Forwards Insp Rept 50-395/89-200 on 891127-1215.Deficiencies Noted
ML20006B890
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/26/1990
From: Varga S
Office of Nuclear Reactor Regulation
To: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20006B891 List:
References
IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 9002060061
Download: ML20006B890 (4)


See also: IR 05000395/1989200

Text

_

_

__

.

.

<

...

.

.N

- .

]

.'

![ preop >

+

of

UNITED STATES

'i

NUCLEAR REGULATORY COMMISSION

~-

J

5

1l

wassiwntow, o, c.20sss

\\...../

l

u

.

u

January 26, 1990

s

Docket No. 50-395:

I

L

Mr. O. S. Bradham

-

i

'-

Vice President, Nuclear Operations

4

South Carolina Electric.8 Gas Company

n

Virgil C. Summer Nuclear Station-

1

P.O. Box B8:

'

Jenkinsville, South Carolina 29065

5

l:

i'

'

Dear Mr. Bradham:

i

-

.

!

SUBJECT: BULLETINS 79-02 AND 79-14. FOLLOW-UP INSPECTION REPORT 50-395/89-200

+

This letter transmits-the results of the follow-up inspection conducted by the

!

L

- Office of Nuclear Reactor Regulation (NRR) to verify compliance with Inspection -

!

L

andEnforcementBulletins(IEB)79-02,"PipeSupport-Baseplate-DesignsUsing

Expansion Anchor Bolts," and 79-14, " Seismic' Analysis for As-Built Safety-

i

-Related Piping Systems." This inspection was conducted from November.27'.

.

!

through December l',1989 and December.11 through 15, 1989 by a team composed of-

NRR staff and consultants.

'

l,

In reviewing South Carolina Electric and Gas (SCE&G) Company's effort regarding

~

,

IEB 79-02, the teani discovered that the computer program-used to verify anchor

I

bolt and baseplate sizing had not properly; accounted for anchor boltystiffness.

'

Excluding this one issue, the inspection team was satisfied that the: anchor.

~

bolts and baseplates had been properly designed and' constructed. Thus, SCE8G

l

.;

had complied with the bulletin.

,

i

,

With respect to IEB 79-14, the inspection team was satisfied-that the design

drawings properly reflected the as-built configuration of.the plant and that

the piping analysis calculations were readily auditable. Thus, compliance

-l

to IEB 79-14'was demonstrated. However, the inspection team identified

inconsistent modeling techniques used by different piping analysis contractors,

l

unconservative piping analysis modeling practices, and unjustified engineering

assumptione

.

a

,

'The deficiencies noted in Appendix A are considered-to be the most significant

?

l-

issues. identified during the inspection. Appendix B to the inspection report

,

contains minor discrepancies that appeared to the inspection team to be.

'

isolated errors with minimal safety significance. The Appendix B discre-

.i

pancies are listed for. completeness and they are expected'to be resolved

by SCE&G without the need for NRC inspection.

4

!

-

\\

.

t

,

gg2ggggi $@8hp

e

.

.

4

-,

-w--

e

.w,

. , - -

..,eu-.-

, , .

..

-m.-

.. ,

a.-

,

,.4- - . . - ,

_

. . _ _ _ _ - _

_ .

. - .

. _ .

. - -

.

.

,

.

.

Mr. O. S. Bradham

-2-

January 26, 1990

..

In Appendix C, four issues were identified by the team that require additional

review by the NRC.

The' results of our review will be communicated to you

1

when they are available.

]

l

-SCE&G should individually track all items identified during the inspection such

that their formal resolution can be verified at a later date.

Please inform us of the date by which actions'.related to the open items identi-

fied in this report will be available for follow-up inspection. Some of the

4

identified items may be potential enforcement findings. Any enforcement

actions will be identified by Region 11 in separate correspondence.

In accordance with 10 CFR 2.790(a), a copy of this-letter and the enclosure

will be placed in the NRC Public Document Room.

