~---

-m~

~-t_on.,-

~--es u

x

-_w-ca,w

--or--

...n,'-

^

.. r.

gn

'E~

-MER MEETING.MOTICES

~ 2=

January 26, 1990 2

ig APPLICANT /

8 DATE/IIME EUMBER LOCATION PURPOSE ATTENDEES MER CONTACT. -

1/31/90 White Flint Bldg.

Discuss Safety Valve Design NRC/B&W R. Jones 9:00-11:00 Room 10B-13 used in French Nuclear Plants.

1/31/90 White Flint Bldg.

Discuss the status of licensing NRC/SCE&G J. Hayes 9:00-11:00 Room 14B-9 issues for V.C. Sunener Nuclear Station.

1/31/90 White Flint Bldg.

To provide an interface for NRC/CEOG J. Partlow-9:00-12:00 Room 6B-11 NRR Management and lead technical reviewers with their C-E Owners Group (CEOG) counterparts in order to review the status of important safety and technical issues which require NRC technical review.

2/1/90 50-395 White Flint Bldg.

Discuss the relocation of the NRC/SCE&G J. Hayes 11:00-230 Room 14B-9 Emergency Operating Facility V. C.. Summer Nuckar Station.

2/8/90 50-269/

Hatch Nuclear Plant Discuss the status of various NRC/GPCo L. Wiens

'i l

8:30-4:00 270 licensing activies and safety Duke Power Co.

l initiatives at Duke Power Company's and Georgia Power l 9 Company's nuclear stations l P

. included in PDII-3 area of l S?

responsibility.

l !5 2/8/90 White Flint Bldg.

Discuss the results of recent NRC/ Northeast

.G. Vissing 10:00-3:00 Room 14B-13 steam generator tube inspection-for Millstone Unit 2.

L

..m,

'o a

f NER MEETING. NOTICES M

January 26, 1990 M

APPLICANT /

E DATE/ TIME NUMBER LOCATION RURROSE-ATTENDEES NRR.CORITACI 2/14/90 White Flint Bldg.

Discuss the following items (1)

NRC/GE

'G. Thomas 9:30-12:00 Room 8B-11 results of strategies with and without water level lowered to top of active fuel; (2) effects of power / flow / level oscillations on operator actions and fuel integrity; (3) pros and cons 'of l-revised heat capacity temperature limit (HCTL) for ATWS mitigation; (4) analytical capability needed to accurately model ATWS; (5).

uncertainty in existing analyses.

2/28/90 50-335/

White Flint Bldg.

Discuss St. Lucie 1 and 2 NRC/FP&L J. Norris 1:00 389 Room 16B-11 safeguards issues.

3/15/90 50-269/

McGuire Nuclear Plant Discuss the status of various MRC/GPCo

.L. Wiens 8:30-4:00 270 licensing activies and safety Duke Power Co.

initiatives at Duke Power Company's-and Georgia Power Company's nuclear stations j

included in PDII-3 area of responsibility.

!9 P

o C

- #l i

o

~

T ;

~

.m o

- w

~

S January '26,- 1998 i.y letSS Meeting Motices

.M g-

.E.

Division.of. Low-Level. Waste.Manassamat and.Cecommissioslag Dot.ket

. Attendees /

Date/ Time Number Location Rurpose Applicant NRC.C=+='t 1/29-2/9 Raleigh, NC To participate-.in

~ letSS.

J. Shaffner Agreement States Program Reviews 1/30 6B-13 OWFN Reactor Decommissioning NMSS T. C. Johnson-Costs DOE Staff 2/01-2/02 Springfield,.IL IDMS Agreement State NMSS J. Shaffner Review i

2/05-2/07 Salt Lake City, UT Agreement State Review NMSS J. Shaffner 2/08-2/09 Springfield, IL IDMS Agreement State letSS J. Shaffner.

