ML20006A827
| ML20006A827 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/19/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20006A828 | List: |
| References | |
| NUDOCS 9001300293 | |
| Download: ML20006A827 (2) | |
See also: IR 05000245/1989025
Text
4m=
i
g
7,
i
l
l
JAN 191990
Docket Nos. 50-245; 50-336
Northeast Nuclear Energy Company
ATTN:
Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
.
P.O. Box 270
-
Hartford, Connecticut
06141-0270
Gentlemen:
Subject: NRC Region I Combined Inspection Nos. 50-245/89-25; 50-336/89-23
'
This refers to routine resident safety inspection conducted by Mr. P.
Habighorst and others of this office during October 21 - December 4, 1989,
at the Millstone Nuclear Power Station, Units 1 & 2, Waterford, Connecticut
of activities authorized by NRC License Nos. DPR-21 and DPR-65 and to
discussions of our findings by Mr. Habighorst and Mr. Dempsey with Messrs.
'
J. Keenan and J. Stetz of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region 1
inspection report which is enclosed with this letter. Within these areas,
the inspection consisted of observation of activities, interviews with
personnel, measurements, and document reviews.
The enclosed inspection report (Sections 3.6, 5.1.2, 5.1.3, and 6.2) discusses
two events involving check valve failures in safety-related applications on
Millstone 1 and 2.
The events highlight the need to improve your program to
,
assure continued check valve operability and acceptable performance. We are
aware of your initiatives to upgrade precedures related to check valves.
Please let us know within 60 days from receipt of this letter of your plans and
schedules regarding improvements of check valve performance.
On November 8 and December 4, 1989, the resident inspector presented
various concerns (See Appendix A of the enclosure) from employees at
Millstone station to your staff for resolution. Further review of your
actions to address employees concerns will be included in subsequent
routine inspections.
In accordance with 10CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosure will be placed in the NRC Public Document
Room.
l
1
OFFICIAL RECORD COPY
CIR MILL 89-25/23 - 0001.0.0
i
0
$0bbk bb
f
e,
t,
Northeast Nuclear Energy Company
2
J A M 1 P '9M
The response requested by this letter is not subject to the clearance
r
procedures of the Office of Management and Budget as required by the Paperwork
'
Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
DEIGit.M me,n + y
EDWARD 0. U -
- 3
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects
I
' Enclosure: NRC Region I Combined Inspection Report Nos. 50-245/89-I5;
50-336/89-23
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Director of Quality Services
S. E. Scace, Station Superintendent
J. P. Stetz, Unit 1 Superintendent
J. S. Keenan, Unit 2 Superintendent
Gerald Garfield, Esquire
'
Public Document Room (PDR)
Lochil Public Document Room (LPOR)
NuclearSafetyInformationCenter(NSIC)
NRC Senior Resident Inspector
State of Connecticut
'
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
D. Haverkamp, DRP
P. Habighorst, RI, Millstone 2
D. Dempsey, RI, Millstone 1
RI
RI
R
R
/PHab horst
W
, Raymond
DHaverkamp
E
nger
-
[g l /l
90
D
J//P/90
/////90
/g90
0FFICIAL RECORD COPY
CIR MILL 89-25/23 - 0002.0.0
01/18/90
l