Advises That 890331 & 1107 Responses to NRC Bulletin 88-010, Suppl 1 Re Nonconforming molded-case Circuit Breakers Acceptable.Detailed Technical Review Not Yet Performed
ML20006A588
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/22/1990
From: Alexion T
Office of Nuclear Reactor Regulation
To: Schnell D
UNION ELECTRIC CO.
References
IEB-88-010, IEB-88-10, TAC-71274, NUDOCS 9001290157
Download: ML20006A588 (2)


Text

,

r January 22, 1990 DISTRIBUTION UN@

Docket No.

50-483 PDill-3 r/f TAlexion PKreutzer WBrach, RVIB JStone, PD12 Mr. Donald F. Schnell NRC & Local PDRS Senior Vice President - Nuclear JZwolinski Union Electric Company JHannon Post Office Box 149 OGC-WF1 St. Louis, Missouri 63166 EJordan ACRS(10)

Dear Mr. Schnell:

PDIII-3 Gray NRCBULLETIN88-10ANDSUPPLEMENT1TOBULLETIN88-10}

SUBJECT:

NONCONFORMING MOLDED-CASE CIRCUIT BREAKEkS (TAC 71274 By letters dated Parch'31 and November 7,1989, you responded to Bulletin 88-10. As a result of Supplement 1 to Bulletin 88-10, corrections to your March 31, 1989 letter were not required, with the exception that your November 7, 1989 letter states that the review of breaker traceability was expanded to include original spares purchased under the construction program which were received after August 1, 1983. The November 7,1989 letter also verified that the bulletin provisions as clarified by the supplement have been met.

A detailed technical review of your responses has not been performed; however, the area may be subject to inspection at a later date.

If a subsequent inspection identifies deficiencies in your actions and responses, this issue will be reopened.

Presently, the staff considers your response to Bulletin 88-10 complete for Callaway Plant.

Sincerely,

/s/

Thomas W. Alexion, Project Manager Project Directorate 111-3 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page jf Office:

LA/PDIII-3 P PD Rd h'JSt PD/ Phil-3 Surname: PKrboher TA%5'n/.

WW h

e JHannon

'Date:

// 9 /90

)/k /90 l/

/90

/

90

/

0

, tm Lu k k m t4%,,,

0[ANM9 [ov jg2g;gggggg3 77 ) W N#1 ip

k e

i Mr.. D. F. Schnell Callaway Plant Union Electric Company Unit No 1 i

CC:

Dr. J. O. Cennack Mr. Bart D. Withers CFA Inc.

President and Chief 4 Professional Dr., Suite 110 Executive Officer Gaithersburg, MD 20879 Wolf Creek Nuclear Operating Corporation Gerald Charnoff, Esq.

P. O. Box 411 Thomas A. Baxter, Esq.

Burlington, Kansas 66839 Shaw, Pittman, Potts & Trowbridge 2300 N Street, N. W.

Mr. Dan I. Bolef, President Washington, D. C.

20037 Kay Drey Representative Board of, Directors Coalition Mr. T. P. Sharkey for the Environment l

Supervising Engineer, St. Louis Region Site Licensing 6267 Delmar Boulevard Union Electric Company University City, Missouri 63130 i

Post Office Box 620 Fulton, Missouri 65251 U. S. Nuclear Regulatory Commission Resident Inspectors Office RRf1 l

Steedman, Missouri 65077 Mr. Alan C. Passwater, Manager Licensing and Fuels Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 Manager - Electric Department Missouri Public Service Comission 301 W. High Post Office Box 360 l

Jefferson City, Missouri 65102 Regional Administrator U. S. NRC, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera Deputy Director DepartmentofNaturalResources P. O. Box 176 Jefferson City, Missouri 65102 l