ML20005G758
| ML20005G758 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/12/1990 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20005G759 | List: |
| References | |
| NUDOCS 9001230042 | |
| Download: ML20005G758 (2) | |
See also: IR 05000454/1989011
Text
. . .
.
.
.
.
.
JAN !2 1m
i
'
Docket No. 50-454
Docket No. 50-455
Comonwealth Edison Company
i
ATTN: Mr. Cordell Reed
i
Senior Vice President
Post Office Box 767
,
Chicago, IL 60690
)
Gentlemen:
This refers to the special safety inspection conducted by Mr. R. Hasse and
Ms. P. Rescheske of this office on December 18, 1989, through January 3, 1990,
i
of activities at Byron Nuclear Plant, Units 1 and 2, authorized by NRC Operating
Licenses No. NPF-37 and No. NPF-66 and to the discussion of our findings with
Mr. G. Schwartz and others of your staff at the conclusion of the inspection.
The purpose of this inspection was to determine if any Byron specific concerns
existed relating to your Emergency Operating Procedures (EOPs). A previous
E0P inspection at Braidwood had addressed those issues generic to both sites,
which were described in Inspection Reports No. 50-456/89011(DRS); and
50-457/89011(DRS).
The enclosed copy of our inspection resort identifies areas examined during
the inspection. Within these areas, tie inspection consisted of a selective
examination of procedures and representative records, observations, and
'
interviews with personnel.
l
No concerns were identified during this inspection that did not fall within
L
the generic concerns identified during the Braidwood inspection. Also we were
pleased that the programmatic aspects of the verification and validation
issues identified during the Braidwood inspection had been addressed.
You are
to be comended for this timely action.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC-
'
Public Document Room.
'
9001230042 90011%
'
{DR
ADOCK 05000454
i\\
/d W
.
.
.
. ._.
__
_ . .
.
.
.
.
.
.
JAN !2 1m
Comonwealth Edison Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
,
H. J. Miller, Director
Division of Reactor Safety
Enclosures:
Inspection Reports
No. 50-454/89011(DRS)
No. 50-455/89013(DRS)
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
T. Kovach, Nuclear
Licensing Manager
R. Pleniewicz, Station Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
,
Braidwood
D. W. Cassel, Jr., Esq.
Richard Hubbard
,
J. W. McCaffrey, Chief Public
Utilities Division
-
Diane Chavez. DAARE/ SAFE
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
W. Regan, LHFB, NRR
,
G. Galletti, LHFB, NRR
hh6
"
RIII
III
III
III
RIII
II
MDM
F4 b
ch
,t
flartin
11er
-Hasse/gd/cg
e
sske
Tlaykon
P illips
i{lt{3e
0/////90
r/if
t(l Il
,Qc
d
.
.
.
-