Forwards Safety Insp Rept 50-440/89-28 on 891121-900103. Violations Noted.Following Enforcement Conference on 900118, Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Actions Based on Findings of Insp
ML20006A095
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/12/1990
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20006A096 List:
References
EA-89-253, NUDOCS 9001250216
Download: ML20006A095 (2)


See also: IR 05000440/1989028

Text

TJ' b) iM CCDM

.

o

,.

-

.

,,

'

Docket No. 50-440

EA 89-253

The Cleveland Electric Illuminating

Company

ATTN:

Mr. Alvin Kaplan

Vice President

Nuclear Group

10 Center Road

Perry, OH 44081

Gentlemen:

This refers to the routine safety inspection conducted by_ Messrs. P. L. Hiland

and G. F. O'Dwyer of this office on November 21, 1989 through January 3, 1990,

of activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC Facility

Operating License No. NPF-58 and to the discussion of our findings with

M. D. Lyster and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements.

We are releasing this report at this time for your

l

information.

Following the Enforcement Conference which has been scheduled

for January 18, 1990, in the Region III Office, you will be notified by

separate correspondence of our decision regarding enforcement actions based on

the findings of this inspection.

No written response is required until you

are notified of the proposed enforcement actions.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Oricimi UE*a y w. L FoM

Edward G. Greenman, Director

Division of Reactor Projects

Enclosures:

Inspection Report

No. 50-440/89028(DRP)

.2 co m ]

See Attached Distribution

fr. G M.'r7

ys;

q6

i r+ e m

RIII

RIII

RII

RI .

R1

RIII

&% Ring /

"

^

1

of

Cnc

is,

heenman

-

9

-humacher

Knop NM

be

D

n/sm

/ a/9/

' /, 3s

' # 90

9001250216 900112

f

Pl>R

ADOCK 05000440

9

..

,l

.

The Cleveland Electric Illuminating

2

Company

JAN I 11990

Distribution

cc w/ enclosure:

F. R. Stead, Director, Nuclear

Support Department

M. D. Lyster, General Manager,

P3try Plant Operations Department

R. A. Newkirk, Manager,

Licensing and Compliance Section

S. F. Kensicki, Director, Perry

Plant Technical Department

H. Ray Caldwell, General

Superintendent Nuclear Operations

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Rc,ger Suppes, Ohio

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Commission

bec:

J. Lieberman, OE

J. Goldberg, OGC

J. Partlow, NRR