Forwards Insp Rept 50-344/89-30 on 891218-22 & Notices of Violation & Deviation.Nrc Interested in Seeing Util Analysis of Causative Factors for Violations Similar to Item a & Explanation of How to Improve Plan or Preclude Recurrence
ML20006C392
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/19/1990
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20006C393 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 9002070437
Download: ML20006C392 (3)


See also: IR 05000344/1989030

Text

en

. ( ,.

~

~

]

-

.:

.

<

.

'

.)

v

..

a

i

'

JAN 191993

'

,

,,

Docket No. 50-344

'i

.

.i

Portland General Electric Company

.

121 SW Salmon Street TB-17

i

Portland, Oregon-97E04

,

Attention:

Mr. David W. Cockfield, Vice President, Nuclear

Gentlemen:.

)

SUBJECT:

NRC INSPECTION TROJAN NUCLEAR PLANT

This refers to the inspection conducted by Mr. J. Russell of this office on-

l

December 18 through 22, 1989, of activities autt.orized by NRC License No.

'

NPF-1 and to the discussion of our findings held by Mr. Russell with Mr. Yundt

and other members of your staff at the conclusion of the inspection. .

Areas examined during this ins)ection are described in the enclosed inspection

.

report.

Within these areas, tie inspection consisted of selective

examinations of arocedures and representative records, interviews with

. personnel, and caservations by the inspector.

'

Based on the results of this inspection, it appears that some of your-

activities were not conducted in full compliance with NRC recuirements as set

forth in the Notice of Violation, enclosed herewith as Appencix A, and the

- Notice of Deviation, enclosed herewith as Appendix B.

'

!

Your response to these Notices is to be submitted in accordance with the

!

- provisions of 10 CFR 2.201 as stated in the~ Appendices.

s

We note that item A of Appendix A is a repeat of violation B. 3. in our letter

to you dated March 15, 1989.

Both violations are very /NRC management meeting

similar in nature and

have to do with work control practices.

During the PGE

on January 12, 1990, you presented your enhanced nuclear division improvement

plan and stressed steps being taken to improve maintenance.

In your reply to.

.

the enclosed Notice of Violation, we would be interested in seeing your

,

analysis of the causative factors for these similar violations and.an

explanation of how your improvement plan should have or will preclude

,

recurrence.

'

In addition to the repetitive aspects of item A, enclosed, we have~ concern

regarding the quality of your own review of matters related to the monitoring

i i

of containment depressurizations via the hydrogen vent system.

Page 4 of the

5

1

-e

enclosed inspection report describes your use of questionable monitoring data

,

to discount s)ecific statements of a worker which clearly imply that the wrong

train of the lydrogen vent system may have been monitored during the mid-July.

to mid-September time frame.

With your reply to the Notice of Violation, we -'A

would also appreciate receiving your final conclusion on this point and

/

i

'

/

90020 _70437 900119 g

.

-

__

gebs

~

.

.

T.-

<.

'

JAN 101993

,

!

whether steps are needed to improve your staff's objectivity during root cause

'

analysis.

'

The responses directed by this letter and the accompanying Notices are not

subjecttotheclearanceproceduresoftheOfficeofManagementandBudgetas

!

required by the Paperwork Reduction Act of 1980, PL 96-511.

!

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures-

will be placed in the NRC Public Document Room.

Should ycu have any questions concerning this inspection, we will be glad to

discuss them with you.

'

Sincerely,

,

0flh,

-

I

Ross AUScaran

Director

!

DivisionofRad}ationSafety

I

and Safeguards

Enclosures:

1.

Inspection Report No. 50-344/89-30

[

2.

Appendix A, Notice of Violation

3.

Appendix B,-Notice of Deviation

cc w/ enclosures:

,

T. D. Walt, General Manager

C. P. Yundt, Trojan Nuclear Plant

L. A. Girard, Vice President and General Counsel

D. Stewart-Smith, Oregon DOE

bec w/ enclosures:

A&B/DeeteentT6ntrol-Desk-(RIDS) (IE06):-

Pro 4ect Inspector

ResidentInspector

-G.

Cook

B. Faulkenberry

J. Martin

R. Nease, NRR

Docket File

bec w/o enclosures:

.

LFMB

M. Smith

,

\\6

REGIONV/jr

M

k

JRussell

FWenslawski

AJohn son

MMendonca

GYuh s

1//b/90

1/f//30

1/ /90

1 M /90

' REQUEST COPY ] FEQVE51 COPY

rREQUEST COPY _,4EQUEST COPY ] JsEQVEST COPY ]

]

.// NO

]IVES) / N0

l YES)/ NO

J YES Y NO

](YES) / NO

]

-

v

v

-

9.

i'

. .

c'

p-'

.

.'

i

f

JANj9;gg3

RSc

1/j /90

!