MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 ML20078P8251995-02-10010 February 1995 Proposed Tech Specs 2.10 to Relocate Requirements for Incore Instrumentation Sys ML20077S1691995-01-0909 January 1995 Proposed Tech Specs,Reflecting Deletion of Requirements for Toxic Gas Monitoring Sys ML20078G8981994-11-11011 November 1994 Proposed Tech Specs 5.2 & 5.5,reflecting Administrative Changes ML20024J3921994-10-0707 October 1994 Proposed Tech Specs,Deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 to Reflect Changes ML20069H9261994-06-0606 June 1994 Proposed Tech Specs Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rcps ML20069D8451994-05-25025 May 1994 Proposed Tech Specs Requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4211993-12-28028 December 1993 Proposed TS Tables 3-1 & 3-2 Re Min Frequencies for Checks, Calibrs & Testing of RPS & Min Frequencies for Checks, Calibrs & Testing of ESFs & Instrumentation & Controls, Respectively LIC-93-0228, Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys1993-08-20020 August 1993 Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys ML20045H1791993-07-12012 July 1993 Proposed TS 2.14,Table 2-1,Item 6.b Re ESF Sys Initiation, Degraded Voltage Setting Limits LIC-93-0159, Proposed Tech Specs Incorporating Administrative Changes1993-06-17017 June 1993 Proposed Tech Specs Incorporating Administrative Changes ML20128E5341993-02-0808 February 1993 Proposed Tech Specs Deleting Section 5.9.4 Re Radioactive Effluent Release Rept.Draft Chemistry Manual Procedure Encl ML20128C0461993-02-0101 February 1993 Proposed TS Figures 2-1A & 2-1B Re pressure-temp Limits for Heatup & Cooldown,Respectively 1999-05-26
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] |
Text
.
v p ,1
% WO%N6' 7
, .,.- 2.0 LIMITING CONDITIONS FOR OPERATION
,C L 2.12 Control Room Svetems Applicability I.-
Applies to the control room air conditioning and filtering systems. l Objective To limit. the environmental conditions in the control room, under normal and post DBA conditions.
I Speci fic ations (1) If the ' control room air temperature reaches 1200F, immediate action shall be taken to reduce this temperature. If the temperature cannot be reduced to. below 1200F in f0ur hours ,
the reactor vill be placed in a hot shutdown condition.
(2) A thermemeter must be in the control room at all times.
(3) All areas of the plant which have safety related instrumentation vill be observed durin6 hot functional testing to determine local temperatures and monitored during operation if normal plant ventilation is not available.
(b) Frem and after the date that the control room air. treatment system is made or found to be inoperable for any reason, reactor operation is permissable only during the succeeding seven days unless such circuit is sooner made operable. If these conditions cannot be met, the reactor shall be placed in cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Basis The reactor protective system and the engineered safeguards system were designed for and the instrumentation was tested at 120 0F,
' herefore, if the temperature of the centrol room exceeds 1200F, thc reactor vill be shutdown and the conditions corrected to preclude failure of components in an untested environment.
r the centrol room air treatment system is found to be inoperable ,
there is no immediate threat to the control room and reactor opera-tion may centinue for a limited period of time while repairs are being made. If the system cannet be repaired within seven (7) days, the reactor is shutdown and brou6ht to cold shutdown within 2h hours.
9001190168 900112 PDR ADOCK 05000285 P
PDC 2-59 Amen dment No, 15 -
E- ]
L,-
' euoGbssb cnAM C b - suanianu An ^
sw s, A% L sc.- typ- BSo l 2.0 LIMITING CONDITIONS FOR OPERATION I p i 2.12 Control Room Systems I applicability 1
Applies to the control room air conditioning and filtering systems, j Ob.iective To limit the environmental conditions in the control room, under normal :
and post DBA conditions. '
Soecifications ,
i (1) If the control room air temperature reaches 120*F, immediate action !
shall be taken to reduce this temperature. If the temperature cannot be reduced to below 120'F in four hours, the reactor will be placed in a hot shutdown condition.
(2) A thermometer must be in the control room at all times.
(3) All areas of the plant which have safety related instrumentation will be observed during. hot functional testing to determine local-temperatures and monitored during operation if normal plant ventilation is not available.
(4) With one control room air filtration system inoperable, restore the inoperable system to operable status within 7 days or be in at least ,
cold shutdown condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. '
Basis '
The reactor protective system and the engineered safeguards system were designed for and the instrumentation was tested at 120*F. Therefore, if the temperature of the control room exceeds 120*F, the reactor will be shutdown and the conditions corrected to preclude failure of components in an untested environment. '
If the control room air temperature system is found to be inoperable, f there is no immediate threat to the control room and reactor operation
'may continue for a limited period of time while repairs are being made.
If the system cannot be repaired within seven (7) days, the reactor is shutdown and brought to cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2-59 Amendment No. LS
MM kbk 6 (p M A' d _
M^b j . g , w .. h r d h l j 9 8 ,
2.0 m - 89_ l139 e LIMI*TNO CONDIT!0NS FOR OPEP.AT!Ctf 2.12 Centr:1 Fecm Srctems Ateliesbilit r Applies to the cente:1 rec = air cenditiening and filtering systems.
