ML20006A460

From kanterella
Jump to navigation Jump to search

Concludes That Proposed Changes to Section 13.2.2 of Updated SAR Re Revised Requalification Training Program for Plant Acceptable,Per
ML20006A460
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/23/1990
From: John Hickman
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
References
TAC-72631, NUDOCS 9001260287
Download: ML20006A460 (3)


Text

x q

[ 7, w;r y p 4,

~

e,

-jf; n.

vs.

. ' g;3;,

^

5

+.

k># _

,o w

y $m 23, 1990--

l7 e.

fC

January l ll9
V; d

3a

,t

, Docket No.:s50-461--

  • t 8

v 6. -

t i,

.7-4s IN Q'

_ k

( N. 1,

+

g.)T->Mr.' Dale L.JHoltzscher[ C cting Manager Licensing:and Safety 7M,

% TC

'"y N@g[J A

ClintoneP y

j ;

Pb O! Boxower Station.

. t4 678'

~

32 - s a

t n 4' Mail Code V920

..J '

F b?_

j',

(C1,inton,._ Illinois 61727:

f M*p a

Dear Mr. Holtzscher:

~.

- WM' q @p ;;.UBJECT:- REVISED REQUALIFICATION TRAINING PROGRAM FOR THE CLINTON POWER s

a

  • [9 l y..

j STATION, UNIT.N0.-1-(TAC NO. 72631)-

e

.By.-- etter ated December 6, 1988, 11linois Power submitted a proposed l

d

-revision.to their requalification training ^' prog' ram as documented-in Section-i L

l13;2.2 of the Clinton Power Station-Updated Safety Analysis Report (USAR).

1 Following discussions with the NRC staff, Illinois = Pow:'r submitted a revised.

L;

~

u

-request by11etter; dated September 20, 1989. -We have.now completed the staff's s

Lreview of the; proposed changes to-Section'13.2.2 of the USAR.--The staff

'l.

20 l

conclu' des'that the applicant's requalification training program for licensed-l

~

1 personnel is acceptable.as proposed in the letter dated September 20, 1989.

i m

Sincerely, v;

1 l

Original: signed by E

John B. Hickman, Project Manager.

m Project Directorate III-2 Division of Reactor Projects

III, 4

IV, V.and Special Projects Office of-Nuclear. Reactor Regulation f

cc: :See next page:

DISTRIBUTION E

fDRs' rdan L,

'PDIII-2.r/f ACRS (10)

LLuther RPelton, HFAB

  • z

-JHickman.

y#

+ i te,7

/

' - [ePDIllh.

PDIII-2:LA PDIII-2:

3

'JHickma. a

.LLuth JCraig M }. jlp1 1hf/

1/L1/90 4.3 c.

t CW 'I 0FFICIAL: RECORD COPY f."*L,, mh,'A-Document'Name: HOLTZSCHER2 a

j'J)Y**:,

.t

,4

g p..

(

)

tgb#w A4W

"-Y\\

^'

[.4. '

:- ):;,

' _ f"y'(i

  • p-UNITED STATES '

J E

NUCLEAR REGULATORY COMMISSION -

:;g j;e-wAswiwovow, o, c.20sss January 23, 1990 Docket No. 50-461-Mr. Dale L. Holtzscher Acting Manager - Licensing and Safety Clinton Power Station P. 0. Box 678-Mail Code V920 Clinton', Illinois 61727-

Dear Mr.' Holtzscher:

SUBJECT:

REVISED REQUALIFICATION TRAINING PROGRAM FOR THE CLINTON POWER STATION,UNITNO.1(TACNO.-72631)

By letter dated December 6, 1988, Illinois Power submitted a proposed revision to their requalification training program as documented in Section 13.2.2 of'the.Clinton Power Station Updated Safety Analysis Report (USAR).

Following discussions with the NRC staff, Illinois Power submitted a revised request-by-letter dated September 20, 1989. We have now completed the staff's review of the proposed changes to Section 13.2.2 of the USAR. The staff

. concludes:that the applicant's requalification training-program for licensed personnel is acceptable as proposed in the letter dated September 20, 1989.

Sincerely,

!N AW

[ohnB.Hickman,ProjectManager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page

1

)

.y w og

[-

Mr. Dale L. Holtzscher Clinton Power Station Illinois Power Company Unit 1 cC;-

Mr. J. - S. Perry Illinois Department Vice President of Nuclear Safety Clinton Power Station Office of Nuclear Facility Safety P.-0. Box 678 1035 Outer Park Drive Clinton, Illinois, 61727 Springfield, Illinois 62704 Mr. R. D. Freeman.

Mr. Donald Schopfer Manager-Nuclear Station Engineering Dept.

Project Manager 4

Clinton Power Station Sargent & Lundy Engineers P. O. Box 678 55 East Monroe Street Clinton, Illinois 61727 Chicago, Illinois 60603 Sheldon Zabel, Esquire

.Schiff, Hardin & Waite 7200 Sears Tower.

233 Wacker Drive Chicago, Illinois 60606 Resident Inspector-U. S. Nuclear Regulatory Commission RR#3, Box 229-A Clinton Illinois 61727 Mr. L. Larson Project Manager-General Electric Company lJ

~175 Curtner Avenue, N/C 395 San Jose, California 95125 1

Regional Administrator, Region III 799 Roosevelt Road, Bldg. #4 L

Glen Ellyn, Illinois 60137 l

l

~ Chairman of DeWitt County l

c/o County Clerk's Office

.DeWitt County Courthouse Clinton, Illinois 61727-L l

s' L

L o

i

--