ML20006B002
| ML20006B002 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/24/1990 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML20006B003 | List: |
| References | |
| NUDOCS 9001310157 | |
| Download: ML20006B002 (2) | |
Text
,
g A KE4 UNITED STATES 9
_ p(p NUCLEAR REGULATORY cOMMisslON 8
REGION lli 4
sl no noostvcLv nono 4
CLEN ELLYN, ILUNOl$ 60lH
....+
JAN 2 41990 Docket No. 50-346 l
Toledo Edison Company ATTN: Mr. Donald Shelton Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
SUBJECT:
DISCRETIONARY ENFORCEMENT RELATING TO AN-IN0PERABLE REACTOR PROTECTION SYSTEM INSTRUMENT This letter is in response to your verbal request on January 18,1990. and your January 19, 1990 letter requesting that the NRC exercise discretionary enforcement in the case of Technical Specification (TS) 3.3.1.1 regarding operation of the plant with one of four Flux-Delta Flux-Flow instruments in the Channel 2 Reactor Protection System (RPS) declared' inoperable.
We have reviewed the basis for your request noting that RPS Channel 2 would be g.
reset thus maintaining the two-out-of-four, logic for-all,RPS parameters except for the flux-delta flux-flow parameter, which becomes the equivalent of a two-out-of-three logic. We also note that while the flux-delta flux-flow parameter would be decla~ red inoperable, it would not be tripped and thus would-still provide a trip function, but approximately 0.07%~ full reactor power above the required trip setpoint limit.
We also understand-that, should any other component in the flux-delta flux-flow. logic in channels 1,:3 or 4 degrade beyond its TS limit, you will follow the appropriate actions of 1
T.S. 3.0.3.
Verbal authorization to proceed with the above condition was granted on January 18, 1990.
The period of time for which this enforcement discretion will remain in effect-will be until commencement of the refueling outage scheduled for February 1, 1990.
Sincerely, 4
fo t u
A. Bert Davis Regional Administrator
Attachment:
Ltr TE to NRC dtd 1/19/90
,g, See Attached Distribution
'i I' I
1
~
9001310157 900124 ADOCK0500g6 L
PDR P
a
.j Toledo Edison Company.
2 JAN 2 4 ~ 1990 i
Distribution cc w/ attachment:
L.. Storz Plant.. Manager 84U0123480$E1 l
Cicensing Fee Management Branch Resident Inspector, RIII James.W. Harris, State of Ohio Robert E. Owen, Ohio
. Department of Health A. Grandjean, State of Ohio, Public Utilities Commission v
l-s 4
7 k
r t
-