Proposed Tech Specs Re Changes to Control Room Air Treatment Sys
ML20005G449
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/12/1990
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20005G446 List:
References
NUDOCS 9001190168
Download: ML20005G449 (6)


Text

.

v p ,1

% WO%N6' 7

, .,.- 2.0 LIMITING CONDITIONS FOR OPERATION

,C L 2.12 Control Room Svetems Applicability I.-

Applies to the control room air conditioning and filtering systems. l Objective To limit. the environmental conditions in the control room, under normal and post DBA conditions.

I Speci fic ations (1) If the ' control room air temperature reaches 1200F, immediate action shall be taken to reduce this temperature. If the temperature cannot be reduced to. below 1200F in f0ur hours ,

the reactor vill be placed in a hot shutdown condition.

(2) A thermemeter must be in the control room at all times.

(3) All areas of the plant which have safety related instrumentation vill be observed durin6 hot functional testing to determine local temperatures and monitored during operation if normal plant ventilation is not available.

(b) Frem and after the date that the control room air. treatment system is made or found to be inoperable for any reason, reactor operation is permissable only during the succeeding seven days unless such circuit is sooner made operable. If these conditions cannot be met, the reactor shall be placed in cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Basis The reactor protective system and the engineered safeguards system were designed for and the instrumentation was tested at 120 0F,

' herefore, if the temperature of the centrol room exceeds 1200F, thc reactor vill be shutdown and the conditions corrected to preclude failure of components in an untested environment.

r the centrol room air treatment system is found to be inoperable ,

there is no immediate threat to the control room and reactor opera-tion may centinue for a limited period of time while repairs are being made. If the system cannet be repaired within seven (7) days, the reactor is shutdown and brou6ht to cold shutdown within 2h hours.

9001190168 900112 PDR ADOCK 05000285 P

PDC 2-59 Amen dment No, 15 -

E- ]

L,-

' euoGbssb cnAM C b - suanianu An ^

sw s, A% L sc.- typ- BSo l 2.0 LIMITING CONDITIONS FOR OPERATION I p i 2.12 Control Room Systems I applicability 1

Applies to the control room air conditioning and filtering systems, j Ob.iective To limit the environmental conditions in the control room, under normal  :

and post DBA conditions. '

Soecifications ,

i (1) If the control room air temperature reaches 120*F, immediate action  !

shall be taken to reduce this temperature. If the temperature cannot be reduced to below 120'F in four hours, the reactor will be placed in a hot shutdown condition.

(2) A thermometer must be in the control room at all times.

(3) All areas of the plant which have safety related instrumentation will be observed during. hot functional testing to determine local-temperatures and monitored during operation if normal plant ventilation is not available.

(4) With one control room air filtration system inoperable, restore the inoperable system to operable status within 7 days or be in at least ,

cold shutdown condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. '

Basis '

The reactor protective system and the engineered safeguards system were designed for and the instrumentation was tested at 120*F. Therefore, if the temperature of the control room exceeds 120*F, the reactor will be shutdown and the conditions corrected to preclude failure of components in an untested environment. '

If the control room air temperature system is found to be inoperable, f there is no immediate threat to the control room and reactor operation

'may continue for a limited period of time while repairs are being made.

If the system cannot be repaired within seven (7) days, the reactor is shutdown and brought to cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2-59 Amendment No. LS

MM kbk 6 (p M A' d _

M^b j . g , w .. h r d h l j 9 8 ,

2.0 m - 89_ l139 e LIMI*TNO CONDIT!0NS FOR OPEP.AT!Ctf 2.12 Centr:1 Fecm Srctems Ateliesbilit r Applies to the cente:1 rec = air cenditiening and filtering systems.

Obieetive To limit and postthe03Aenviren=

conditiens. ental conditi:ns in the centr:1 rec =, under nernal S ecifica-icts (1)

If the centr:1 r::= air te=perature reaches 1200F, imediate acti:n shall be ta. ken to reduce this temperature. If the tenperature cannet be reduced to belev 1200F in four hcurs ,

the reset:r vill be placed in a het shutdevn condition.

(2)

A ther===eter =ust be in the centrol ree: at all t ir.e s .

(2)

All areas cf the plant which have safety related instrumentation vill be observed during het functienal testing to determine local te=peratures and =enitored during operatien if nor=al

.pir. . ventilation is n:t available.

' ( !* ) x. . .e. r.. .au f.. ; .... .. .... .. - ...

syste: -d u . . .-- -

e er found to be inoperable fer ana . .n ,

7 reacter cperatica .. ,. d able en k ' . . the succeedint teven days unless such M-- s

- de operable.

