ML20005G504
| ML20005G504 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/09/1990 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| EA-89-254, NUDOCS 9001190255 | |
| Download: ML20005G504 (3) | |
Text
.;;. 3 n.
I Q..
o uo6.
UNITED STATES w
j
..i (
~ NUCLEAR' REGULATORY COMMISslON
..r o-REGION lil--
i
. re f'
799 ROOSEVELT ROAD.
8,* * * *
- of j
JAN 0 91990
/?
Docket No. 50-2661 Docket Nof 50-301:
EA No. 89-254-Wisconsin Electric Power Company ATTN: = - Mr. C. W. Fay 1
Vice President--
Nuclear Power.
l231 West Michigan Street - P379
-l 3
~ Milwaukee, WI-53201-Gentlemen:'
i This confirms our~ plans as discussed between Mr. J. J. -Zach of your staff and Mr. C.' L. ~ Vanderniet of this office to conduct an. Enforcement Confere6ce at
-1:00 p.m... (CST) on Tuesday, January 16, 1990, at-the Region'III Office in Glen Ellyn, Illinois. -.The. purpose of the Enforcement Conference is to discuss-apparent-violations concerning;the design deficiency of the d-c distribution 1
- system and the-subsequent' corrective actions taken as a result of these 1 deficiencies. At the Enforcement Conference you should be prepared to discuss
-the' topics. listed.in the enclosure.
l
, e will gladly _ discuss any: questions you may have concerning:this matter.1 W
Sincerely,-
[
h_ m Edward G. Greenman,-Director Division of: Reactor Projects
Enclosure:
Enforcement Conference
' Discussion ~ Topics J
See Attached Distribution:
l 4
i t
y
- i4 j
2
/
3 {
6
!9001190255 890109 6
li PDR-ADOCK 05000266
!g L!G-PNU
{~
1 --,
JAN 0 91990
- Distribution:
cc:
J. J..Zach, Plant Manager DCD/DCBljRI.05)
~ " Licensing Fee Management Branch Resident Inspector, RIII Virgil Kanable, Chief Boiler Section Charles Thompson, Chairman Wisconsin Public Service Connission L
R.l.-Braund(SLO),
.WI Div. of Emergency Government Lawrence J. McDonnell, Chief Radiation Protection Section WI Department of Health and Social Services, Division of Health-9 t
l l
d /_
I.
y i
ENCLOSURE ENFORCEMENT CONFERENCE DISCUSSION TOPICS 1.
The safety significance of the failure to meet the single failure criteria as a result of the design deficiency in the d-c electrical distribution system breakers.
7 2.
Subsequent corrective actions taken as a result of these deficiencies and the tineliness of these actions considering the problem was identified in January 1988 and not correct until November 1989.
3.
Schedule for restoration of the d-c electrical distribution system to its normal lineup.
Include any corrective actions or evaluations 1
cegarding the remaining thermal-only trip breakers.
^
4.
Management systems for prioritization of open items including SSFI findings that have a potential safety significance.
Timetable for addressing and correcting these items.
5.
Corrective actions to improve how the commitment tracking system tracks issues to resolution in a timely manner with respect to their potential safety significance.