ML20006B781
| ML20006B781 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/24/1990 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20006B713 | List: |
| References | |
| NUDOCS 9002050349 | |
| Download: ML20006B781 (1) | |
Text
-.......
~
JAFNPP LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.12 FIRE PROTECTION SYSTEMS 4.12 FIRE PROTECTION SYSTEMS Applicability:
Applicability:
Applies to the Operational Status of the Fire Protection Systems.
Applies to the Surveillance of the Fire Protection System.
Objective:
Objective:
To assure operability of the Fire Protection Systems.
To verify the~ operability of the Fire Protection Systems.
Specification:
Specification:
A.
High Pressure Water Fire Protection System A.
High Pressure' Water Fim Protection System 1-1.
High pressure water fire protection system testing:
Both high pressure water fire protection pumps and a.
item i'
associated automatic and manual initiation logic Frequency shall be operable and alegned to the high pressure a.
High pressure Once/ week water fire header.
water fire protection system -
u b.
The high pressure water fire protection system shall pressum M.
be operable with an operable flow path capable of g
l talang suction from the lake and transferring the b.
Each pump, on a Once/ month grg
- O water through distribution piping with operable STA%ERED TW BK sectionalizing control or isolation valves to the yard by starty M pats @ st b gg hydrant curb valves and the first valve ahead of the at least 2 memtes on
- o water flow alarm device on each sprinkler, or spray recidanng How gj3 s
system riser required to be operable per specification 3.12.B and to each hose station nser isolation valve required to be operable per i
2ms cat M E.
cg d.
System flush Once/6 months
$$9 e.
Functional test
- Once/18 months including Amendment Nof Jil6, % 135 4
244a
--