Forwards Safety Insp Repts 50-245/89-25 & 50-336/89-23 on 891021-1204.Plans & Schedules Re Improvements of Check Valve Performance Requested in Response to Events Involving Check Valve Failures in safety-related Applications
ML20006A827
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/19/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20006A828 List:
References
NUDOCS 9001300293
Download: ML20006A827 (2)


See also: IR 05000245/1989025

Text

4m=

i

g

7,

i

l

l

JAN 191990

Docket Nos. 50-245; 50-336

Northeast Nuclear Energy Company

ATTN:

Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

.

P.O. Box 270

-

Hartford, Connecticut

06141-0270

Gentlemen:

Subject: NRC Region I Combined Inspection Nos. 50-245/89-25; 50-336/89-23

'

This refers to routine resident safety inspection conducted by Mr. P.

Habighorst and others of this office during October 21 - December 4, 1989,

at the Millstone Nuclear Power Station, Units 1 & 2, Waterford, Connecticut

of activities authorized by NRC License Nos. DPR-21 and DPR-65 and to

discussions of our findings by Mr. Habighorst and Mr. Dempsey with Messrs.

'

J. Keenan and J. Stetz of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region 1

inspection report which is enclosed with this letter. Within these areas,

the inspection consisted of observation of activities, interviews with

personnel, measurements, and document reviews.

The enclosed inspection report (Sections 3.6, 5.1.2, 5.1.3, and 6.2) discusses

two events involving check valve failures in safety-related applications on

Millstone 1 and 2.

The events highlight the need to improve your program to

,

assure continued check valve operability and acceptable performance. We are

aware of your initiatives to upgrade precedures related to check valves.

Please let us know within 60 days from receipt of this letter of your plans and

schedules regarding improvements of check valve performance.

On November 8 and December 4, 1989, the resident inspector presented

various concerns (See Appendix A of the enclosure) from employees at

Millstone station to your staff for resolution. Further review of your

actions to address employees concerns will be included in subsequent

routine inspections.

In accordance with 10CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosure will be placed in the NRC Public Document

Room.

l

1

OFFICIAL RECORD COPY

CIR MILL 89-25/23 - 0001.0.0

i

0

$0bbk bb

f

e,

t,

Northeast Nuclear Energy Company

2

J A M 1 P '9M

The response requested by this letter is not subject to the clearance

r

procedures of the Office of Management and Budget as required by the Paperwork

'

Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

DEIGit.M me,n + y

EDWARD 0. U -

3

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

I

' Enclosure: NRC Region I Combined Inspection Report Nos. 50-245/89-I5;

50-336/89-23

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Station Superintendent

J. P. Stetz, Unit 1 Superintendent

J. S. Keenan, Unit 2 Superintendent

Gerald Garfield, Esquire

'

Public Document Room (PDR)

Lochil Public Document Room (LPOR)

NuclearSafetyInformationCenter(NSIC)

NRC Senior Resident Inspector

State of Connecticut

'

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

D. Haverkamp, DRP

G. Vissing PM, NRR

M. Boyle, PM, NRR

P. Habighorst, RI, Millstone 2

D. Dempsey, RI, Millstone 1

RI

RI

R

R

/PHab horst

W

, Raymond

DHaverkamp

E

nger

-

[g l /l

90

D

J//P/90

/////90

/g90

0FFICIAL RECORD COPY

CIR MILL 89-25/23 - 0002.0.0

01/18/90