ML20005G571

From kanterella
Jump to navigation Jump to search

Advises That Licensee 891107 IGSCC Insp Plan for Weld Meets Guidelines of Generic Ltr 88-01 & Acceptable
ML20005G571
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/12/1990
From: Ross T
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
GL-88-01, GL-88-1, TAC-75298, NUDOCS 9001190346
Download: ML20005G571 (3)


Text

m ww -

vn Qb}N x,

^ '

x

' January'12,'1990 j

gi ((a -

r.

' :s

-I

( Docket No. 50-265' p

F Thomas J'.5Kovach Nuclear Licensing. Manager Comonwealth Edison Company

-OPUS West III.

'1400 OPUS Place, Suite 300

~

Downers Grove, Illinois 60515 o

SUBJECT:

- QUAD CITIES, UNIT.2 CYCLE.II IGSCC INSPECTION PLAN (TAC NO.75298)

Reference:

L(a) Letter from R. Stols (Ceco) to Dr. Murley-(NRC) dated November 7, 1989

~

Dear Mr. :

Kovach:.

t

/>

-The Nuclaar Regulatory Commission (NRC) staff has reviewed reference

^

-(a) from. Commonwealth Edison Company (Ceco) regarding the intergranular

stress corrosion cracking (IGSCC) inspection plan to be performed at Quad x

Cities Unit 2_during the upcoming refueling outage. The staff concludes, that the proposed. inspection plan'_of welds susceptible to IGSCC meets the p

. guidelines of Generic Letter.-88-01'and is acceptable.

Sincerely, Thierry M. -Ross, Project Manager sm Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:-

See next page DISTRLBUTION Mucc m af ue d @'TRoss PDIII-2 r/f Bill Koo

'NRC & Local PDRs OGC LLuther EJordan ACRS(10)

[K0VACH6]

  • See Previous Concurrence Ok
  • PDIII-2:LA PDIII-M
  • PDIII-2:PD
  • EMCB LLuther TRoss/ta JCraig CYCheng I/I /90 01/02/90 01/03/90

\\\\D V

01/02/90 9001190346 900112 PDR ADOCK 05000263 PDC

e

]

D-Q f

f' ***!

1#

1 NUCLEAR REGULATORY COMMISSION I$

k' WASHINGTON, D. C. 20565

.a

k....,o

. January 12, 1990 q

Docket'No'. 50-265-LThomas J. Kovach

, Nuclear Licensing Manager.

. Commonwealth Edison. company

^

0 PUS West III.

g'

_1400 OPUS Place, Suite 300 Downers Grove, 1111nois 60515

SUBJECT:

QUAD CITIES, UNIT 2, CYCLE II IGSCC INSPECTION PLAN (TAC NO.75298)-

Reference': (a)'LetterfromR.Stols(Ceco)toDr.Murley(NRC) l

' dated. November 7, 1989 R

~.

Dear Mr. Kovach:

-The Nuclear Regulatory Comission (NRC) staff has reviewed reference

,(a) from comonwealth Edison Company (CECO) regarding the intergranular j

stress-corrosion cracking'(IGSCC) inspection plan to be performed.at Quad

-Cities Unit-2 during the upcoming refueling outage. The staff concludes, that'the proposed inspection plan of welds susceptible to IGSCC meets the

]

^1 guidelines-of. Generic Letter 88-01 and is acceptable.

Sincerely, w

W hierr Ross, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

?

e t-....m.

-, 7;3 61 g

j;"

. ;

  • u.

d'f zMr. Thont.s J. Kovach

' Quad Cities Nuclear Power Station Conwnwealth Edison Company Units-1.and_2

A o

.CC::

! r. Stephen E.'Shelton M

.Vice President lowa-1111ncis Gas'and a'

Electric Company:

P. O. Box 4350 eDavenport, lowa 52808-:

Michael I.: Miller, Esq.:

e Sidley and Austin

.One First National Plaza

' Chicago, Illinois 60603 lir. Richard Bax -

Station Manager-Quad. Cities-Nuclecr-Power Station

';22710 206th Avenue North

'Corduva,sIllinois 61242 Resident inspector U. S. Hut. lear Regulatory Comission-22712 E06th Avenue North

- Cordova, : Illinois _61242 Chairman ~'

' Rock Island County Board of-Supervisors =

1504 3rd Avenue

= Rock' Island County Office Bldg.

Rock Island,'1111nois 61201 Mr. Michael E. Parker, Chief Division-.of Engineering-Illinois Department of Huclear Safety 1035 Outer: Park Drive, Springfield,. Illinois 62704 Regional Administrator, Region III U. S., Nuclear Regulatory Comission 799 Roosevelt Road, Bldg. #4 Glen' Ellyn, Illinois 60137 3