3F0190-04, Forwards Rev 10 to Inservice Insp - Pump & Valve Program, Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Program

From kanterella
(Redirected from ML20005G793)
Jump to navigation Jump to search
Forwards Rev 10 to Inservice Insp - Pump & Valve Program, Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Program
ML20005G793
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/10/1990
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20005G794 List:
References
3F0190-04, 3F190-4, GL-89-04, GL-89-4, NUDOCS 9001230099
Download: ML20005G793 (1)


Text

.

?hk, L*t >

i

.u a

p; W

. :m,

%,, W c

ny;y 1 CORPOR ATION 1 January.10, 1990

'3F0190-04 U.Sb Nuclear Regulatory Commission

Attn:' Document Control Desk-tWashington,LD.

C..

20555.

c

Subject:

Crystal 1 River Unit 3 Docket No.'.50-302

-Operating-License No. DPR-72 Pump' and Valve. Program Submittal.

Dear:

Sir:-

. Florida Power Corporation (FPC)Lsubmitted Revision 9 of-the Pump and Valve Program. on' October-3,- 1989 = in response to Generic Letter 89-04, " Guidance' on Developing Acceptable Inservice Testing Program". Please find attached Revision

~

10nto the Pump and Valve Program.

Changes l incorporated in this revision are L : submitted,in accordance with. Section 7.4 of the Instruction section of our approved program. :The changes are' editorial'in nature and are noted by a change bartin.the.left margin.

. Sincerely,.

n

.P.LM. Beard,Jr.

4 Senior Vice President Nuclear. Operations PMB:ead Attachment

xc

Regional JAdministrator, Region II Senior' Resident Inspector

/

o Ok fu

8g12ggggagg8tgg2 i\\

e POST OFFICE BOX 219

  • CRYSTAL RIVER, FLORIDA 326294219 + (904) 563 2943 A Florida Progress Company g..