ML20006A318
| ML20006A318 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/12/1990 |
| From: | Craig Harbuck, Poslusny C Office of Nuclear Reactor Regulation |
| To: | Tison Campbell ARKANSAS POWER & LIGHT CO. |
| References | |
| GL-88-20, TAC-74376, TAC-74377, NUDOCS 9001260116 | |
| Download: ML20006A318 (3) | |
Text
-
T UNITED STATES l'
T g
NUCLEAR REGULATORY COMM,lSSION
(,
g aa WASHINGTON, D. C. 20666
.....)
January 12, 1990 Docket Nos. 50-313 and 50-368 14r. T. Gene Campbell Vice President, Nuclear Arkansas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203
Dear Mr. Campbell:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER B8-20, II:DIVIDUAL PLANT EXAHII:ATI0t!S (IPE) (TAC NOS. 74376 AND 74377)
Ee:
Arkansas I:uclear One, Units 1 and 2 Ceneric. Letter 88-20 requires, in part, that each operating reactor licensee and construction pero.it holt'er: (1) ider.tify the approach and r,ethod selected for performing the IPE, (2) describe the nethod to be used, and (3) identify the schedule for perforning the IPE and submitting the results to the NRC.
This inforr..ation was to be subt.itted to the NPC within 60-days of issuance of tupplenent 1 of the generic letter.
We have revieved your letter dated Neverber 3, 1989, submitted in response to the reporting requiremtr.ts of the generic letter. We conclude that your IPE approach, c:ethodology and schedule are acceptable. We anticipate that eny possible additional arelysis or reporting requirements, sbch as these fror
- external evtr.ts or from the Containment Performance Improvement Program, will ret havc any adverse effect en your schedule. Hcwever, if your schedule should change, please notify the NRC of the proposed change and the reascn for the charge.
Should you have any questions concerning the requirements of the ger.eric letter, please contact 11r. Ilichael L. Boyle. NRR at (301) 492-1308 or Mr. John H. Flack, PESat(301)492-3979.
Sincerely, kJkfl th; C. Craig Harbuck, Project Manager Chester Poslusny, Jr. Project Manager Project Directorate IV Project Directorate IV Division of Reactor Projects - III, Division of Reactor Projects - III, IV, Y and Special Projects IV, V and Special Projects Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation ec:. Sce next page i'
ggg12gggCK03o9o333 gg i6,00,,,
p J
_............c
3
~[
January 12, 1990 V
)
Docket Hos. 50-313 e
and 50-368 j
i Mr. T. Gene Campbell Vice President, Nuclear Arkansas Power and Light Corrpany P. O. Cox $51 i
Little Rock, Arkansas 72203
Dear Mr. Campbell:
SUBJECT:
REVIEW 0F 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDtlAL PLANT EXAMINATIONS (IPE) (TAC NOS 74376 AND 74377) i Re:
' Arkansas Nuclear One, Units 1 and c j
Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the ap> roach and n+thod selected j
for performing the IPE, (2) describe the rethod to se used, and (3) identify i
i the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement'I of the generic letter, i
We have reviewed your letter dated November 1,1909, submitted in response to the reporting requiren+nts of the generic letter. We conclude that your IPE approach, methodology and schedule are acceptable. We anticipate that any 4
possible additional analysis or reporting requirements, such as those from l
external (: vents or from the Containnent Performance Improvement Program, will not have any adverse effect on your schedule. However, if your schedule should change, please notify the NRC of the proposed change and the reason for the l
change.-
Should you have any questions concerning the requirements of the generic letter.
please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, e
RESat(301)492-3979.
Sincerely,
-/s/
/s/
l
.. Project Directorate IV Project Directorate IV
'j
'C'. Craig Harbuck, Project Manager Chester Poslutny, Jr. Project Manager
- Division of Reactor Projects - 111, Division of Reactor Projects - III, IV, V and Special Projects IV, V and Special Projects 1
Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation s
cc: See next page DISTRIBUTION Docket TITE ~
NRC PDR Local POR PD4 Reading
~
G. Holahan F. Hebdon P. Noonan C. Poslusny C. Harbuck OGC-Rockville E. Jordan M. Boyle J. Flack ACRS(10)
PD4 Plant file OFC
- FD%7Q PD4/)h'
'i)DT/tL(t n NAMC :PNoonan th :CHarbu i(('i)D'47)
- CPoslusny
- fHebd DATE 201/cl/90
- 01/10 /90
- 01//d/90
- 01/n1/90 OF F I C I A[hEtDRD' tD)T~~" ~~ '" ~~ ~ "~"~ ~~ ~~~~ ~" * "'~"~'~~~~~ ~ '
Document Nane:
14 Mr. T. Gene Campbell Arkansas Nuclear One o
Arkansas Power t Light Company Unit Nos. I and 2 j
cc' Mr. Early Ewing, General !!anager Mr. Charles B. Brinkman, Manager Technical Support and Assessment Washington Nuclear Operations Arkansas Nuclear One Costustion Engineering, Inc.
P. O. Box 608.
12300 Twinbrook Parkway, suite 330 Russellville, Arkansas 72801 Rockville, Faryland 20852 i
Mr. Neil Carns Director Nuclear Operations Honorable Joe W. Phillips Arkansas Nuclear One County Judge of Pope County P. O. Box 608 Pope County Courthouse i
Russellville, Arkansas 72801 Russellville, Arkansas 72801 J
Nicholas S. Reynolds Esq.
Bishop, Cook, Purcell
& Reynolds
]a00 L Street, N.W.
Washington, D.C.
20005-3502 Regicnal Actinistrator, Region IV U.S. ?!uclear Regulatory Comission Office of Executive Director for Operations 611 Pyen Plaza Drive, Suite 1000 Arlington, Texas 76011 I
Senior Resident inspector U.S. I:uclear Regulatory Comission i
1 Nuclear Plant Road Russellville, Arkansas 72801 Ms.. Greta Dicus, Director t
l Division of Environmental Health 1
Protection Arkansas Departa nt of Health 4815 West Markam Street Little Rock, Arkansas 72201 1'
Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generatio6 Division l
1700 Rockville Pike, Suite 525 Rockville, Faryland 20852 1
i
.-