Forwards Insp Repts 50-445/89-23 & 50-446/89-23 on 890405-0502.Violations Noted.Util Should Prepare to Present Assessment of Safety Significance,Root Cause & Corrective Actions
ML20006C520
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/26/1990
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20006C521 List:
References
EA-88-310, NUDOCS 9002080160
Download: ML20006C520 (4)


See also: IR 05000445/1989023

Text

{w

_

~

t.

o

.&

iS:

'

,

i

4

.

In' Reply Refer To:

jag 2 6 [ggg

Dockets : 50-445/89-23-

50-446/89-23

Mr. W. J. Cahill, Jr.

Executive Vice President

TU Electric

,

400 North Olive Street, Lock Box 81

,

Dallas, Texas

75201

-Dear Mr. Cahill:

This refers to the inspection conducted by Mr. H. S. Phillips during

.

the period April 5 through May.2, 1989, of activities authorized by

NRC Construction Permits CPPR-126 and CPPR-127 for.the Comanche Peak

Steam Electric-Station, Units 1 and 2, and to the discussion of our

findings with'Itr. H. D. Bruner and other members of your staff at the

. conclusion of the inspection.

Areas' examined during this inspection included TU Electric actions

relating to Enforcement Action 88-310; TU Electric Code V

procurements for work on the component cooling water heat exchangers,

repair' work on diesel generator heat exchangers, application and

removal of coatings from diesel generator fuel tanks, and vendor

services to measure steam generator nozzles; and follow-up on

previously identified inspection items.

Within these areas, the

,

inspection consisted of selective examination of procedures and

1

-representative records, interviews with personnel, and' observations

l

by the' inspector.

The inspection findings are documented in the

enclosed inspection report.

L

In addition to this inspection report, Mr-. Phillips also documented

c

L

additional findings and opinions in an internal NRC memorandum to me

i

dated June 21, 1989.

It is our understanding that a copy of

Mr. Phillip's memorandum was provided'to TU Electric anonymously.

L

Your1 response-to Mr. Phillip's memorandum was submitted to the NRC on

h

December 11, 1989, by letter TXX-89847.

,

This matter was referred to the NRC Office of Investigations to

determine whether there was any wrongdoing associated with the

findings in this report.

Although the OI report has not yet been

issued, they have informed us that, while there were

,

misunderstandings associated with the actions you took in response to

EA 88-310,-the investigation disclosed no evidence of an intent to

deceive the NRC.

RFid/W

'

CPPD:NRRff'd

AD:CPPD:NRR

D:OI:RIV

D:CPPD:NRR

HLivermore:ww

RWarnick

DDriskil'1

CGrimes

$1fhrir.

1/H/90

1/ M/90

1/2/,/90

1/2r/9p$/

f

e

O

45

Zr

hK

O

r'^*

-

c encars,yfrinLW

PDC

Grumes ra

9

,

gyg

.

--

. .

.-.

.

_

_ _

,

I

'

o_

.-

..

t'

s

A

W. J.'Cahill, Jr.

-2-

JW 2 61990

>

!

Nevertheless, there are apparent violations identified in the

enclosed inspection report related to the adequacy of your evaluation

of the other Code V procurements that must be resolved.

An addendum

has been attached to the report to update its findings.

We intend to

discuss these matters in an enforcement conference that will be

!

scheduled in the near future.

You should be prepared to present your

'

assessment of the safety significance, root cause and corrective

actions for these issues, as appropriate.

You will be informed in writing of the NRC decision on enforcement

,

action when that decision is reached after the conference.

In

'

accordance with 10 CFR 2, Appendix C, the enforcement conference will

not be open to the public.

-

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed report will be placed in the NRC

-Public Document Room.

Should you have any questions concerning this inspections, we will be

.

pleased to discuss them with you.

Sincerely,

RFbt) M f,rr

C. I. Grimes, Director

Comanche Peak-Project Division

L

Office of Nuclear Reactor Regulation

i

Enclosure:

Inspection Report 50-445/89-23; 50-446/89-23

cc w/ enclosure:

See next page.

L

,

l

. . _ . .

--

.

. , .- . . _ .

...._..

.- . -

. .. - - . ---

.

- - -. - . .

i t

t

.Q-1

"4'

4

.

'

!

W. J..Cahill, Jr.

a

JAN 2 61990

j

i

oc w/ enclosure

!

Roger D. Walker

TU Electric

!

Manager, Nuclear Licensing

c/o Bethesda Licensing

l

TU Electric

- 3 Metro Center, Suite 610

skyway-Tower

Bethesda, Maryland. 20814

l

400 North-olive Street, L.B. 81

i

Dallas, TX

75201

E. F. Ottney

' j

~ P. 0. Box 1777

i

.Juanita Ellis

Glen Rose, Texas

76043.

l

President - CASE:

1426-South Polk Street

Jack R. Newman

!

Dallas, TX

75224

Newman & Holtzinger

- i

1615 L Street, NW

'

Texas Radiation Control

Suite 1000

- 1

Program Director'

Washington, DC

20036

i

Texas Department of Health

1100: West 49th Street

George R. Bynog

i

Austin, Texas

78756

Program Mgr./ Chief Inspector.

1

Texas Dept. of Labor & Standards

i

GDS Associates, Inc. .

Boiler Division

1

1850 Parkway Place, suite 720

P.O. Box 12157, Capitol Station

Marietta, GA

30067-8237

Austin, Texas '78711

'

Honorable George Crump

'

County Judge-

Glen Rose, Texas

76043

i

Ms.. Billie Pirner Garde, Esq.

_

Robinson, Robinson, et.al.

'

103 East College Avenue

Appleton, WI

54911

,

-

Regional Administrator, Region IV

'

oU.S. Nuclear Regulatory Commission

611 Ryan Plaza _ Drive, Suite 1000

Arlington, Texas

76011

,

William'A. Burchette, Esq.

- !

Counsel for Tex-La Electric

'

Cooperative of Texas

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW'

Washington, DC

20007

,

,

b

,

lr

.a.[-,a--_--.--_L

'

._-_____._,__,,,_,____m

._m_,,_____

,.__.__, -

,_, ,.,

i._-y.

,

,,.%.,_.._

. ,

,,_,,,w

py-

y

_,,,,,__c.p

, ,

m

7

,.,%..x.p.

,

y,

_m.

'

.

. -

.

.

End: ' -

.

.

50-445///-2.f; 50-446///-J.3

DISTRIBUTION:

i'

  1. .'"TSDocketTFi1E(50-445/f46[ /

'

" ' '

"'NRC'PDR'

LPDR

CPPD-LA

E

'CPPD Reading (HQ)

ADSP

Reading

  • Site" Reading File
  • R. Warnick
  • J. Wiebe-
  • H~. Livermore
  • MIS System, RIV-
  • RSTS Operator, RIV

-RPB, RIV

RIV Docket File

J. Gilliland, RIV

  • L.

Shea, ARM /LFMB

C. I. Grimes

d

J. H. Wilson

J. Lyons

' g'.

M.-Malloy

.

J. Moore, OGC

M. Fields

D.

Crutchfield

T. Quay

E. Jordan

B. Grimes

B.-Hayes-

C. Vandenburgh

J.

Partlow

  • w/766'

.