Forwards Safety Insp Repts 50-454/89-11 & 50-455/89-13 on 891218-900103.No Violations Noted.Nrc Commends Util for Addressing Programmatic Aspects of Verification & Validation Issues Identified During Insp of Braidwood
ML20005G758
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/12/1990
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20005G759 List:
References
NUDOCS 9001230042
Download: ML20005G758 (2)


See also: IR 05000454/1989011

Text

. . .

.

.

.

.

.

JAN !2 1m

i

'

Docket No. 50-454

Docket No. 50-455

Comonwealth Edison Company

i

ATTN: Mr. Cordell Reed

i

Senior Vice President

Post Office Box 767

,

Chicago, IL 60690

)

Gentlemen:

This refers to the special safety inspection conducted by Mr. R. Hasse and

Ms. P. Rescheske of this office on December 18, 1989, through January 3, 1990,

i

of activities at Byron Nuclear Plant, Units 1 and 2, authorized by NRC Operating

Licenses No. NPF-37 and No. NPF-66 and to the discussion of our findings with

Mr. G. Schwartz and others of your staff at the conclusion of the inspection.

The purpose of this inspection was to determine if any Byron specific concerns

existed relating to your Emergency Operating Procedures (EOPs). A previous

E0P inspection at Braidwood had addressed those issues generic to both sites,

which were described in Inspection Reports No. 50-456/89011(DRS); and

50-457/89011(DRS).

The enclosed copy of our inspection resort identifies areas examined during

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

'

interviews with personnel.

l

No concerns were identified during this inspection that did not fall within

L

the generic concerns identified during the Braidwood inspection. Also we were

pleased that the programmatic aspects of the verification and validation

issues identified during the Braidwood inspection had been addressed.

You are

to be comended for this timely action.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC-

'

Public Document Room.

'

9001230042 90011%

'

{DR

ADOCK 05000454

i\\

PDC

/d W

.

.

.

. ._.

__

_ . .

.

.

.

.

.

.

JAN !2 1m

Comonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

,

H. J. Miller, Director

Division of Reactor Safety

Enclosures:

Inspection Reports

No. 50-454/89011(DRS)

No. 50-455/89013(DRS)

cc w/ enclosures:

T. J. Maiman, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

R. Pleniewicz, Station Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

,

Braidwood

D. W. Cassel, Jr., Esq.

Richard Hubbard

,

J. W. McCaffrey, Chief Public

Utilities Division

-

Diane Chavez. DAARE/ SAFE

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

W. Regan, LHFB, NRR

,

G. Galletti, LHFB, NRR

hh6

"

SS

RIII

III

III

III

RIII

II

MDM

F4 b

ch

,t

flartin

11er

-Hasse/gd/cg

e

sske

Tlaykon

P illips

i{lt{3e

0/////90

r/if

t(l Il

,Qc

d

.

.

.

-