ML20005G260

From kanterella
Jump to navigation Jump to search
Ro:On 891208,1 H Rept Issued Re Use of non-IEEE 383 Flame Tested Cabling in safety-related Areas at Plant.Further Review Determined That Subj Cabling Qualified for Flame Testing Purposes.Initial 1 H Rept Withdrawn
ML20005G260
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/04/1990
From: Hagan J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001180355
Download: ML20005G260 (1)


Text

.

[

r e

'4

+

5 4

A,i OiPSEGi' L

c 4" ' r

};

8 L Public Service Electric and Gas Compan..

P.O. Box 236 Hancocks Bridge New Jersey 08038-s s

u-R H' ope Creek 'Operatisn's

.4-u:

I t_-

i January.4, 1990-x g,

5 TU.Sk Nuclear l Regulatory Commission Document Control Desk ~

LWashington,.DC.

20555 o

f

-~

Dear Sir:

HOPE CREEK GENERATING' STATION-l D O C K E T N O..--' 5 0 - 3 5 4 :

UNIT NO.el-.

_On 12/8/89-at'1540,Da-one-hour non-emergency report was made to

.thetNRC' Operations ~' Center regarding..the.use of-.non-IEEE. 383' 4

flamettested, cabling
in-safety related~ areas at-Hope. Creek.

Further-investigation -has determined that. the~ cabling in Lquestion,-is/ qualified to Underwriters-Laboratory-Std. 1581 for s

flame" testing ; purposes.

.U.L..

1581 has been evaluated as equivalent tolIEEE 383 for-the purposes of flame testing, and

+

lascsuch,-

the. subject cabling. meets the intent for use as-

-describedEin the-station UFSAR and SER.

1By'issuancecof. this letter, we. withdraw our initial ~ one-hour

' report and'~ will not issue a Licensee Event Report for this

-event.t The one-hour report was made with the-best available

' data:at. the : time' of discovery, but-has subsequently been

. determined ^to have-been unnecessary, y

Y sincerely, J. J. 2 3an General Manager -

Hope Creek Operations RBC/-

C Distribution 9001180355 900104

\\

PDR ADOCK 05000354 PDC

/ el S

lo zi/

The Energy People 95 2173(0 5 % l 88

.