Text
.
s
+,n j
- ,; j r >
M ;a f. ',,
,1 hr,
,9s f
DEC 2 81989 l
P
' Docket Nos. 50-277 4
c, h
e 50-278 b
'Niladelphia: Electric Company ATTN:
Mr.'C. A. McNeill Executive Vice President-Nuclear 1-Correspondence Control Desk P. O. Box 7520
- Philadelphia, Pennsylvania 19101 j
Gentlemen:
3 p'
Subject:
Implementation of Regulatory Guide 1.97 for Peach Bottom Units 2&3 L
This letter confirms the dates of January 8-12, 1990 for the Regulatory Guide l
1.97 inspection at Peach Bottom Units 2&3. Our plans for this inspection were c
discussed with your staff during a telephone call between Mr. David Foss of your organization and Mr. Leonard Cheung of the NRC Region I office. The
. inspection will;take place at the Peach Bottom site in Delta, Pennsylvania.
L A management entrance meeting is scheduled for 10:30 a.m. on January 8, 1990.
The management exit meeting is tentatively ' scheduled for January 12, 1990 at 2:00 p.m.
For this inspection we will require the following:
-1.
Calibration Records for Category 1, type A, B and C variables 2.
Loop Diagrams and Schematics
- c
3.
P& ids 4.
Power Source Diagrams 5.
Diagram of Control Room Panel (location of instruments) 6.
EQ Master List The above information is to be made available at the inspection site on Januhry 8, 1990.
We will reauire one copy of the list of the Category 1, type A, B & C variables for Peach Bottom Units 2&3 one week prior to the inspection.
Your cooperation with us during this inspection will be appreciated.
Should you have any questions regarding the inspection, you can contact Mr. Leonard Cheung at 215-337-5296 or Mr. C. Anderson at 215-337-5376.
1 Sincerely, e s.....m c.,3 g i
R" r. n.,
Marvin W. Hodges, Director Division of Reactor Safety
)
0FFICIAL RECORD COPY CHEUNG12/21/89 - 0001.0.0 12/27/89 y
9'0011'0378 891228 3'. Q l 0
pR-ADOCK 05000277 PUQD m
4
+..
- r... _
G DEC 2 81989 Philadelphia Electric Company 2
cc w/ enc 1:
S. Newberry, NRR C. Anderson, DRS/RI D. R. Helwig, Vice President, Nuclear Services E. C. Kistter, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urba-n, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station T. E. Cribbe, Regulatory-Engineer,' Peach Bottom Atomic Power Station J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station Troy B. - Conner, Jr., Esquire W. H. Hirit, Director, Joint Generation Projects Department, Atlantic Electric Bryan W: Gorman, Manager, External Affairs E. J. Collen, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire Thomas Magette, Power Plant-Siting, Nuclear Evaluations G. A. Hunger, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council R. J. Lees, Chairman, Nuclear Review Board
'Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania bec w/ enc 1:
Region I Docket Room (with concurrences) i t=:;==t ^,ssi etent, DTA -(,,/o unc1)
DRP Section Chief Mont Conner, SALP Reports Only
.. - u.,
...rer u ou n, in em v.,
,myv, o R. Martin, NRR J. Dyer, EDO S. Newberry, NRR C. Ande,rson j
i 4
6f f
61 M)
/
RI:DRS RI:DRS RI:DRS RI R
Cheung/rw Anderson Durr Hod s 12/tr/89 12h 7/89 12/y/289 1/
9 I
0FFICIAL RECORD COPY CHEUNG12/21/89 - 0001.1.0 12/27/89