These cendi - . nnet be =et, the.. reacter sha- ..

I:

b .---a-.- ,;,,i;; ; g .s - u - % s -.. .

et 3 asis:

The react:r pr:tective system snd the eng&neered safeguards syste=

vere designed fer er.d the inst:.:=entatien was tested at 1200F, Therefore , if the temperature cf the centrol rec = exceeds 1200 F, the reset:r vill be shutd:vn and the cenditiens corrected to preclude failure cf c:=penents in an untested enviren=ent.

If- the centr:1 rec = air treatment system is found to be ineperable ,

there is no i==ediate threat to the cent:01 reem and reactor opera-made. may centinue f:r a limited period of time while repairs are being tien If the syste= cannet be repaired vithin seven (i) days, the reacter is shutd:*.r. er.d brought to cold shutdevn vithin 2L hours.

Yhtb owa. c. . <i t. e c i co.m d ,- S h v ec ie w s y s t*m t'et v oe *- tA e m o e ev = Me s w a r e edle.j

  • $ O '" s y sv.s m ce o p av = bl e_ 6c4tas 7d W .s o v- b e. s' w c ) < 3 t- c. 1 .\ S b rd.e cowAbc-[ow wiv.W cke 4onowc%

, 7. 4 6.uys,

~

2-50 k:eni .ent :::. :.5

... d h g.

-h 1 s

i r

g . ,

b.. )

,i

?

) ,

[ I.

i r

I f r i 1

r, v-j 3-s .

k, r

[ .

1

[

i.

i . rg C

s

> i I

l- .

r .

i i.

ATTACHMENT B .

)

' i.

?

+

9

?

t .

f i

t f

b 1

l 1,-

1: ,f 1

1 l I

\

r 1

l l-l

1. .

j '..

t w---. . -- ------ . ._ ._- , , , , . . - ,. , -.--..,n-.

l e[ '-

\c 1pi.. . e

"*~

"i hPoSED C WAM6E To cud $uM dst. A ,

h,n S e h M M d. 8)19 89 Lic.- ecy- g e l

w( -

l f .

i y' f-Paae 2-59, 2.12(4), Control Room Systems. Control Room Air Treatment -

Ts.

- !;'i'

. This, administrative change clarifies the control- room air treatment l

. operability requirements by replacing the legalese statement with the 7,

words from the standard technical specifications- '

r,..

y p

i  :>

-l I! >

p J'

s i

r

'f E

L 1

1 T

1 9- ,

v

?

Je

j.
- 5 f 1

r 2-B

, w y__ ,

~7Ls:Agn. M TNE. MestEb Mc-Tto4 ~bE2 c V/ EQoM OL.s SO6MtTTA DWb bEc.if9fb9, L tc. Eb9- t139

,, Pane 2-39, Refueling Operations (continued) t This change corrects a typographical error in the word " concentration".

References to "FSAR" are changed to "USAR" and reference (2) is changed to b refer to a more applicable section of the USAR.

Paae 2-57c, 2.10.4(5) Power Distribution Limits E

Should read "... Above 15f.' g.f Rated Power" - typographical error.

0--

?la, ?.!?(4), Centr:1 ore- 4:t: :, Cretr:1 9::: " 'r::t :r' 3*.L.ma E This~ administrative change O "- ihe control room air treatment operability ' Ci. .....nts by replacing the legaiva :ti+== ant with the ords 1- ae :t:-dird t:Pical :; :i'!::ti:r.:. s Pace 2-98, Table 2-10, Post Accident Monitoring Instrumentation Operating Limits l

This change corrects a' typographical error, form "LT-559" to "LT 599", in item 5 of the Table.

^

Fiaure 2-8, Flux Peaking Augmentation Factor This change adds the, Amendment number which is not legible.

Table 3-1, Minimum Frequency for Checks, Calibrations and Testing of Reactor Protective Systems.

~ Th_is change adds ~ " Amendment 60", which was omitted from the page.

Pace 3-62a, 3.9 Basis

~The temperature and operating conditions were changed to agree with the USAR,. Section 9.3.1, and accurately reflect the design basis of the shutdown-cooling system.

Paae 5-3, 5.5.1.2 u The title " Plant chemist" is changed to " Supervisor - Chemistry" to conform with present station organization.

Pace 5-12,.5.9.2(c)

The word " arrive" is changed to "be postmarked" to provide a more definitive requirement for submittal of the Monthly Operating Report and provide sufficient time for preparation and processing of the Monthly j Operating Report. l 1