ML20005G574

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-155/OL-89-02 of Exams Administered from 891101-19 & Exams & Answer Keys.Util Requalification Program Assigned Overall Program Rating of Satisfactory
ML20005G574
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/03/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20005G575 List:
References
NUDOCS 9001190349
Download: ML20005G574 (2)


Text

-

y}-j%

g JAN 0 31990 7

p C

Docket.No. 504 55, E

- Consumers Power Company-

. ATTN: -Mr. David P. Hoffman.

'Vice President Nuclear Operations 1945 West Parnall-Road k

Jackson, MI 49201 L

Dear Mr. Hoffman.

Q

SUBJECT:

L REQUALIFICATION EXAMINATION REPORT

'During November 1-19, 1989,-the NRC administered requalification examinations j

to twelve employees of your_ organization who are licensed-at the Big Rock, Point Nuclear Power Station. The simulator evaluation-for these requalification examinations was given at the GE Simulator in Morris, Illinois on November.1,.

.6, and 11. 1989.=

Based.upon the results of this evaluation, your'requalification program has been assigned an:overall program rating of satisfactory, in accordance with i

the criteria of.NUREG-1021, Operator Licensing Examiner Standards, Revision 5 ES-601.-

The cooperation of your training staff in the development of the requalification-

[

examination, and specifically to surmount the unique problems in preparing the static simulation portion of the written examination without a representative simulator were commendable. Also, the operators, who were examined, were well prepared.

'4

'In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this. letter and the enclosures will be placed in the NRC Public Document Room.

Should^you have any questions concerning this examination, please contact us.

Sincerely, ORIGINAL SIGNED U OE Geoffrey C. Wright, Chief Operations Branch

Enclosures:

1.

Examination Report No. 50-155/0L-89-02 s

2. 'Exrminations and Answer Keys SR0/R0 See Attached Distribution RIII-RIII RIII RIII Ne it/gd/jk D e

J I

\\\\

01/02/90 01/ A/90 01/t/90 O1/ *) /90

/ )/ /

.9001190349 900103

/,

d PDR ADOCK 05000155 V-PNU

\\

el;gv o

y

4 -

s

.-);

s

-.. i g

4 Consumers Power Company-2 JAN'o 3 jgg

(

[

Ld5

-Distribution-JO cc w/ enclosures:

Mr. Kenneth W. Berry, Director 3

Nuclear Licensing-b Thomas W. Elward, Plant-

' Manager P

DCD/DCB (RIDS)-

[

. Licensing Fee Management Branch-U Resident Inspector, RIII-

. James R. Padgett-0 Michigan Department of-Public Health.

-D. G. Lacroix, Training-h-

Department, q

i w

}

~

i I

l' l

l l

l

.