Review 2/25-3/01 Tucson, AZ Waste Management NMSS L. Pittiglio 3

90 Conference Y

.a P

o C:=

m O

. _ _, [.

. m

_ _ _ _ _. _., _ _ __m_.

.2-

~

~

q S

- Division.of ladustrial-and NedicaLNucleat Safety

E.

2 Docket Attendees /

y Date/ Tim Number Location Purpose Applicant NRC. Contact-

~

2/6 Project Baton Rouge, LA Brief Louisiana Dept.

NMSS P. Loysen d

,E M-45 of Environment Quality D. Garrison, RIV Officials on LES B. Spell Project and Uranium M. McDaniel, LA Official Hexafluoride et al..

Division,of Safeguards.and Transportation Docket Attendees /

Date/ Time liumber Location Purpose Appitcaat NRC.Costact 2/21-22/90 Lexington, KY Participate in NMSS E. Easton Transportation DOE Contractors Coordination Group i

l meeting, Office of Civilian Radioactive l

l Waste Management, DOE l

t Division.of High.LeveLWaste. Manage===t Docket Attendees /

Date/ Time Numbec Location og Applicant BRC.Costact' l

2 P

2/6-7 Las Vegas, NV To discuss preliminary IMSS K. Stablein 8

Yucca Mt., NV results of investi-RES E

gation on silica veins State of Nevada i

DOE o

P m.

.: a

.g

.,i Sa -

EES.Neeting Wotices

=

c B

Docket Attendees /

Date/ Time Number Location Purpose Applicast-WRC-Costact:

~*

E Directcris Office a

Nuclear Safety Research. Review. Committee.(N$RRC). Nestings 2/13/90

' Guest Quarters MSRRC Subcomunittee meeting R. Shepard Bethesda, MD (with Chairman Carr in attendance)

--492-3723 Division-of Engineering 3/20-21/90 Bethesda Ramada Inn Nuclear Plant Aging ~

J. Vora Bethesda, MD Research (NPAR): Research 492-3854 Review Group Meeting Division.of Systemt.Research 3/8-9/90 Washington, DC Attend NUREG-1150 Peer J. Murphy &

M. Cunningham Area Review Committee Meeting M. Cunningham 492-3 % 5 t

i E

p S

E m

D l

l I

i

.. p 6-4 o

E:

January 26, 1990 y

Office.for. Analysis.and Evaluation.of Operational Data 4

ro

?

Docket Attendees /

Date/ Time' Number

' Location Purpose Applicant MRC. Contact--

E AE00, MRR, MMSS, RES,~OP, Kenneth Raglin

'o 01/30 TTC Training Advisory Group (TAG)

Chattanooga, TN GPA,.RI, RII, RIII, RIV, RV E

P S

E m

O.

.. ~

<,e-i._,

-->m-~

m 2>

1 t <

.=

._,___---mm*

-m

-7

..o r j.

'g; l

ll t%

q k

January 26, 1990 g

Region I.Neeting Notices

o Docket Atiendees/

,y Date/ Time Number Location Purpose-Applicant NRC Costact' W8 02/07/90 50-244 '

RI Office Management Meeting

. Licensee and Selected McCabe-9:00 am RGE&C - Ginna RI Staff Members 02/07/90 50-29 RI Office Licensee Presentation-Licensee and Selected Blough 1:00 pm YAEC - Yankee Rowe RI Staff Hesbers 02/09/90 50-219 RI Office Management Meeting Licensee and Selected Collins-10:00 am

'GPUN - Oyster Creek RI Staff Members E

P 8

85 m

D

-~

y m

q

.soi <

ti 1

Janeary 26,31990*:,. C

g-

. RII. MEETING. NOTICE E

, ' Pe -

ATTENDEES /

l*

DOCKET-PURPOSE APPLICANI NEC CONTACT'

'.M DATE/ TIME NUMBER LOCATION e

01/30/90 Huntersville, NC SALP Presentation - DPC Licensee, RA, and selected Ebneter' 8

1:00 p.m.

