Forwards Insp Rept 50-333/89-11 on 891008-1202.Concerns Raised Re Inattention to Detail During Surveillance Testing, Causing Reactor Scram on 891105 & RCIC Sys Isolation on 891129
ML20006A846
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/23/1990
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20006A847 List:
References
NUDOCS 9001300329
Download: ML20006A846 (2)


See also: IR 05000333/1989011

Text

-

,

.

.

.

?

[

a

,

JAN 2 31990

n

[

Docket No. 50 333

>

New York Power Authority

,

James A. FitzPatrick Nuclear Power Plant

i-

-

' ATTN: Mr. William Fernandez

l

t"

-

Resident Manager

.

Post Office Box 41

i

,

Lycoming, New York 13093

I

Subject:

NRC Region I Inspection Report No. 50-333/89-11

This ~1etter transmits the results of the routine inspection conducted by

Messrs. W. Schmidt and R. Plasse of this office on October 8,1989 through

+

December 2,:1989, at the James A. FitzPatrick Nuclear Power' Plant, Scriba, New

York. Mr. Plasse- discussed the inspection findings with you and other members

"

of your staff at.the conclusion of the inspection.

The inspector identified

no violations. You need not reply to this letter.

The causes for several events discussed it, the report concern us.

It appears

that personnel _ inattention to detail during surveillance testing caused the

reactor scram on November 5,1989, and the reactor core isolation cooling sys-

tem isolation on November 29, 1989. Further, we believe that actions taken by

,

you. to resolve previous difficulties should have prevented the poor high

,

pressure coolant . injection system tagout during system maintenance and the

'

difficulty experienced with the automatic depressurization system Technical

Specifications. We look forward to increased management attention and improved

performance in these areas.

We appreciate your cooperation.

,

Sincerely,

I

"! S%ned By:

? L.; C. Unville

-

James C. Linville, Chief

I

Reactor Projects Branch No. 1

Division of Reactor Projects

l

Enclosure:

?

NRC Region I Inspection Report Number 50-333/89-11-

1

r

?

0FFICIAL RECORD COPY IR FITZ 89-11 - 0001.0.0

1k

01/23/90

gol

9001300329 900123

PDR

ADOCK 05000333

Q

PDC

.

.

_..

_

. _ ~

_

_

_ -

p'

,

,,

i

i

d-

0

1

New York Power Authority

2

JAN 3 31990

'

cc w/ enc 1:

J. Bayne, President

i

J. Brons, Executive Vice President-Nuclear Generation

R. Beedle, Vice President Nuclear Support

S. Zu11a, Vice President Nuclear Engineering

A. Klausmann, Senior Vice President-Appraisal and Compliance Services

R. Patch, Quality Assurance Superintendent

G. Wilverding, Manager, Nuclear Safety Evaluation

G. Goldstein, Assistant General Counsel

Department of Public' Service, State of New York

State of New York, Department of Law

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. Linville, DRP

D. Limroth, DRP

G. Meyer, DRP

M. Miller, SLO

J. Dyer, EDO

D. LaBarge, NRR

R. Kiessel, NRR

W. Cook, SRI - Nine Mile 1 & 2

L. Rossbach, SRI - Indian Point 3

I

9

RI:DRP

RI:DRP

F [:DRP

GMeyer

d.inville

WSchmidt/mjd

q

i

1/

1/N90

't/j/$C

LCIAL(q/90

RECORD COPY IR FI1Z 89-11 - 0002.0.0

[

OF

8

01/05/90

4

i

A