Text
'[#
(A9
.I, n%; '
^
M
' 7"." E log-'# TXX-90005
?
c C
.O File # 10010-1 7t#ELECTR/C Ref. # 10CFR50.30(b) l i
January 4, 1990 Wlulman J. Cahul, Jr..
> Ewcutive ner haddrat I
p" U.-lS. Nuclear Regulatory Commission j
-Attnt Document Control Desk Washington, D. C.
20555 m
SUBJECT:
. COMANCHE PEAK STEAM' ELECTRIC STATION (CPSES)
[
v DOCKET N00. 50 445-AND'50 446
[
DOCKETING OF MISCELLANEOUS COMMITMENTS 7
. Gentlemen:
The following commitments were previously accepted by TV Electric and, at the E
request of the-NRC, are formally docketed by-this letter:
1
,1..TMI' Item I.D.1 Control Room Design Review 1
-o A review of Emergency Operating Procedures (EOP's) will be performed to verify that the parameters required by procedures are consistent with the actual display' parameters-(e.g;, terminology and labeling).
.This-review'will be performed and a report submitted to the NRC gq prior to exceeding 5% power for Unit 1.
.o The final' control room environmental survey will be completed and an
.i action. plan to-implement any corrective actions.resulting from the survey will be provided to the NRC staff prior to exceeding 5% power F
for Unit 1.
- 2. ' Turbine Disk' Inspection
-0 The inspection procedures and the results of the inspection will be available on site for NRC review upon completion of the initial Unit' 1 ultrasonic inspection of the bore'and keyway areas of the low pressure turbine disks.
i
'3.
N-16 Transit Time Flow Meter (TTFM) o ' Performance data for the N-16 TTFM will be collected for review and evaluation during the first cycle of Unit 1.
These data will be submitted to the NRC within 60 days following the startup after the first cycle to further support the uncertainty analysis of the N 16 TTFM.
<9001190318 900104 g%x k[ol PDR ADOCK 05000445 I
_A-PNU 400 North Olive Street LB. 81 Dallas, Texas 75201 i
1]
il
[,,
4.yo..>.;
,TXX-90005' January 4,.1990 Page 2 of 2 4.
Unit 2 Pressurizer Safety and Relief Analysis o Prior to Unit 2 fuel load TV Electric will submit-a Unit 2 pressurizer safety and relief valve line thermohydraulic analysis, or demonstrate that the analysis submitted for Unit 1 in TXX-4849 dated June 13, 1986, adequately represents the Unit 2 conditions.
l Sincerely, r1]f
)f William J. Cahill, Jr.
i By:
&th R. D Walker Manager, Nuclear Licensing i
BSD/bsd i
s c - Mr. R. D. Martin, Region IV Resident' Inspectors CPSES (3)
+