McGuire facility.

RII and resident staff l

01/31/90 York, SC SALP Presentation - DPC Licensee, RA,.and selected Ebneter 1-9:00 a.m.

Catawba facility RII and resident staff 02/01/90 RII Office Enforcement Conference Licensee, RA and selected Ebneter 1:00 p.m.

FPC - Crystal River RII staff members

.. t 02/09/90 RII Office Enforcement Conference Licensee, RA and selected Ebneter 10:00 a.m.

CP&L - Harris RII staff members

-t 02/20/90 New Hill, NC SALP Presentation - CP&lf Licensee, RA, and selected Ebneter Harris facility RII and resident staff I

t P

8 5

m A3 a

I u

s

.: w S'

- =j J

RegionIII Meeting notices t-c

-'E.

Docket-Attendees 5

Date/ Time Number Location Purpose _

Applicant ERC.rnatact-8 M

01/30/90 50-440 Columbus, OH Meeting with State of Ohio State Governor, Lickus 8

50-441 Ohio Governor's Office Regional Administrator and-l to' discuss Perry selected members of.RIII Nuclear Plant

. Staff l

l 01/30/90 030-01691 Region III VA Medical Center, Licensee, Deputy Regional Norelius 11:00 am DesMoines, IA -

Administrator and selected I

. Enforcement Conference members of RIII Staff 02/01/90 50-331 Region III Iowa Electric Light &

Licensee, Regional.

' Davis-9:00 am Power Company, Duane Administrator and selected Arnold - Management members of RIII Staff Meeting 02/07/90 50-346 Headquarters Toledo Edison Company, Licensee, Deputy Regional Greenman 1:00 pm Davis-Besse - Management Administrator and selected Meeting members of RIII Staff 02/09/90 50-440 Perry Plant Detroit Edison Company, Licensee and selected Greenman 1:00 pm 50-441 Fermi - Management members of RIII Staff Meeting 1

01/13/90 Headquarters Illinois Department of IDNS, EDO, GPA, Regional Lickus 1:30 pm Nuclear Safety -

Administrator and selected Management Meeting members of RIII~ Staff 02/14/90 50-341 Fermi Plant Detroit Edison Compar4y, Licensee Deputy Regional Morelius C

Fermi - Emergency

' Administrator and selected P

Preparedness Exercise members of RIII Staff 8

5 e

1 g---,

p w.-

u f,

y e

c.e>-

r 6,.,.-g--,%,

e w

v

,ew-

,.sg.w c.-

--- m ot.

7 i t' 4

N' Region.IV MeetingJotice i- :

ly January 26, 1990 l ~ ' :*n Docket

. Attendees /

' RIV.Comtact

' ^

S-Date~

Number.

. Location

. Rurpose Applicant.-

t 2/02/90 30-05965 RIV Firestone Tire & Rubber Company.

FT&R Mnget.

BBeach, LYandell, l

(1:00) 35-13617 Enforcement Conference to discuss j

weaknesses:in their management of FT&R's radiation safety program.

s.

6 b

q

. h P

8

!5 m

C gn-r f.

r-m....%-,v 9

<~g e..-

.f

,c

,.<n w

.r,$.f..,.

s.4,,

,..,, ~., _

,:u,,,,,-

,e',

,,#,...,l

. -.= m 3 __

X(

January 25. 1990 -

f. + 1,,.

,_g-Region V.MeetingiNotice M

Docket Attendees /

Date/ Time Number.

Location

-Parposa Applicant-ERC.Costact1 38 2/11-13/90 Baltimore, SES conference J. Martin A. Chaffee MD R. Scarano A. Chaffee P8 E

m

[>

-o w

.mw

-n u m#

s.fh.-

2u-=1-.we-ps.w-ama,un=:-se-----m..m 4...M a

.iah-em han.;-.

.nh

--a-

--