-l

Should you have any questions concerning this inspection, please contact the -

NRR Project Manager, Mr. Jack Hayes or the inspection team leader

Mr. Ron Parkhill. Messrs. Hayes and Parkhill can be reached at (301) 492-1456

and(301)492-0963, respectively.

. Sincerely,

Original sign'ed by

Steven A. Varga, Director

Division of Reactor Projects I/II

Office of Nuclear Reactor Regulation

.

Enclosure:

Inspection Report 50-395/89-200

I

i-

  • SEE PREVIOUS CONCURRENCE

RSIB:DRIS*

ESGB:DET*

EMEBDET* SC:RSIB:DRIS* C:RSIB:DRIS*

D:DRIS*'

RWParkhill:bt JSMa

AJLee

EVImbro

WDLanning

BKGrimes

01/24/90

01/26/9p

01/23/90 01/24/90

01/24/90

01/24/90

D:DET*

P

DRP

'

JERichardson

a

01/26/90

90

i

,

!

,

-

-

_

. _ _ _ - _ _

_ _ _ _ - _ _ - _ _ _ _ _ _ _

.a

.;

!

o .. L

.

3

'

y

L,

.

-Mr. O. S. Bradham-

-3-

January 26, 1990

'

'

t

!

cc w/ enclosure:

a,

,

Mr.- William A. Williams, Jr.

'

h

Technical-Assistant - Nuclear Operations-

~ Santee Cooper

P.O. Box 764(MailCode.153)

?

Columbia, South Carolina 29218-

-

'J. B. Knotts, Jr. ,' Esq.

'

' Bishop,' Cook, Purcell-

and Reynolds-

l

1400 L_ Street, N.W.

'I

Washington,-D.C. :20005-3502

'

>

'

Perry C. Hopkins'

Resident Inspector /Sumer NPS

r

-c/o U.S. Nuclear Regulatory Comission

- 1

Route 1, Box 64

'i

Jenkinsv111e, South Carolina 29065

j

i

Stewart D. Ebneter-

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

101 Marietta Street, N.W., Suite 2900

'

Atlanta, Georgia 30323~

Chairman, Fairfield County Council

P.O. Box 293

Winnsboro, South Carolina .29180

Mr. Heyward G. Shealy, Chief

Bureau of Radiological Health

-South Carolina' Department of Health

and Environmental Control

2600 Bull Street

Columbia, South Carolina 29201

>

I-

South Carolina Electric and Gas Company

l~

Mr. A. R. Koon, Jr. .. Manager

.

Nuclear Licensing

.

,

. Virgil C. Summer Nuclear Station

1

-P.O. Box 88

Jenkinsville, South Carolina 29065

,

.,-

,

-

.

.s

.-

.

-

.

.

-

-

.

Mr. 0.:S. Bradham-

-- 4 - -

January 26,.1990

t

o

Distribution-

escastl.11es?.50F3963

RS I BTR/ F5""""^"'"**

DRIS'R/F'

!

'

TEMurley,' NRR

. JHSniezek, NRR

FJMiraglia, NRR-

,

FJHebdon, NRR

-j

BKGrimes, NRR

GClainas, NRR

,

WDLanning, NRR

t

EVImbro, NRR

.;

RWParkhill, hRR'

'

RSIB-Staff

SAVarga, NRR

JERichardson, NRR

-

JJHayes NRR

'!

EGAdensam, NRR-

GBagchi. NRR

PTKuo, NRR

LBMarsh, NRR .

.

l'

'JSMa, NRR

AJHLee, NRR

I

RLSpessard, AEOD

JJBlake, RII

FScantrell, Rll

RLPrevatte, SRI Summer.

-

Regional Administrators

'

Regional: Division Directors

l-

Inspection Team

LPDR

,

PDR

ACRS (3)

i

OGC-(3)

1

l

IS Distribution

.

.-

i

,

/

h

. - . -

-

.

l