Requests Approval of Insertion & Withdrawal Schedule Cited in Topical Rept BAW-1543,Rev 3, Master Integrated Reactor Vessel Surveillance Program
ML20006A150
Person / Time
Site: Davis Besse 
Issue date: 01/15/1990
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1758, NUDOCS 9001250319
Download: ML20006A150 (2)


Text

v g;

iT:

'i

4-i.

3

'g y

a q

_s

[

,,.g.

c

. c Yh D

'l,

p" '}, e r,

EbYSON

[

j A Catscw Energy Cornpany w

g 1

1 DONAM) C. SHELTON.

1 vu,r* et-Near as

.h ; P -

(419) P49-2300 i

Docket'Numtier 50-346 a

f' l License Number NPF-3' e

'[ w,kSerial' Number.1758~.

~

c q,,

January 15, 1990:

<w

,Q L

S United States-Nuclear Regulatory Commission i

j

-Document.. Control ~ Desk H'

Washington,:D. C. 20555 yy p,'

(

Subject:

(Review of Babcock.and Wilcox Topical Report BAW-1543. Revision 3 -

~!

F Master' Integrated Reactor Vessel Surveillance Program-1

(

. Gentlemen:;

~

On August 19, 1988, the Nuclear Regulatory Commission (NRC) issued Amendment l~

,Numberf116;to:the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License, Appendix A Technical. Specifications (Log Number 2876 TAC C

LNumber 66699). 'This amendment, in part, removed the reactor vessel material.

-surveillancesspecimen withdrawal schedule from the Technical Specifications to A

.reflectithe.NRC's: acceptance of Babcock and Wilcox (B&W) Topical Report

BAW-1543A., Revision 2,: Addendum 1, November 1987, " Integrated Reactor Vessel' Mat'eria1' Surveillance Program".
On October 12, 1989.- the Master-Integrated Reactor Vessel Material ll Surveillance Program-(BAW-1543, Revision 3) was revised and submitted by the 4

l B&W Owners Group to the NRC (J. H. Taylor (B&W) to T. E. Murley (NRC)) for.

l review.and-approval.in accordance with 10CFR50, Appendix H.

The schedular q

aspects of-this. submittal were further revised and submitted by the B&W Owners p'

Group'~on January 10, 1990 (D. L. Howell (B&W) to B. J. Elliot (NRC)) for IL incorporation.into Revision 3 of BAW-1543.

This revision, with errata provided by the January 10, 1990 letter, incorporated into the program surveillance: specimens of weld material with high copper contents for-i Westinghouse designed plants' fabricated by Babcock and Wilcox Nuclear Servien

' Company (BWNS).

The withdrawal schedule for-several surveillance capsules was p

also revised'to an earlier time than presented in BAW-1543A due to the P

capsules having received;their End of Life (E0L)' fluence.

The expected EOL

+

fluence has dropped to that fluence presently received by the capsules due to the implementation of " Low Leakage" core configurations. Additionally, it is planned to install four new capsules at DBNPS during the sixth refueling l

outage.- These capsules have been defined in BAW-1543, Revision 3, Table 3-20 0

l

,and are identified as A1, A3, L1, and L2,

,p i

.x.

1THE TOLEDO EDISON COMPANY.

EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 9001250319 900115 PDR-ADOCK 05000346

,* m P

PDC

N>

" ]{ '

e Dock:tlHumb;r 50-346.

i

+

-License Number'NPF-3 Serial Number 1758-Page 2.

0n December 19, 1989, a telephone. discussion between BWHS personnel and Mr.:B. J. Elliot, NRC/ Nuclear Reactor Regulation Materials Engineering Branch, was conducted regarding the NRC review schedule of BAW-1543,' Revision 3.

- Based-on this' discussion, it was determined that the.NRC would not complete

- its review of BAW-1543, Revision 3 prior to the start of the'DBNPS sixth refueling outage presently' scheduled.for February 1, 1990.

However, it was 3,

determined'a conditional approval for the insertion and withdrawal schedule cited'in the topical. report could be granted-to accommodate the DBNPS schedule. -Therefore, Toledo Edison herewith requests your approval of the

-insertion and withdrawal schedule-(Table 3-20 of BAW-1543, Revision 3 through and including the "End of Sixth Fuel Cycle" insertion and withdrawal plans),

as' revised by the January 9, 1990 B&W Owners Group submittal, by January 26,

. 1990.

If you have any questions, please contact Mr. R. W. Schrauder Manager -

i

~ Nuclear Licensing, at (419) 249-2366.