Obieetive To limit and postthe03Aenviren=
conditiens. ental conditi:ns in the centr:1 rec =, under nernal S ecifica-icts (1)
If the centr:1 r::= air te=perature reaches 1200F, imediate acti:n shall be ta. ken to reduce this temperature. If the tenperature cannet be reduced to belev 1200F in four hcurs ,
the reset:r vill be placed in a het shutdevn condition.
(2)
A ther===eter =ust be in the centrol ree: at all t ir.e s .
(2)
All areas cf the plant which have safety related instrumentation vill be observed during het functienal testing to determine local te=peratures and =enitored during operatien if nor=al
.pir. . ventilation is n:t available.
' ( !* ) x. . .e. r.. .au f.. ; .... .. .... .. - ...
syste: -d u . . .-- -
e er found to be inoperable fer ana . .n ,
7 reacter cperatica .. ,. d able en k ' . . the succeedint teven days unless such M-- s
- de operable.
These cendi - . nnet be =et, the.. reacter sha- ..
I:
b .---a-.- ,;,,i;; ; g .s - u - % s -.. .
et 3 asis:
The react:r pr:tective system snd the eng&neered safeguards syste=
vere designed fer er.d the inst:.:=entatien was tested at 1200F, Therefore , if the temperature cf the centrol rec = exceeds 1200 F, the reset:r vill be shutd:vn and the cenditiens corrected to preclude failure cf c:=penents in an untested enviren=ent.
If- the centr:1 rec = air treatment system is found to be ineperable ,
there is no i==ediate threat to the cent:01 reem and reactor opera-made. may centinue f:r a limited period of time while repairs are being tien If the syste= cannet be repaired vithin seven (i) days, the reacter is shutd:*.r. er.d brought to cold shutdevn vithin 2L hours.
Yhtb owa. c. . <i t. e c i co.m d ,- S h v ec ie w s y s t*m t'et v oe *- tA e m o e ev = Me s w a r e edle.j
- $ O '" s y sv.s m ce o p av = bl e_ 6c4tas 7d W .s o v- b e. s' w c ) < 3 t- c. 1 .\ S b rd.e cowAbc-[ow wiv.W cke 4onowc%
, 7. 4 6.uys,
~
2-50 k:eni .ent :::. :.5
... d h g.
-h 1 s
i r
g . ,
b.. )
,i
?
) ,
[ I.
i r
I f r i 1
r, v-j 3-s .
k, r
[ .
1
[
i.
i . rg C
s
> i I
l- .
r .
i i.
ATTACHMENT B .
)
' i.
?
+
9
?
t .
f i
t f
b 1
l 1,-
1: ,f 1
1 l I
\
r 1
l l-l
- 1. .
j '..
t w---. . -- ------ . ._ ._- , , , , . . - ,. , -.--..,n-.
l e[ '-
\c 1pi.. . e
"*~
"i hPoSED C WAM6E To cud $uM dst. A ,
h,n S e h M M d. 8)19 89 Lic.- ecy- g e l
- w( -
l f .
i y' f-Paae 2-59, 2.12(4), Control Room Systems. Control Room Air Treatment -
Ts.
- !;'i'
. This, administrative change clarifies the control- room air treatment l
. operability requirements by replacing the legalese statement with the 7,
words from the standard technical specifications- '
r,..
y p
i :>
-l I! >
p J'
s i
r
'f E
L 1
1 T
1 9- ,
v
?
Je
- j.
- - 5 f 1
r 2-B
, w y__ ,
~7Ls:Agn. M TNE. MestEb Mc-Tto4 ~bE2 c V/ EQoM OL.s SO6MtTTA DWb bEc.if9fb9, L tc. Eb9- t139
,, Pane 2-39, Refueling Operations (continued) t This change corrects a typographical error in the word " concentration".
References to "FSAR" are changed to "USAR" and reference (2) is changed to b refer to a more applicable section of the USAR.
Paae 2-57c, 2.10.4(5) Power Distribution Limits E
Should read "... Above 15f.' g.f Rated Power" - typographical error.
0--
?la, ?.!?(4), Centr:1 ore- 4:t: :, Cretr:1 9::: " 'r::t :r' 3*.L.ma E This~ administrative change O "- ihe control room air treatment operability ' Ci. .....nts by replacing the legaiva :ti+== ant with the ords 1- ae :t:-dird t:Pical :; :i'!::ti:r.:. s Pace 2-98, Table 2-10, Post Accident Monitoring Instrumentation Operating Limits l
This change corrects a' typographical error, form "LT-559" to "LT 599", in item 5 of the Table.
^
Fiaure 2-8, Flux Peaking Augmentation Factor This change adds the, Amendment number which is not legible.
Table 3-1, Minimum Frequency for Checks, Calibrations and Testing of Reactor Protective Systems.
~ Th_is change adds ~ " Amendment 60", which was omitted from the page.
Pace 3-62a, 3.9 Basis
~The temperature and operating conditions were changed to agree with the USAR,. Section 9.3.1, and accurately reflect the design basis of the shutdown-cooling system.
Paae 5-3, 5.5.1.2 u The title " Plant chemist" is changed to " Supervisor - Chemistry" to conform with present station organization.
Pace 5-12,.5.9.2(c)
The word " arrive" is changed to "be postmarked" to provide a more definitive requirement for submittal of the Monthly Operating Report and provide sufficient time for preparation and processing of the Monthly j Operating Report. l 1
l i
ATTACHMENT B Page 2 of 3 !